Highlights:
TDG25-001 intersected 100.0 m grading 2.24 grams per tonne ("g/t") gold ("Au") and 0.38 % copper ("Cu") from 308.0 m depth, contained within a broader 240.6 m zone grading 1.23 g/t Au and 0.23 % Cu (Table 1 for drill results summary; Figures 1a-c for Core Images).
Four additional diamond drillholes completed (Figures 2-4): TDG25-002 to 585.0 m downhole depth, TDG25-003 to 671.0 m downhole depth, TDG 25-004 to 625.0 m downhole depth, TDG25-005 to 568.0 m all with assays pending.
The first drillhole at southern drill Pad
#3, as well as the first step out drillhole at drill Pad
#4 to the west of the boundary, are about to commence (based on the pad pattern set out in TDG news release August 06, 2025).
TDG is well-funded with over $38 million cash in treasury including ~$30 million of flow-through dollars - sufficient to complete the currently proposed 2025 and 2026 programs.
ceo.ca/@accesswire/...ource=chatgpt.com&mc_cid=e425235658