| Umsatz in Mio. | - |
| Operatives Ergebnis (EBIT) in Mio. | - |
| Jahresüberschuss in Mio. | - |
| Umsatz je Aktie | - |
| Gewinn je Aktie | - |
| Gewinnrendite | - |
| Umsatzrendite | - |
| Return on Investment | - |
| Marktkapitalisierung in Mio. | - |
| KGV (Kurs/Gewinn) | - |
| KBV (Kurs/Buchwert) | - |
| KUV (Kurs/Umsatz) | - |
| Eigenkapitalrendite | - |
| Eigenkapitalquote | - |
| Aktienanzahl | 30,76 Mio. |
| Streubesitz | 44,37% |
| Aktientyp | Stammaktie |
| +16,37% | BlackRock, Inc. |
| +14,34% | T. Rowe Price Associates, Inc. |
| +10,69% | The Vanguard Group, Inc. |
| +8,71% | Dimensional Fund Advisors LP |
| +5,52% | Boston Partners |
| +44,37% | Streubesitz |
2010 - das 4. Quartal und Gesamtergebnis.
investor.shareholder.com/insituform/releasedetail.cfm
www.mysmartrend.com/news-briefs/technical-analysis/insituform-technologies-trend-continues-insu-3
Und vom Charttechnischen einmal weg.
Die Zukunft scheint weitere kukrative Aufträge und Gewinne zu garantieren, zumindest in Punkto Nachholbedarf ist der Bereich Infrastruktur in den USA ein ungeheuer interessanter.
Gerade auch im Bereich Wasserversorgung drohen ganze Städte und Regionen in den USA bei ausbleibenden Investitionen auf das Niveau von Entwicklungs- und Schwellenländern zurück zu fallen.
29.07.2010 15:44
Insituform Division Awarded $6 Million (US) Contracts To Install the Tite Liner® System in South American Mine
Insituform Technologies, Inc. (Nasdaq Global Select Market: INSU) announced today that United Sistema de Tuberias Limitada, a Chilean subsidiary of its United Pipeline Systems division, has been awarded two contracts valued at approximately $6 million (US) to install its Tite Liner® System in pipelines for Minera El Abra in Calama, Chile.
The Tite Liner® System is a high-density polyethylene liner designed to resist internal abrasion and corrosion in pipelines.
The liner is being used to internally protect a new 42-inch diameter pipeline from highly corrosive sulfuric acid raffinate as part of the $600 million "Sulfolix" expansion project. The pipeline will be nearly 25,000 feet long, and United's on-site installation will take place in extremely challenging high desert conditions. The El Abra copper mine is located at approximately 13,000 feet above sea level where cold temperatures and high winds are prevalent. Work on the project is expected to be completed by the end of 2010.
United Pipeline Systems began providing global pipeline protection in 1985, and has installed over 100,000 feet of Tite Liner® at the El Abra mine near Calama since 1995.
Dorwin Hawn, Insituform's Senior Vice President, Energy and Mining, said, "United Pipeline Systems has successfully installed pipeline in challenging environments throughout South America for nearly 20 years. Our General Manager, Sr. Roberto Ogarrio, and his team are prepared to meet the challenges of installing Tite Liner® for the Minera El Abra project as part of Insituform's continuing global pipeline protection efforts."
About United Pipeline Systems
United Pipeline Systems is a global leader in providing high-density polyethylene (HDPE) lining systems for internal pipeline protection. United has constructed and internally lined more than 13,000 kilometers (8,000 miles) of pipelines on six continents since 1985. United developed the Tite Liner® System, which protects steel pipelines from a variety of chemicals and abrasives through a broad range of temperatures and pressures. More information about United can be found at www.unitedpipeline.com.