hat Sunwin aber im Fiskaljahr 2017 sogar schon 829 Tonnen produziert.
Im Vorjahr waren es noch 576 Tonnen.
"...
We set our production schedules based on the market demand and our capacity. Our total stevioside production capacity is approximately 1,200 metric tons annually which we believe is sufficient to meet demand. In fiscal 2017, we manufactured approximately 829 metric tons of stevioside, an increase of 253 metric tons from the prior year, to better supply the market demand.
..."
Außerdem wird dort von 1200 Tonnen Maximal-Auslastung ausgegangen.
"...
in fiscal 2017 and fiscal 2016, respectively, to purchase new manufacturing equipments for our facility with annual capacity of 500 metric tons in order to meet substantially increased demand for its high-grade stevia products. The new manufacturing facility is fully equipped with stainless steel equipment ...
...As of now, Sunwin Stevia has approximately 1,200 metric tons of manufacturing capacity per year to produce high-grade stevia extract. With these manufacturing facilities, Sunwin Stevia is able to deliver stevia products containing Rebaudioside A in a range of 50% to 99% with a format of powder, granular, or tablet.
..."
Dies entspräche einer Anlagenauslastung von 69% im FJ 2017.
Und trotzdem "... FJ 2017 Total comprehensive loss $(4,756,311)..."
backend.otcmarkets.com/otcapi/company/...2199304/content/html