PRODIGY GOLD

Aktie
WKN:  A1H5YZ ISIN:  CA74283A1003
Keine aktuellen Kursdaten verfügbar
Depot/Watchlist
Dieses Wertpapier ist nicht mehr handelbar.
Marktkapitalisierung *
-
Streubesitz
-
KGV
-
Index-Zuordnung
-
PRODIGY GOLD Chart
Werbung

Mehr Nachrichten kostenlos abonnieren

E-Mail-Adresse
Benachrichtigungen von ARIVA.DE
(Mit der Bestellung akzeptierst du die Datenschutzhinweise)

Termine

Keine Termine bekannt.

Prognose & Kursziel

Keine aktuellen Prognosen oder Kursziele bekannt.

Stammdaten

Aktienanzahl 293,25 Mio.
Aktientyp Stammaktie

Community-Beiträge zu PRODIGY GOLD

  • Community-Beiträge
  • Aktuellste Threads
Avatar des Verfassers
DasMünz
NEWS
http://tmx.quotemedia.com/article.php?newsid=44551980&qm_symbol=PDG
Avatar des Verfassers
DasMünz
IRR of 49%
Intressanter Übernahmekandidat Prodigy Receives Positive PEA For Magino: NPV of $351M and IRR of 49% 4/4/2011 11:27:55 AM - Market Wire VANCOUVER, BRITISH COLUMBIA, Apr 04, 2011 (MARKETWIRE via COMTEX News Network) -- Prodigy Gold Incorporated (TSX VENTURE: PDG) is pleased to announce the results from a NI 43-101 compliant Preliminary Economic Assessment (PEA) of its 100% owned Magino mine gold project in northern Ontario. The PEA, completed by CWA Engineers Inc., in a consortium including Snowden Mining Industry Consultants Inc. (Snowden) and Knight Piesold Canada, has established strong economics for the proposed open pit gold mining project at Magino. (All figures are in Canadian dollars except where noted). Highlights of the PEA (base case using US$1,000/oz gold): -- Pre-tax Net Present Value (NPV) of $351 million at a 5% discount rate generating an Internal Rate of Return (IRR) of 49%; payback period is 1.8 years -- At a US$1,300/oz gold price, the project generates a pre-tax NPV of $691 million and an IRR of 80% -- Pre-tax cash flow from operations over the proposed Life of Mine (LOM) is estimated to be $796 million, net cash is projected to be $520 million LOM -- Start-up capital costs are estimated to be $242 million with an additional $34 million in sustaining capital -- Average annual gold production is estimated to be 166,500 ounces per year over a nine year operating life producing 1.50 million ounces of gold, recovery is estimated to be 95% -- Average LOM cash operating costs (exclusive of sustaining capital) are estimated to be US$496 (Cdn$521) per ounce -- During the first two years of proposed mine operations, the average grade processed will be 1.60 gpt gold -- Total minable resources of 41.8 million tonnes grading 1.18 gpt gold with a strip ratio of 2.8:1 -- Ongoing in-fill drilling to date is targeted at increasing the gold resource by converting internal waste to resources; the PEA to be updated upon completion of the drilling Brian Maher, President and CEO of Prodigy Gold stated: "The completion of the Magino mine PEA by the engineering consortium is a major milestone for Prodigy Gold, demonstrating the robust economics of our proposed open pit gold mine at Magino. With a projected mine life of nine years, cash costs of US$496 (Cdn$521) per ounce and rapid payback of capital, Magino is developing into one of the leading undeveloped gold projects in eastern Canada. The on-going in-fill drilling program, which is targeting gold mineralization within the proposed open pit, may enhance project economics as we convert internal waste into resources, simultaneously increasing contained ounces and lowering costs. We view this PEA as a first pass analysis and look forward to fine-tuning the operating and milling plan with a focus on lowering costs and increasing the resource base prior to completing a full feasibility study." Project Assumptions and Parameters: Assumptions: Base gold price (US$/oz) 1,000 Exchange Rate (Cdn$/US$) 1.05 Milling rate (tpd) 15,000 --No royalty --No sunk costs --Total capital costs include initial and sustaining capital --100% equity financing --Costs are estimated in 2011 first quarter dollars Mine and Mill Parameters: Total resource milled (million tonnes) 41.82 Waste moved (million tonnes) 115.55 LOM strip ratio 2.76:1 Average gold grade (gpt) 1.18 Total contained gold (million oz) 1.57 Estimated gold recovery (%) 95 Total recovered gold (million oz) 1.50 Project life (years) 9 Average annual production (oz) 166,500 Costs and Capital Requirements: Mining costs ($/tonne) 2.25 Transportation costs ($/tonne) 0.50 Milling