der nächsten Schritte....demnach sollten im Herbst einige News auf uns zukommen....ich erwarte die ersten News zu den Bohrungen von Mavis ab Mitte Oktober.....
Second half of 2016
Lithium Projects: Rare-metal geochemistry coupled with ge
ological,
structural and detailed geophysical data will be the key to n
ew-target generation.
PIONEER DOME Lithium (Significant funding available)
•
5,000m RC drilling At PEG001,PEG002 and PEG008: Drill start
date 30 September.
•
Soil geochemistry progressing – 50% complete. Priority Are
a PEG003-007
MAVIS / RALEIGH Lithium ($1,000,000 budget for 12 months)
•
Magnetic/Radiometric surveys:
•
Mavis ground work completed
•
Raleigh drone coverage in September:
•
Rock geochemistry: These work programs are progressing
•
Drilling: Scheduled for the September-December quarter
ACRA Gold
•
Next step: Air Core Drilling, RC Drilling
BLAIR DOME Nickel
•
Diamond Drilling December quarter
__________________________________________________
www.asx.com.au/asxpdf/20160824/pdf/439l4kx8gzcm16.pdf