DDD024 and 12m @ 8.58 g/t Au from 511m to 523m and 54m @ 6.18 g/t Au from 557 to 611m
in
DDD030. These diamond holes were completed to test the strike and up plunge position of the
mineralisation intersected in holes
DDD011 to
DDD013. Results are awaited from the final 5
holes in the programme,
DDD031 to
DDD035 inclusive.
An infill, 40m x 40m programme is ongoing on the shallower, potentially open pittable resources.
Significant results received and not previously reported are summarised in Table 1.
PAKAKA
All results have now been received from the infill programme completed on the Pakaka Deposit.
Significant recent results include 34m @ 2.45 g/t Au from 116m to 150m in PDD084, 20m @
3.72 g/t Au from 125m to 145m in PDD085 and 14m @ 4.01 g/t Au from 207m to 221m in
PDD087.
The results confirm the continuity of the mineralisation. An upgrade of the previously reported
resource of 8,233,000 tonnes grading 2.7 g/t Au for 701,000 ounces in the indicated category and
11,463,000 tonnes grading 2.2 g/t Au for 814,000 ounces in the inferred category estimated by
Cube Consulting in early August 2005 is currently being completed.
Significant results received and not previously reported are summarised in Table 2.
RESOURCE UPGRADE
In August 2005 the Company announced the completion of revised resource estimates at the
Moto Gold project by independent geological consultants Cube Consulting Pty Limited (" Cube
Consulting" ). Cube Consulting estimated indicated resources of 8.23 million tonnes at 2.6 g/t for
0.7 million ounces of gold and inferred resources of 89.23 million tonnes at 2.6 g/t Au for 7.3
million ounces of gold.
The infill drilling programmes at Pakaka, Sessenge, Kombokolo and Mengu Hill, designed to
upgrade the resources from the inferred to the indicated category, are now complete. A resource
upgrade is planned for November. Resource modelling is also underway on these deposits with
initial results expected during November.
3
For further information in respect of the Company’s activities, please contact:
Klaus Eckhof Patrick Flint Nick Tintor
President and CEO Chief Financial Officer Vice President - Canada
Tel: (61 8) 9240 1377 Tel: (61 2) 9212 7999 Tel: (416) 777 0001
Email: eckhofk@crcpl.com.au Email: flintp@crcpl.com.au Email: nicktintor@yahoo.ca
Company website:
www.motogoldmines.comAdditional Notes:
Scientific or technical information in this news release has been prepared under the supervision of Greg
Smith, Exploration Manager of the Company and a qualified person under National Instrument 43-101 and
a member of the Australasian Institute of Mining and Metallurgy (AusIMM). Greg Smith has sufficient
experience which is relevant to the style of mineralisation under consideration and to the activity which he
is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the “Australasian Code
for Reporting of Exploration Results, Mineral Resources and Ore Reserves” (the JORC Code).
The Information in this report that relates to Mineral Resources is based on a resource estimate compiled
by Ted Coupland who is a member of the Australasian Institute of Mining and Metallurgy (AusIMM),
Mineral Industry Consultants Association (MICA) and is a Chartered Professional (Geology), and a
qualified person under National Instrument 43-101. Ted Coupland is a director of Cube Consulting Pty
Ltd. Ted Coupland has sufficient experience which is relevant to gold mineralisation and resource
estimation to qualify as a competent Person as defined in the December 2004 Edition of the “Australasian
Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves” (the JORC Code). Ted
Coupland consents to the inclusion in this report of the Information, in the form and context in which it
appears.
Caution Regarding Forward Looking Statements: Statements regarding the Company’s plans with respect
to developing the Moto Gold Project are forward-looking. There can be no assurance that any
mineralisation will be proven to be economic, that anticipated metallurgical recoveries will be achieved,
that future evaluation work will confirm the viability of deposits identified with the project or that future
required regulatory approvals will be obtained.
4
Table 1 – Significant intercepts Karagba
Hole_id UTM_North UTM_East UTM_RL Azimuth Dip Depth From To Interval Au g/t
DDD023 787538 345000 852 135 -65 449.55 220 222 2 2.31
DDD024 787538 345000 852 135 -85 509.85 331 351 20 8.51
379 383 4 1.75
397 401 4 1.50
415 419 4 0.86
469 481 12 1.75
DDD025 787505 345032 852 0 -90 494.65 274 280 6 4.76
DDD030 787560 345090 855 0 -90 666.05 433 449 16 3.23
455 485 30 1.82
491 501 10 3.94
511 523 12 8.58
527 537 10 5.88
557 611 54 6.18
617 621 4 3.44
Table 2 – Significant intercepts Pakaka
Hole_id UTM_North UTM_East UTM_RL Aziumth Dip Depth From To Interval Au g/t
PDD077 348763 788621 861 0 -90 182 95 137 42 1.06
PDD080 348801 788639 867 0 -90 200 112 136 24 1.79
140 158 18 1.08
194 198 4 1.44
PDD083 348838 788577 859 0 -90 182 96 132 36 1.18
158 160 2 2.76
PDD084 348838 788619 864 0 -90 200 116 150 34 2.45
PDD085 348842 788660 870 0 -90 220 125 145 20 3.72
151 173 22 0.82
201 205 4 0.88
PDD086 348839 788696 873 0 -90 235.05 145 177 32 1.67
183 189 6 2.23
PDD087 348843 788741 876 0 -90 258.66 171 193 22 1.06
207 221 14 4.01
227 235 8 1.11
PDD088 348878 788640 866 0 -90 215 129 137 8 1.07
147 149 2 2.84
PDD089 348881
788718 871 0 -90 239.35 157 199 42 1.13
PDD090 348915 788662 865 0 -90 311 148 184 36 1.26
266 284 18 1.37
PDD091 348920 788698 867 0 -90 332.05 160 200 40 1.78
258 268 10 1.99
286 296 10 2.58
PDD092 348916
788742 869 0 -90 263 169 209 40 2.08
PDD093 348921 788782 870 0 -90 269 184 206 22 1.05
210 214 4 0.79
218 224 6 1.10
Note* The intersected true width ranges from 90% to 100% of the intercept.
Genalysis Laboratory Services located in Perth, Western Australia completed all assays on drill core from
Karagba and Pakaka. Fire assay using a 50gm charge was used for all assays.
Die für mich wichtigste Aussage habe ich mal fett und zwischen Smileys markiert. Das heißt doch, dass die Ressourcen auf "indicated" raufgestuft wurden.
Und das neue Upgrade kommt im November 
Wenn ich mir noch den Chart ansehe.... Das passt.... Mehr muss man nicht sagen.....
Gruß an alle Mitinvestierten. Die Zukunft sieht "goldig" aus 