costs ($/tonne) 9.17 G and A ($/tonne) 1.13 Pre-production capital ($ million) 242 Sustaining capital ($ million) 34 Average cash cost (US$/oz) 496 (Cdn$521) Financial Analysis: Average annual pre-tax cash flow ($ million) 57.8 NPV 5% discount rate pre-tax ($ million) 351 NPV 5% discount rate post-tax ($ million) 259 IRR pre-tax (%) 49 IRR post-tax (%) 41 Pre-tax payback period (years) 1.8 Magino Mine Resources The Magino mine resources used in the PEA were previously reported in a Prodigy Gold press release dated February 28, 2011. The resource estimate, completed by Snowden, contained Indicated gold resources of 1,924,200 ounces grading 1.16 gpt gold (51.6 million tonnes) and 587,100 ounces of Inferred gold resources grading 1.04 gpt gold (17.5 million tonnes) using a 0.35 gpt cut off grade. The complete resource estimate table is included below: ----------------------------------------------------------------------- ---- Indicated Cut off Grade (gpt Gold) Tonnes (gpt Gold) Grams Gold Ounces Gold --------------------------------------------------------------------------- 2.00 6,991,000 2.86 19,969,200 642,000 1.50 11,635,000 2.41 28,036,500 901,400 1.00 20,192,000 1.90 38,336,900 1,232,600 0.75 31,532,000 1.53 48,105,600 1,546,600 0.50 46,939,000 1.23 57,785,400 1,857,800 0.35 51,633,000 1.16 59,850,000 1,924,200 --------------------------------------------------------------------------- --------------------------------------------------------------------------- Inferred Cut off Grade (gpt Gold) Tonnes (gpt gold) Grams Gold Ounces Gold --------------------------------------------------------------------------- 2.00 1,807,000 2.79 5,043,900 162,200 1.50 2,711,000 2.43 6,599,300 212,200 1.00 5,854,000 1.77 10,343,100 332,500 0.75 10,113,000 1.39 14,017,800 450,700 0.50 15,579,000 1.12 17,422,900 560,200 0.35 17,494,000 1.04 18,260,400 587,100 --------------------------------------------------------------------------- Potentially open-pit minable resources were calculated by Snowden using Snowden's resource model (as reported in a press release dated February 28, 2011). This resource model as well as the cost parameters mentioned above, and an average pit wall slope assumption of 45 degrees were used to develop an optimum final pit shell using Whittle 4D. After determining the optimal pit shell Snowden then used lower revenue factor shells to select appropriate push backs to assist in scheduling the operation. Snowden then developed a life of project schedule for the resource which utilizes an extensive low grade stockpile to increase the average mill feed grade, maximizing value in the early years of the project's life. The schedule developed supports an average mill feed rate of 15,000 tonnes per day, for about nine years. To support this mill feed, total material movement from the open pit peaks at about 62,500 tonnes per day in year three with a typical material movement requirement of about 55,000 tonnes per day of combined waste and process feed. Using the final pit shell from Whittle, Snowden designed a conceptual final pit design as well as associated waste dumps, low grade stockpile, and ramps. Mining is assumed to be undertaken by a contractor. The financial analysis includes a mobilization allowance of $5 million for the contractor. Mining and Production The pit design, optimization and production schedule prepared by Snowden resulted in a potential production schedule containing 41.82 million tonnes grading 1.18 gpt gold. Total gold recovered over a nine year project life is 1.50 million ounces, averaging 166,500 ounces per year. The LOM average strip ratio is estimated to be less than 2.8 to 1. A summary of the annual mine production is outlined below. To view summary of the annual mine production, please visit the following link: http://media3.marketwire.com/docs/PGOLD44.pdf Processing Facility The PEA contemplates using a conventional carbon-in-leach (CIL) processing facility operating at 15,000 tpd with 95% availability. The crushing consists of a three stage crushing plant and a fine ore stockpile. The fine ore will be reclaimed to feed two ball mills in parallel. Each ball mill will be in a closed circuit with cyclones. The cyclone overflow from each ball mill will be fed to a train of leach tanks with sodium cyanide and carbon (carbon-in-leach process) for 48 hours to extract 95% of the contained gold. The