Eine Frau beim Fernsehen. (Symbolbild)
Dienstag, 18.09.2018 13:05 von | Aufrufe: 98

Tinka Reports Additional Step-Out & Infill Drill Holes at Ayawilca and Highlights Upper Manto Discovery

Eine Frau beim Fernsehen. (Symbolbild) © franckreporter / E+ / Getty Images http://www.gettyimages.de

PR Newswire

VANCOUVER, Sept. 18, 2018 /PRNewswire/ - Tinka Resources Limited ("Tinka" or the "Company") (TSXV & BVL: TK) (OTCPK: TKRFF) is pleased to announce results for twelve drill holes from the Company's ongoing resource expansion and confirmation drill program at the 100% owned Ayawilca project, central Peru.

Key Highlights:

  • Five resource step-out drill holes at West, South, Central and Camp areas have all intersected significant zinc mineralization hosted mostly by Pucara limestone, the main host of the zinc sulphide mineralization;
  • Hole A18-148 intersected high-grade zinc (5.5 metres grading 10% zinc) 100 metres further east of the current resource at the Central area, with extensions to be tested later in 2018;
  • Hole A18-146 intersected high-grade zinc and silver mineralization (1.7 metres grading 27% zinc & 1520 g/t silver from 57 metres depth) in an 'Upper Manto' hosted by sandstone at the South area, above and lateral to the known limestone hosted resource. The Upper Manto has been observed in other drill holes and is considered significant due to its shallow depth and proximity to existing resources;
  • Hole A18-150 (9.6 metres grading 6% zinc) and adjacent hole A18-154 have extended known mineralization at the West area 120 metres to the northeast – mineralization remains open;
  • Seven resource infill holes are also reported from the West and South areas, drilled to improve the Company's geological model and to target additional zinc mineralization at depth;
  • Tinka now plans to update the Ayawilca resource estimate in Q4 2018, while step-out drilling continues.

Graham Carman, Tinka's President and CEO, stated: "The step-out drill hole results reported in this release are very positive, and show that the footprint of zinc mineralization at Ayawilca is getting larger. So far in 2018 we have discovered several new areas of significant zinc mineralization, including:

  • thick and high-grade intersections up to 150 metres to the northwest of the West Ayawilca resource (e.g., hole A18-118);
  • the Camp area, which connects West mineralization with the Central area (e.g., holes A18-130 & 134);
  • repetitions of mineralized limestone beneath lenses of phyllite at West Ayawilca which can host exceptional zinc grades (e.g., 10.4 metres grading 44% zinc, hole A18-129);
  • shallow zinc sulphide mineralization hosted by the overlying sandstone within a laterally extensive Upper Manto; and
  • extensions to the mineralization east of the Central and West areas (e.g., holes A18-148 & A18-150);

"Zinc mineralization still remains open along strike and down dip in several directions, while other prospective areas such as Zone 3 continue to offer additional potential."

"A priority in 2018 has been to identify additional zinc resources with step-out drill holes. In addition, several infill holes have been drilled, to test for repetitions of the mineralized limestone beneath and within areas of known resources where key information was lacking. The infill holes drilled at the South and West areas have improved our geological model and understanding of the controls of the mineralization, while also confirming the continuity of grade and thickness of zinc mineralization."

"Tinka has so far drilled 19,000 metres in 2018, on top of 46,000 metres drilled at the Ayawilca project from the initial discovery in 2013 to the end of 2017. A resource update is planned for Q4 2018, based on all drill data to the end of September 2018. An additional 1,000-2,000 metres of drilling is planned for the remainder of the year, with one rig operating at site. Importantly, the 2018 drill program is on schedule and on budget."

"Upon completion of the resource update in Q4 2018, the Company will be in a position to either move ahead with a Preliminary Economic Assessment in 2019, or to focus on further resource expansion.  In the meantime, we look forward to updating our shareholders with information on additional drill results and the upcoming resource update."


ARIVA.DE Börsen-Geflüster

Kurse

0,0971 $
-0,92%
Tinka Resources Chart

Highlights – Infill holes at West Ayawilca

Hole A18-141:

  • 89.0 metres at 5.0% zinc, 11 g/t silver & 97 g/t indium from 288.0 metres depth, including
    3.0 metres at 22.4% zinc, 30 g/t silver & 129 g/t indium from 374.0 metres depth.

Hole A18-143:

  • 14.0 metres at 9.1% zinc, 10 g/t silver & 15 g/t indium from 146.0 metres depth; and
  • 5.5 metres at 15.1% zinc, 19 g/t silver & 196 g/t indium from 298.0 metres depth, including
    2.9 metres at 24.8% zinc, 29 g/t silver & 298 g/t indium from 300.2 metres depth. 

Hole A18-145:

  • 42.0 metres at 5.2% zinc, 12 g/t silver & 144 g/t indium from 302.0 metres depth.

Hole A18-137:

  • 12.7 metres at 10.3% zinc, 18 g/t silver & 306 g/t indium from 279.3 metres depth, including
    3.2 metres at 25.7% zinc, 35 g/t silver & 638 g/t indium from 286.9 metres depth.

