Ist es dem interessierten Leser auch nicht ganz neu, das jedenfalls ist die Einschätzung des Partners Gulfsands, die dort in diversen Projekten tätig sind zu Sidi Dhaher:
"London, 11th July, 2011: Gulfsands Petroleum plc ("Gulfsands", the "Group" or the "Company" - AIM: GPX), the oil and gas production, exploration and development company with activities in Syria, Iraq, Tunisia, Italy and the U.S.A., is pleased to provide this update on operations in....
ABOUT GULFSANDS:
Gulfsands is listed on the AIM market of the London Stock Exchange.
...
Tunisia
Gulfsands is acquiring working interest positions in two exploration permits in Tunisia (Chorbane and Kerkouane Permits) and one exploration permit in Southern Italy (G.R15.PU) from ADX Energy Ltd the operator of all three permits. The Company's interest in these permits remains subject to the completion of the Company's farm obligations and various approvals from the governments of Tunisia and Italy.
Kerkouane Permit -- Offshore Tunisia
G.R15.PU Permit (Pantelleria Permit) -- Offshore Italy
G.R15.PU, is located offshore the island of Pantelleria southwest of Sicily in Italian waters and the Kerkouane Permit is located offshore northeast Tunisia. The two permits are contiguous and comprise a total area of approximately 4,500 km2.
The operator has identified multiple leads and targets on these permits. Drilling operations were recently completed at the Lambouka-1 well where gas was encountered in the Abiod Formation. However, as a result of down-hole problems, no fluid samples or gas flow were established. The well was suspended with the intention of re-entering at a later date and drilling and testing the reservoir in a sidetrack hole up-dip of the existing discovery.
Gulfsands has completed its earn commitments with respect to the Kerkouane and Pantelleria Permits with the drilling of the Lambouka-1 well. Gulfsands has earned a 30% working interest in both permits by paying approximately 35% of the cost the Lambouka-1 well and reimbursing the operator for a portion of various pre-drill costs that include a recently completed 3D seismic programme.
Chorbane Permit -- Onshore Tunisia
The Chorbane permit is located in central Tunisia and covers an area of 2,428 km2. The permit is surrounded by several producing oil fields and extensive oil & gas infrastructure. Gulfsands' forward work commitment for the Chorbane permit includes the drilling of one exploration well in the first quarter of 2011 for which Gulfsands will pay 80% of the first $5 million in drilling costs, and 40% of the drilling costs in excess of $5 million, so as to earn a 40% interest in the permit.
A number of prospects and leads have been indentified within the permit, the most prospective being a large tilted horst block ("Sidi Daher") where the operator has identified multiple potential targets estimated to hold recoverable mean un-risked prospective resources of 175 billion cubic feet of gas ("bcfg") and 44 million barrels of oil from Tertiary and Cretaceous aged reservoirs..."
Quelle: www.gulfsands.com/s/NewsReleases.asp?ReportID=465873