von der anderen Seite betrachtet:
...
Hurray for the Little Guys!
Update on the Ridgecrest Solar Power Plant Project
I could also have titled this report “Creeping but Not Yet Dead” as the approval process for this ill-conceived project has slowed considerably since last spring. At that time, we thought recommendations would be made by both the BLM and the California Energy Commission (CEC) in time for final rulings by the end of this calendar year with construction to begin in 2011, if the project was approved.
However, once the CEC Staff Assessment/Draft Environmental Impact Report (SA/DEIR) was released in late March it became apparent that the CEC approval schedule would likely change (the BLM timetable was & remains different). This was due to the CEC staff’s findings that the biological resources of the proposed site could not be mitigated, nor could the visual impacts. This is the first time that CEC staff has made such an unequivocal finding for preserving a site and its intact, fully functioning ecosystem.
Their decision was based on the high number of Desert Tortoises of all ages and the functioning genetic corridor for Mojave Ground Squirrels. Of course neither of these species would thrive without high quality habitat. The Creosote Ring’s plant survey on April 17 showed just that. 23 participants helped to document the annual and perennial plant species found on the proposed RSPP site. 72 species from 25 plant families were observed, indicating a complex well-functioning ecosystem. Especially note-worthy were the existence of Winter Fat (Krascheninnikovia lanata) and Spiny Hop-Sage (Grayia spinosa), indicators of Mojave Ground Squirrel habitat and, perhaps more importantly, the occurrence of many preferred food plants for both juvenile and adult Desert Tortoises.
At the opening of the May 3-4 public workshops we were most pleased to hear Dick Anderson, CEC biologist, reference our plant list. Jane McEwen's terrific research documenting the preferred Desert Tortoise food plant observed bolstered CEC's position that this is a unique site. During the workshops Dave Hacker (CA Dept. Fish and Game) very strongly supported the need to preserve biological connectivity for the Mojave Ground Squirrel and Desert Tortoise as well. It was clear that the mitigation measures proposed by Solar Millennium do not meet the requirements of DFG & USFWS.
There are some other major issues with RSPP besides the biological and visual ones. The plan is to use trucked-in propane to keep the transfer fluid thin enough to work. We think that they have greatly underestimated how much propane they will need, as our fall-winter-spring air temps are lower than they have allowed for. This will increase the cost of generation, the carbon foot-print and traffic. Ridgecrest sits downwind of the site giving concerns about Valley Fever with the grading of such a large area (over 2000 acres). They claim mitigation will control 75% of the dust but that leaves 25% than can infect people. Valley Fever is not a fun disease.
Over the next weeks and months many excellent comment letters from both environmental organizations and private citizens were submitted to both the CEC & BLM (tinyurl.com/2dmkv2c). Most have supported the position that this project would irreparably alter a biological treasure and should not be built. I wrote a detailed letter for CNPS. The Naval Air Weapons Station, China Lake also wrote two letters expressing their considerable concerns.
Then on June 30, Solar Millennium requested a suspension of their application. They proposed conducting a 2-year survey to study connectivity issues for local populations of Mojave Ground Squirrels. This was approved by the CEC but the BLM approval process continues to move forward on its own timetable. After the July 8 mandatory status conference Solar Millennium realized that this request needed to be modified as it was perceived as “a complete halt to all activities.” Therefore on Aug. 8 Solar Millennium asked for the suspension to be changed to “a modification of … milestones.” We will have to wait to see what this really means.
However, since Solar Millennium has two other California sites (Blythe and Palen) moving through the approval process, they may be hoping that approval of one or both of them will give them additional monetary resources to put into Ridgecrest down the road. In the meantime, we should not be complacent, thinking that the little guys (Mojave Ground Squirrels) will do the heavy lifting for us. We must continue to monitor the CEC website for developments and maintain contacts with the excellent interveners. I am particularly grateful to two of them: Dan Burnett (Creosote Ring member and Kerncrest Audubon intervener) and Ileene Anderson (personal friend, Center for Biological Diversity biologist/intervener, and desert expert extraordinaire). My personal crash course in conservation work would have been far less successful without their generosity and dedication.
— Kathy LaShure