Bandwurm : 70MW WIndpark in den USA für Nordex #23684 3 07.05.13 15:10 Tuesday, May 07, 2013 7:11 AM HILL CITY -- The reality of a wind farm in Graham County took a step closer last week when Graham County commissioners approved a conditional-use permit for Ringneck Prairie Wind Farm. The 70-megawatt farm, to be located 6 miles south of Hill City, is on pace to be fully commissioned by the end of 2014, according to Kirk Schweitzer, director of Graham County Economic Development. Wind data collected from four meteorological towers across the county was promising, with peak wind data drawing a lot of interest from developers, Schweitzer said. Eventually, Nordex USA signed on as the project developer. http://www.salina.com/news/HAYS--Graham-County-OKs-wind-farm-5-6-13
Danke für das update....
raldinho: jo........Wind Farm Update May 1, 2012 Nordex USA, Inc. continues to move forward with plans to develop the Ringneck Prairie Wind Project ...These two sites will be purchased and owned by Nordex.
http://discoverhillcity.com/Document.aspx?id=12601.....
www.ariva.de/forum/Nordex-Akte-X-442705?page=598
ist aber was älter....siehe die nachfolgende Quelle....
muecke1: SemperAugustus 30.06.11 16:22 #1626 Nordex Anteilbesitzes von USA Beebe Wind LLC und Way Wind LLC siehe Meldung 300MW und120MW Republikc Wind LLC ?MW Fat Rock Win LLC ?MW Big Berry Wind LLC ?MW Green Hills Wind LLC ?MW Ringneck Prairie Wind LLC ?MW Advent Winnd LLC ?MW
http://nordex-10.sw-gb.de/index.php?id=686&L=
hast recheriert?
Offshore-Windenergie ist eine tragende Säule der Energiewende - das weltweite Investitionsvolumen für Offshore-Windenergie wächst bis 2020 auf 130 Milliarden Euro
http://www.finanzen.net/nachricht/aktien/...0-Milliarden-Euro-2418774
ohje und Nordex nicht dabei!
T h e s a m e, zur dieser Studie!? raldinho würde folgendes was sagen, macht nichts, ich habe was genug Projekte im Talon, vielleich auch die Onshore-Herz-Dame, wohl ohne was Spam, bitte mein Herr!!
zu Offshore sagt Nordex nein! Diese MW Aufträge fehlen, Thesame! und welche hat Nordex heuer schon gemeldet, achso das Projekt mit der N117 und dem Rotordurchmesser von 115 m!
hahahahahahahahahaha
Kanzlerin Angela Merkel (CDU) hat die Pläne zum Ausbau der Windenergie auf See und an der Küste verteidigt.
http://www.focus.de/finanzen/news/...-der-windenergie_aid_983305.html
GRÄSBÖLEN WIND POWER PROJECT noise study Southwest Finland Energy Ltd / egentligen Finlands Energi Ab 09/01/2013 The planned wind farm consists of 5 turbines. A single wind power plant has an estimated 2.3 to 4 megawatts (MW) and a hub height of about 100-141 meters above the ground. The aim is to wind turbines would be in production in 2014. Southwest Finland Energy Ltd has melulaskennat, which examined the Gräsbölen wind farm turbine wind farm on the noise levels in the surrounding area. Initially melumallinnukset was carried out three different turbiinityypille: Nordex N117 2.4 MW, 3 MW Enercon E101 and 108 Siemens 2.3 MW. Siemens turbine, however, was removed jatkotutkiskeluista study because of its sound power level was found to be too high for that location (LWA = 108 dB), and the design was continued only Nordex and Enercon turbines
|
| Wertung | Antworten | Thema | Verfasser | letzter Verfasser | letzter Beitrag | |
| 119 | 43.525 | Nordex vor einer Neubewertung | ulm000 | alter_Schwede | 09.06.26 20:23 | |
| 66 | 29.407 | ** News zu Nordex ** (SPAM-FREE) | Roecki | KeeneAhnung | 25.02.26 09:45 | |
| 36 | 2.298 | Nordex - Die Chance! | brodz | brodz | 10.05.24 10:26 | |
| 6 | 895 | Windenergie - Neuausrichtung der Branche | DrShnuggle | Terrist | 02.08.23 17:23 |