Habe gerade 10.000 Aktien eingelocht. Hoffentlich klappt das auch alles so.
|
Habe gerade 10.000 Aktien eingelocht. Hoffentlich klappt das auch alles so.
Altona Mining's (ASX: AOH) two key assets are the Outokumpu Project in Finland and the Roseby Project in Queensland, Australia. The Kylylahti mine at Outokumpu is under development, Altona is targeting production of 8,000 tonnes of copper, 8,400 ounces of gold and 1,600 tonnes of zinc annually.
Roseby is one of the largest copper resources in Australia, where Altona is targeting copper production of up to 40,000 tonnes per annum.
Wednesday, November 16, 2011 by Jeff Coote
Altona Mining (ASX: AOH) has intersected further copper mineralisation from reverse circulation drilling at its 100%-owned Roseby Copper Project in the Mt Isa-Cloncurry mining district in Queensland.
The drilling targeted strike and dip extensions to the Blackard Deposit and the Lady Clayre Deposit whilst drilling at Little Eva North tested a possible repeat of the Little Eva main zone.
Better intersections from drilling at a 0.30% copper cut-off grade include:
Blackard
- 67 metres at 0.89% copper from 94 metres;
- 91 metres at 0.87% copper from 65 metres; and
- 72 metres at 0.81% copper from 32 metres.
Lady Clayre
- 9 metres at 1.41% copper and 0.48 grams per tonne (g/t) gold from 6 metres;
- 16 metres at 1.20% copper and 0.50 g/t gold from 144 metres; and
- 15 metres at 1.11% copper and 0.76 g/t gold from 71 metres.
Little Eva North
- 4 metres at 2.26% copper and 0.89 g/t gold from 47 metres;
- 7 metres at 0.43% copper from 20 metres; and
- 10 metres at 0.38% copper and 0.2 g/t gold from 59 metres.
The latest drilling consisted of 41 reverse circulation drill holes for 6,006 metres and three diamond drill holes for 549 metres.
The drilling was designed to increase resources and improve understanding of the continuity and style of mineralisation. Diamond drilling at Blackard was also conducted to provide material for metallurgical test work.
The wet season has now commenced in the Cloncurry area and as a result the final resource estimate is not expected until late December at the earliest.
Roseby is one of Australia’s largest undeveloped copper resources covering over 1,400 square kilometres and is a major strategic land holding being only 95 kilometres northeast of the major mining centre of Mt Isa.
Despite the large copper and gold Resources that have already been declared, the project remains highly prospective and under-explored.
In addition to excellent copper and gold exploration potential, the project is prospective for the discovery of uranium, molybdenum, rare earth elements (REE) and zinc deposits
A Definitive Feasibility Study (DFS) completed in 2009 envisaged the production of 26,000 tonnes per annum of copper, and 7,500 ounces per annum of gold for 10 years from a 5Mtpa open pit-mining operation.
Environmental and regulatory approvals for construction of this substantial mining operation are well advanced. A new DFS targeting a larger operation is scheduled for completion in 2012.
Outperform: Credit Suisse sieht Kursziel für Altona Mining bei 0,65 australischen Dollar
14:35 17.11.11
Hinweis: ARIVA.DE veröffentlicht in dieser Rubrik Analysen, Kolumnen und Nachrichten aus verschiedenen Quellen. Verantwortlich für den Inhalt ist allein der jeweilige Autor.
ltona Mining's (ASX: AOH) two key assets are the Outokumpu Project in Finland and the Roseby Project in Queensland, Australia. The Kylylahti mine at Outokumpu is under development, Altona is targeting production of 8,000 tonnes of copper, 8,400 ounces of gold and 1,600 tonnes of zinc annually.
Roseby is one of the largest copper resources in Australia, where Altona is targeting copper production of up to 40,000 tonnes per annum.
Altona Mining (ASX: AOH) has intersected a very high grade 2 metres at 19% copper at shallow levels from drilling at the north of the Ivy Ann copper-gold deposit, which remains open to the north.
Ivy Ann is located within Altona's 100% owned Roseby Copper Project in the Mt Isa-Cloncurry mining district in Queensland, where the company continues to receive high grade copper intercepts.
Highlights from 12 drillholes at a 0.30% copper cut-off grade include:
- 13 metres at 3.42% copper and 0.45 grams per tonne (g/t) gold from 21 metres, including 2 metres at 19.4% copper and 2.69 g/t gold from 22 metres;
- 25 metres at 1.21% copper and 0.15 g/t gold from 184 metres, including 9 metres at 2.17% copper and 0.29 g/t gold from 185 metres; and
- 23 metres at 1.18% copper and 0.25 g/t gold from 41 metres, including 7 metres at 2.16% copper and 0.48 g/t gold from 42 metres.
Altona has now completed a 15 hole and 2,850 metres reverse circulation drilling program at Ivy Ann which is 30 kilometres south-east of the main Roseby project area. The majority of the holes intersected sulphide copper-gold mineralisation.
Results confirm continuations to north, west and down dip. Numerous zones of mineralisation up to 35 metres down hole were intersected often including high grade intervals above 1% copper. Drilling will also provide material for initial metallurgical test work.
The significance of the Ivy Ann deposit is that it has potential to provide supplementary feed to the proposed new mine and mill at Little Eva at a higher grade than the average grade of Little Eva.
Ivy Ann currently has an Inferred Resource of 4 million tonnes at 0.72% copper and 0.12g/t gold.
The company expects assay results in late November and work on an updated resource model will commence in 2012 following down hole and collar surveys.
Altona has a market capitalisation of A$140 million and had A$45 million cash on hand at the end of the September quarter.
finnland zu 95% fertig gestellt
UTOKUMPU PROJECT, FINLAND
Altona Mining Limited (Altona) recently announced that the Kylylahti mine at its Outokumpu Project in Finland had exposed first ore in the mine decline. It is planned that the ore will be transported 41km to the Luikonlahti mill.
Excellent progress has been made in refurbishing the Luikonlahti mill and we have now achieved the milestone of commencement of equipment commissioning.
The refurbishment programme is 95% complete, wet testing of flotation equipment has commenced and first low grade ore to be used to commission the crushing circuit has been delivered to the mill. Crushing circuit commissioning will take place next week.
All earthworks at the tailings dam and concentrate dam were completed prior to winter and these facilities have been certified by the authorities.
The plant has had all electrical reticulation replaced and a new process automation system installed.
All refurbishment activity is scheduled for completion in late December – early January with production commissioning on ore scheduled for late January in line with the timing previously advised.
Plant capacity is currently designed to be 550,000tpa and initial engineering studies indicate this capacity can be increased by 45% to 800,000tpa for expenditure of approximately A$7M.
link:
www.altonamining.com/static/uploads/..._Programme_Complete.pdf
Altona erhöht Resource auf Little Eva und auf dem Roseby-Projekt.
Link:
www.altonamining.com/static/uploads/...ittle_Eva_turns_100.pdf
|
Wertung | Antworten | Thema | Verfasser | letzter Verfasser | letzter Beitrag | |
12 | 964 | News zur Fusion | Buntspecht53 | Alexan | 25.04.21 03:03 | |
4 | 92 | Altona Mining - Neubewertung! | morseb | MeinMotto | 10.11.11 12:40 | |
1 | Blödsinn, Ariva wollte unbedingt ne Nummer | wouwww | wouwww | 17.10.11 13:10 | ||
Altona Mining LTD | lothisch | 22.08.10 12:33 | ||||
5 | Ganz frische sehr positive News: | DukeLondon83 | Ölmaus | 11.08.10 12:07 |