hotcopper.com.au/threads/...gm-east.5974406/?post_id=51995552
HIGH GRADE FIRST RESULTS AT PARADIGM EAST
INCLUDE12m mit 3.3 g/t Au
Inc.4m 6g/t AuDrilling
results show
mineralisation
surfaces over 1.8kmalongtheParadigm East corridor
hotcopper.com.au/threads/ann-4m-raised-to-propel-mt-…
$4 Million Raised to Propel Mt Stirling Drill Campaign Throughout 2021
,,drilling at the Mt Stirling Gold Project throughout 2021
50,000 metres,, of drilling is now planned at the Mt Stirling Gold Project:
25,000m Air Vacuum (AV) drilling
20,000m of Reverse Circulation (RC) drilling; and
5,000m of Diamond drilling
The placement was cornerstoned by an existing long-term shareholder
The placement was heavily oversubscribed with bids in excess of $7.5M received
Torian’s executive Directors have committed an additional $50,000 to the placement
Interpreted strike of the Mt Stirling gold system now exceeds ~800m and remains open in all
directions
Mt Stirling Main Zone; Mt Stirling Hanging Wall and Viserion lode all remain OPEN along strike
and down-dip; RC drilling is on-going with further extension holes in progress
Assays results and footprint continue to track on par and consistent with regional significant
discoveries, e.g. St Barbara’s (ASX:SBM) 4.8Moz Gwalia Mine and Saracen’s (ASX:SAR) 3.8Moz
Thunderbox Mine, with the Mt Stirling Gold System remaining open in all directions
Torian awaiting results from 20 drill holes at Mt Stirling, 16 holes at Stirling Well and 19 holes from
Diorite, with results forthcoming
Mt Stirling Well Phase 2 extensional drilling (35 RC holes) to commence this week
Mt Stirling Regional targeting has identified numerous Priority 1 and Priority 2 targets along four
key structural corridors; Viserion Shear (3.4km); Wonambi Shear (2.2km); Ursus Fault
(2.5km) and Blue Jacket (2.2km) for immediate follow-up exploration including AV drilli