Du kannst ja zukünftig für das Solarworld Forum schreiben - die bringen es immerhin
mit gut 58k Postings auf 99% Verlust - das ist doch mal eine Zeilenrendite
@all
In fiscal 2015 and 2016, we are planning to have invested approximately $2 million, including in fiscal 2015 we have invested $670,000 to start building a new facility with annual capacity of 500 metric tons in order to meet substantially increased demand for its high-grade stevia products. The new manufacturing facility is fully equipped with stainless steel equipment and a fully automated system in order to prevent any potential contamination from operators and plastic. In addition, the new manufacturing facility uses the most advanced production equipment that is the first time to be used for stevia production in the industry, such as scraper with centrifuge and fluidized drying system.
As of now, Sunwin Stevia has approximately 1,600 metric tons in manufacturing capacity per year to produce high-grade stevia extract. With these manufacturing facilities, Sunwin Stevia is able to deliver stevia products containing Rebaudioside A in a range of 50% to 99% with a format of powder, granular, or tablet.
Our total stevioside production capacity is approximately 800 metric tons annually
und Anfang Juni
announced today that it has completed construction of a new manufacturing facility that can produce 500 metric tons of high-grade stevia per year. The new facility has been in operation to produce high-grade stevia products on a commercial basis for the market.
D.h. erst Anfang Juni 2015 hatten sie wieder die 800 Tonnen Produktionskapazität für Stevioside theoretisch (gab es schon Testläufe im Juni?), davor gab es eben eine Art Engpass durch die Aufgabe der alten Anlage "1,7 Mio Sonderabschreibung im 4. Quartal" FJ 2015. Insofern machte es schon Sinn, sich auf die lukrativeren Aufträge zu konzentrieren, zumal es offensichtlich Rahmenabkommen für 12 Monate sein müssen (ansonsten wäre es ziemlich stumpfsinnig, sich nach 4 Monaten im GJ aus dem Fenster zu lehnen und für die weiteren 8 Monate eine Umsatz- und
Bruttomargenprognose abzugeben)... und dies hieße, dass bei höherem Kapazitätsangebot in den Anlagen auch wieder Aufträge mit niedrigeren Margen gefahren werden können, weil dabei nur geringe variable Mehrkosten entstehen.
Interessant finde ich übrigens auch noch, dass trotz eines starken Verkaufsanstiegs im Stevia Bereich sich die Versandkosten gegenüber dem Vorjahresquartal halbiert (auf knapp 42.000) haben. Dies deutet darauf hin, dass es neben den beschriebenen Erhöhungen im Produktpreis (average unit sale price is increased by approximately 34.7%) auch die Möglichkeit gibt, dem Kunden vermehrt die Frachtkosten aufs Auge zu drücken.
mit gut 58k Postings auf 99% Verlust - das ist doch mal eine Zeilenrendite
@all
In fiscal 2015 and 2016, we are planning to have invested approximately $2 million, including in fiscal 2015 we have invested $670,000 to start building a new facility with annual capacity of 500 metric tons in order to meet substantially increased demand for its high-grade stevia products. The new manufacturing facility is fully equipped with stainless steel equipment and a fully automated system in order to prevent any potential contamination from operators and plastic. In addition, the new manufacturing facility uses the most advanced production equipment that is the first time to be used for stevia production in the industry, such as scraper with centrifuge and fluidized drying system.
As of now, Sunwin Stevia has approximately 1,600 metric tons in manufacturing capacity per year to produce high-grade stevia extract. With these manufacturing facilities, Sunwin Stevia is able to deliver stevia products containing Rebaudioside A in a range of 50% to 99% with a format of powder, granular, or tablet.
Our total stevioside production capacity is approximately 800 metric tons annually
und Anfang Juni
announced today that it has completed construction of a new manufacturing facility that can produce 500 metric tons of high-grade stevia per year. The new facility has been in operation to produce high-grade stevia products on a commercial basis for the market.
D.h. erst Anfang Juni 2015 hatten sie wieder die 800 Tonnen Produktionskapazität für Stevioside theoretisch (gab es schon Testläufe im Juni?), davor gab es eben eine Art Engpass durch die Aufgabe der alten Anlage "1,7 Mio Sonderabschreibung im 4. Quartal" FJ 2015. Insofern machte es schon Sinn, sich auf die lukrativeren Aufträge zu konzentrieren, zumal es offensichtlich Rahmenabkommen für 12 Monate sein müssen (ansonsten wäre es ziemlich stumpfsinnig, sich nach 4 Monaten im GJ aus dem Fenster zu lehnen und für die weiteren 8 Monate eine Umsatz- und
Bruttomargenprognose abzugeben)... und dies hieße, dass bei höherem Kapazitätsangebot in den Anlagen auch wieder Aufträge mit niedrigeren Margen gefahren werden können, weil dabei nur geringe variable Mehrkosten entstehen.
Interessant finde ich übrigens auch noch, dass trotz eines starken Verkaufsanstiegs im Stevia Bereich sich die Versandkosten gegenüber dem Vorjahresquartal halbiert (auf knapp 42.000) haben. Dies deutet darauf hin, dass es neben den beschriebenen Erhöhungen im Produktpreis (average unit sale price is increased by approximately 34.7%) auch die Möglichkeit gibt, dem Kunden vermehrt die Frachtkosten aufs Auge zu drücken.