loaded carbon will be washed and stripped in a hot caustic solution at an elevated temperature and pressure. The pregnant solution exiting from the stripping circuit will be cooled and pumped to a set of electrowinning cells where the gold will be plated out on steel wool. The gold laden steel wool will be smelted on site to produce dore. The stripped carbon will be reactivated and returned to the CIL circuit. The residual cyanide in the tailings from the leach will be destroyed using sulphur dioxide, copper sulphate and lime before the tailings are pumped to the storage area. The supernatant from the tailings will be reclaimed and re-used in the process plant. Operating Costs Operating cash costs, excluding sustaining capital, over LOM are projected to average US$496/oz (Cdn$521). Costs are summarized below:
Avatar des Verfassers
Stanglwirt
News von Kodiak....
vom 7.11.07 - hier der Link: http://www.kodiakexp.com/_resources/2007-11-27_nr.pdf und vom 27.11.07: Kodiak Closes $53.9 Million Bought Deal Financing Vancouver, British Columbia, November 27th, 2007 – Kodiak Exploration Limited (TSXV: KXL, Frankfurt:KX3) is pleased to announce that it has closed its bought deal financing announced November 6, 2007, consisting of 2,499,984 flow-through shares issued at the price of $4.80 each and 11,032,658 non-flow-through shares issued at the price of $3.80 each, raising an aggregate of $53,924,023. No warrants were issued in connection with the financing, National Bank Financial Inc. and Cormark Securities Inc. co-led the syndicate of underwriters for the financing, which included CIBC World Markets, RBC Capital Markets, Dundee Securities Corporation, Paradigm Capital Corporation and Raymond James Ltd. Insiders of Kodiak and relatives, close friends and associates of insiders of Kodiak purchased approximately $5,000,000 of the private placement. As announced on November 7, 2007, the financing was oversubscribed and the underwriters’ original overallotment option was increased to accommodate requests for increased participation. The Underwriters have been paid a cash underwriting fee equal to 6% of the funds raised. All shares issued pursuant to the financing will be subject to a four month hold period expiring March 27, 2008. Information on Kodiak and its projects may be reviewed on its website at www.kodiakexp.com.
Avatar des Verfassers
oligator
hm, schwer zu sagen..
@ Stanglwirt, ist natürlich ärgerlich wenn man später so einer Performance hinterher schauen muß und dabei den Wert auf der Watch Liste hat, ich denke Sinvoll wäre es erst mal eine zwische Korektur abzuwarten, was mir aber sehr positiv auffält die extrem Hochen Umsätze in Heimatsland (deuten auf ein Großes Interesse hin) ;-) hier noch mal in Deutsch die News: 31.10.2007 - 07:10 Uhr Kodiak gibt beträchtliche Erweiterung des Golden Mile Streichens bekannt / Identifiziert mehrere parallele Strukturen VANCOUVER, BRITISH COLUMBIA--(Marketwire - October 31, 2007) - Kodiak Exploration Limited (TSX VENTURE: KXL) gibt mit großer Freude bekannt, dass die Auswertung neuer geophysikalischer Daten auf signifikante Ausdehnungen des Ausmaßes des bekannten Streichens an goldführenden Strukturen hinweist, und hat mehrere neue parallele Strukturen identifiziert, die an die Golden Mile und Yellow Brick Road Adern anschließen. Diese Strukturen haben eine Gesamtlänge von über 3 km und erweitern den potenziellen Umfang und die Geometrie des Hercules-Goldsystems in beträchtlichem Umfang. Es wurde Personal vor Ort mobilisiert, um diese Zielstrukturen zu erkunden. Werbung Die geophysikalischen Daten zeigen, dass die Golden Mile und Yellow Brick Road Strukturen mindestens 2 Kilometer über die bisher bekannte Ausdehnung hinausreichen. Das Ausmaß der Golden Mile Struktur wurde bereits auf eine Ausdehnung von mindestens vier Kilometern bestätigt, wodurch sich die Größe der Golden Mile Ader potenziell verdoppelt. Damit besteht für diese goldführende Struktur ein enormes Potenzial. Vier neue bedeutende parallele Strukturen wurden ebenfalls identifiziert, wodurch sich die Gesamtausdehnung des Streichens dieses Systems auf mindestens 20 km erstreckt. Darüber hinaus wurden mehrere goldführende Leitergänge durch Oberflächenexploration entdeckt, die ebenfalls durch geophysikalische Daten zwischen den Golden Mile und Yellow Brick Road Zonen angedeutet wurden. Die geophysikalischen Daten weisen zudem auf