Hole A18-140:

  • 9.0 metres at 8.8% zinc, 10 g/t silver & 78 g/t indium from 283.6 metres depth;

Highlights – Infill holes at South Ayawilca

Hole A18-139:

  • 20.5 metres at 5.6% zinc, 5 g/t silver & 63 g/t indium from 248.0 metres depth, including
    2.4 metres at 18.1% zinc, 17 g/t silver & 162 g/t indium from 258.6 metres depth; and
  • 2.9 metres at 15.7% zinc, 0.5% lead & 29 g/t silver from 313.1 metres depth.

Hole A18-142:

  • 19.1 metres at 8.5% zinc, 16 g/t silver & 105 g/t indium from 232.7 metres depth, including
    2.1 metres at 38.4% zinc, 31 g/t silver & 525 g/t indium from 243.6 metres depth.

Highlights – Step-out drill holes

Hole A18-148 (Central Ayawilca):

  • 5.5 metres at 9.8% zinc, 8 g/t silver & 42 g/t indium from 378.6 metres depth in limestone.

Hole A18-146 (South Ayawilca):

  • 1.7 metres at 26.9% zinc, 0.9% lead & 1,526 g/t silver from 57.0 metres depth in the Upper Manto.

Hole A18-138 (Camp):

  • 1.5 metres at 19.3% zinc, 100 g/t silver & 138 g/t indium from 146.2 metres depth in limestone.

Hole A18-150 (West Ayawilca):

  • 9.6 metres at 6.3% zinc, 5 g/t silver & 77 g/t indium from 337.9 metres depth in limestone.

Note: All intercepts shown above are down-hole intercepts.  True thicknesses of the zinc intersections are estimated to be at least 85% of the downhole thicknesses.

List of attached figures:

  • Figure 1 is a drill hole location map highlighting holes with recent results in RED.
  • Figure 2 is a long section of South Ayawilca A-A' viewing to the north.
  • Figure 3 is a long section of West Ayawilca B-B' viewing to the northwest.
  • Figure 4 is a cross section of West and South Ayawilca C-C' viewing to the northeast.

List of attached tables:

  • Table 1 shows new significant drill intercepts with the strongest intercepts in bold text.
  • Table 2 summarizes the drill collar information for the recent holes.

Summary of Ayawilca Inferred Zinc Zone Mineral Resources (Nov' 8, 2017)

South Ayawilca

13.3 million tonnes at 9.5% ZnEq (7.6% zinc, 0.2 % lead, 25 g/t silver & 118 g/t indium)

West Ayawilca

9.0 million tonnes at 7.2% ZnEq (6.1% zinc, 0.2 % lead, 14 g/t silver & 64 g/t indium)

Central Zone    

13.0 million tonnes at 5.7% ZnEq (4.7% zinc, 0.3 % lead, 13 g/t silver & 54 g/t indium)

East Ayawilca  

7.5 million tonnes at 6.2% ZnEq (5.1% zinc, 0.2 % lead, 13 g/t silver & 69 g/t indium) 

TOTAL

42.7 million tonnes at 7.3% ZnEq (6.0% zinc, 0.2% lead, 17 g/t silver & 79 g/t indium)

Notes:

1

US$55/t NSR cut off was used. Metal price assumptions were US$1.15/lb Zn, US$300/kg In, US$18/oz Ag, US$1.10/lb Pb. Metal recovery assumptions were 90% Zn, 75% In, 60% Ag, and 75% Pb for the ZnEq calculation.

2

The NSR value was calculated using the formula: NSR = Zn(%)*US$15.34+Pb(%)*US$6.15+In(g/t)*US$0.18+Ag(g/t)*US$0.27

3

The ZnEq value was calculated using the formula: ZnEq = NSR/US$15.34

4

Numbers may not add due to rounding

Table 1. Recent significant drill intercepts at Ayawilca











Drill hole

From m

To m

Interval m

Zn %

Pb %

Ag g/t

Indium g/t

Area

Comment

A18-137

178.00

182.10

4.10

2.3

2.8

102

0

West

Infill

and

250.00

253.30

3.30

9.4

1.9

58

2

West


and

279.30

292.00

12.70

10.3

0.0

18

306

West



including

286.90

290.10

3.20

25.7

0.0

35

638

West


A18-138

104.70

105.10

0.40

26.7

0.3

Werbung

Mehr Nachrichten zur Tinka Resources Aktie kostenlos abonnieren

E-Mail-Adresse
Benachrichtigungen von ARIVA.DE
(Mit der Bestellung akzeptierst du die Datenschutzhinweise)

Hinweis: ARIVA.DE veröffentlicht in dieser Rubrik Analysen, Kolumnen und Nachrichten aus verschiedenen Quellen. Die ARIVA.DE AG ist nicht verantwortlich für Inhalte, die erkennbar von Dritten in den „News“-Bereich dieser Webseite eingestellt worden sind, und macht sich diese nicht zu Eigen. Diese Inhalte sind insbesondere durch eine entsprechende „von“-Kennzeichnung unterhalb der Artikelüberschrift und/oder durch den Link „Um den vollständigen Artikel zu lesen, klicken Sie bitte hier.“ erkennbar; verantwortlich für diese Inhalte ist allein der genannte Dritte.