Pacific Wildcat Resources Corp.: Diamond Drilling Confirms Depth Potential for Mineralisation at Mrima Hill
www.pacificwildcat.com/_content/documents/430.pdf
Figure 2 outlines the significant Rare Earth drill results returned from drilling carried out by PAW over the last two drill campaigns, namely 975m of RC drilling in late 2010 and 1,810m of diamond drilling in 2011.
The objective of the program is to identify a maiden Inferred Rare Earth Resource estimate of between 10 and 20 million tonnes at grades ranging from 3.0 to 5.0% Total Rare Earth Oxides (“TREO”) by the end of the second quarter of 2012.
Cash flow from modest scale tantalum mining operation in Mozambique expected in 1st Qtr 2012
Mineralisation from surface on exposed low hill – potential for low strip ratio, open pit mining
www.pacificwildcat.com/_content/documents/423.pdf
Top 5 global Niobium Resource(1)
Targeting a maiden high grade NI 43-101 compliant REO Resource during 2nd Qtr 2012
Mkt.Cap. 90mio
shares FD 150mio
Targeting 15+ year niobium mine life
1.500mio lbs. Niob
Environmental base line studies anticipated to be completed 4th Qtr 2011
www.pacificwildcat.com/_content/documents/425.pdf
www.pacificwildcat.com/_content/documents/430.pdf
Figure 2 outlines the significant Rare Earth drill results returned from drilling carried out by PAW over the last two drill campaigns, namely 975m of RC drilling in late 2010 and 1,810m of diamond drilling in 2011.
The objective of the program is to identify a maiden Inferred Rare Earth Resource estimate of between 10 and 20 million tonnes at grades ranging from 3.0 to 5.0% Total Rare Earth Oxides (“TREO”) by the end of the second quarter of 2012.
Cash flow from modest scale tantalum mining operation in Mozambique expected in 1st Qtr 2012
Mineralisation from surface on exposed low hill – potential for low strip ratio, open pit mining
www.pacificwildcat.com/_content/documents/423.pdf
Top 5 global Niobium Resource(1)
Targeting a maiden high grade NI 43-101 compliant REO Resource during 2nd Qtr 2012
Mkt.Cap. 90mio
shares FD 150mio
Targeting 15+ year niobium mine life
1.500mio lbs. Niob
Environmental base line studies anticipated to be completed 4th Qtr 2011
www.pacificwildcat.com/_content/documents/425.pdf