das gleiche Muster zwischen anderen bedeutenden Strukturen auf der Liegenschaft hin, wodurch mehrere parallele Strukturen, für die bereits eine Gesamtlänge des Streichens von mehr als 20 km identifiziert wurde, potenziell signifikant verlängert werden. Um den Rasterabstand auszufüllen und die Kontinuität der Goldmineralisierung weiter zu demonstrieren, wurden in Abständen von 10 Metern mehrere neue Kanalproben von der Golden Mile Ader gesammelt. Alle Proben enthalten Sulfide und sichtbare Goldspuren und wurden für eine beschleunigte Goldanalyse eingereicht. Analyseergebnisse von bisher berichteten Kanalschnitten am äußersten nördlichen Ende der Golden Mile haben bis zu 60 gpt Gold gezeigt und bestätigen damit die Kontinuität der Goldmineralisierung über die 2 km Länge der Golden Mile Ader, die bisher an der Oberfläche freigelegt wurde und nun gezeigt hat, dass sie potenziell für bis zu zwei zusätzliche Kilometer offen bleibt. Weitere Bohrergebnisse, einschließlich der Ergebnisse aus sieben, bisher noch nicht gemeldeten Bohrungen, werden kurz nach Abschluss der Metallprobenprüfung erwartet. Brian Maher, VP Exploration von Kodiak, bemerkte: "Auf dem Hercules-Goldsystem wurden in einem sehr kurzen Zeitraum über fünf Kilometer lange, bedeutende goldführende Strukturen identifiziert. Geophysikalische Daten weisen nun auf mehrere parallele Strukturen hin, wodurch sich das Goldpotenzial des Hercules-Projektes beträchtlich erhöht. Das Potenzial der Liegenschaft nimmt täglich zu und repräsentiert nur einen kleinen Teil der über 1.000 Quadratkilometer großen Landfläche im Goldgürtel von Beardmore-Geraldton, an deren Erwerb Kodiak äußerst hart gearbeitet hat. Das Kodiak Team freut sich mit großer Zuversicht auf die bevorstehende Bekanntgabe der Probenergebnisse. Wir haben bereits die Erweiterung des Bohrprogramms für November auf zwei Bohrgeräte angeordnet und werden das Programm anschließend auf drei Geräte hochfahren. Wir planen außerdem die Fertigstellung eines neuen 60.000 Meter Bohrprogramms, um das wirtschaftliche Potenzial dieses signifikanten neuen Goldsystems zu demonstrieren." "Kodiak wird die bewährte Methode der geologischen Sammlung, Auswertung, gefolgt von systematischer aggressiver Exploration auf seiner gesamten, über 1.000 Quadratkilometer großen Liegenschaft im Greenstone-Gürtel von Beardmore-Geraldton anwenden." Die in dieser Pressemeldung enthaltenen Informationen wurden von Robert B. Hawkins, Kodiaks leitendem Geologen, überprüft und gebilligt, der gemäß der Definition des National Instrument 43-101 eine qualifizierte Person ist. Kodiak ist ein Mineralexplorationsunternehmen mit bedeutenden Projekten in drei unterschiedlichen Rohstoffsektoren der Bergbaubranche. Durch regionale, generative Basisexploration und neue geologische Modelle hat das Unternehmen ein Portfolio von 100%ig kontrollierten Projekten aufgebaut, die sich auf Gold, unedle Metalle (Nickel/Kupfer) und Uran in drei verschiedenen Regionen von Kanada konzentrieren. Karten, Fotografien, detaillierte geologische Berichte und zusätzliche Informationen können auf unserer Website unter www.kodiakexp.com eingesehen werden. Eine diese Pressemeldung begleitende Karte ist unter folgendem Link zu finden: http://www.ccnmatthews.com/docs/Kodiak%20Exploration.pdf Im Namen des Vorstands KODIAK EXPLORATION LIMITED William S. Chornobay, Director, President Dieses Dokument enthält bestimmte zukunftsgerichtete Aussagen, die bekannte und unbekannte Risiken, Verzögerungen und Unsicherheiten beinhalten, die außerhalb der Kontrolle des Unternehmens liegen und dazu führen können, dass die tatsächlich eintretenden Ergebnisse, Leistungen oder Erfolge des Unternehmens wesentlich von den in diesen zukunftsgerichteten Aussagen enthaltenen Ergebnissen, Leistungen oder Erwartungen abweichen können. Diese Pressemitteilung wurde von der Firmenleitung erstellt. Die TSX Venture Exchange hat diese Pressemeldung nicht überprüft und übernimmt keine Verantwortung hinsichtlich ihrer Angemessenheit oder Richtigkeit. Ansprechpartner: Kodiak Exploration Limited William S. Chornobay Director, President +1-(604) 688-9006 +1-(604) 688-9029 (FAX) E-Mail: info@kodiakexp.com Website: www.kodiakexp.com Finanztreff.de
Jetzt anmelden und diskutieren Registrieren Login
Zum Thread wechseln

Häufig gestellte Fragen zur PRODIGY GOLD Aktie und zum PRODIGY GOLD Kurs

Nein, PRODIGY GOLD zahlt keine Dividenden.