In Rumänien soll es im 4. Quartal 2011 losgehen. Caspian ist zu 20% und ADX Energy zu 60% beteiligt.
Hier ein Auszug von der ADX Seite:
Romania (Parta Block) Asset
OPERATOR
ADX ENERGY LTD
INTEREST
60% INTEREST IN THE PARTA CONCESSION
LOCATION
PANNONIAN BASIN - ONSHORE ROMANIA
--------------------------------------------------
Asset Highlights
A prospective exploration block in a proven and producing hydrocarbon province in Romania
1200km2 acreage with eleven identified leads
Mean unrisked prospective resources 303 bcf of gas and 47 MMbbl of oil
Located in a politically stable European community with favourable tax and royalty conditions
Easy access to local infrastructure and European markets
--------------------------------------------------
ADX was awarded the block in October 2010. Parta Block is located in one of Romania’s prolific hydrocarbon provinces.
Geotechnical studies conducted by ADX revealed two independent play fairways with good upside potential within the migration pathway of the MAKO source kitchen (the MAKO-trough contains the Algyo Field in Hungary with produced hydrocarbons of 2.6 tcf of gas and 225 MMbbl of oil). Several oil and gas fields have been discovered in the Parta Block since the late sixties with a total of 2P reserves of 12 MMbbl of oil and 50 bcf of gas. The block is considered underexplored based on seismically identified potential.
ADX has identified (based on available limited 2D seismic coverage) eleven leads in the 1221km2 area with a total mean unrisked resources of around 300 bcf of gas and 45 MMbbl of oil respectively. The evaluated mean EMV for the permit is US$210 million.
Committed techical work program
Seismic re-processing: 300km
Acquisition of 2D seismic: 100km
Acquisition of 3D seismic: 100km2
Drilling: 2 wells in to the Pannonian Fm
Planned Activities
ADX has signed the concession agreement with the national agency NAMR in Jan 2011 and is currently awaiting final governmental approvals. A local branch has been set up as well as an execution plan to define the operational procedures for the committed work program. Operations in Romania are expected to begin in Q4 2011. Reprocessing some of the existing 2D seismic and acquiring a regional 2D grid is intended to start by Q4 2011. This will define the way forward for the committed 3D seismic and the two exploration wells.