Tamerlane Ventures - Finanzierung steht!


Thema
abonnieren
Beiträge: 159
Zugriffe: 46.943 / Heute: 5
Tamerlane Ventur. kein aktueller Kurs verfügbar
 
Mr. Dino:

Tamerlane Ventures - Finanzierung steht!

8
19.02.11 23:53
Tamerlane Ventures - Finanzierung steht! 9819224
Tamerlane Ventures Inc. is a mining company with base metal development projects in Canada and Peru. The Company is putting Canada’s world-class zinc-lead Pine Point Property back into production and developing its recently acquired Los Pinos dump leach copper project in Peru.
Tamerlane Ventures ist am Freitag +32% in Frankfurt nach bekanntwerden der gesicherten Finanzierung zum Aufbau und Reaktivierung ihrer Pine Point Mine in Kanada gestiegen. Das Unternehmen hat meiner Meinung nach ein großes Potential.


Hier die Fakten zum Unternehmen - weitere Infos stehen auch in den Firmenpräsentationen auf der Homepage des Unternehmens:

+ gehören 175 qkm in den North West Territories, Kanada und Los Pinos in Peru, 100km südl. von Lima  
+ besitzen in Kanada bestätigte und vermutete 7,8 Mio t mineralhaltiges Gestein (Blei@3.01%, Zink @ 6,16%) + weitere 12.1 Mio t Gestein (Zink @2,26%,2,36% / Blei@1,13%, 0,82%=weiteres Explorationspotential)
+Pine Point Mine wird zuerst entwickelt : Reserven von 1 Mio t (Zink@11,16%/ Blei@5,49%)
+ weitere Vorkommen an Kupfer in Peru (Exploration basiert auf 1994 durchgeführten Probebohrungen)
+ Kupfer kostengünstig zu gewinnen
+ Infrastruktur in Kanada vorhanden (Eisenbahn ca. 40 km entfernt, allwettertaugliche Straße vorhanden, Eisenbahn zur Mine könnte mit geringem Kostenaufwand wieder hergestellt werden (wurde vor 20 Jahren entfernt)
+ 60 Mio US-$ Finanzierung zur Entwicklung der Pine Point Mine als Kredit gesichert


Ich bewerte die Fakten wie folgt:

Das Minengelände der Pine Point Mine in Kanada besitzt eine gute Anbindung an die Infrastruktur mit Ausbaupotential. Eine Entwicklung dieser Mine hat Priorität 1, da die hohen Vererzungsgrade nach der Produktion weiteren Cashflow für den den notwendigen Ausbau generieren. Bestätigte und unter den aktuellen wirtschaftlichen Gesichtspunkten abbaubare Reserven sind ebenfalls in den weiteren von TAMERLANE kontrollierten 175qkm vorhanden und bieten zusätzlich noch ein grösseres Explorationspotential. Grundsätzlich ist in dieser Region aus geologischer Sicht relativ viel Blei und Zink, neben zahlreichen weiteren Erzmineralien (z.B. Kupfer, Gold, Silber,...) zu erwarten - die wirtschaftliche Gewinnung mal ausser Acht gelassen.
Für die Mine Los Pinos in Peru liegen lediglich ca. 17 Jahre alte Erkundungsdaten vor. Auch hier ist m.E. noch relativ viel Explorationspotential vorhanden und auch notwendig.

Hier die Links:

http://www.tamerlaneventures.com/
http://www.tamerlaneventures.com/index.php/...enior-secured-financing
http://www.tamerlaneventures.com/index.php/...coverage-quick-links-90


--------------------------------------------------
Dieses Forum und dieser Thread stellen keine Kaufempfehlung dar. Die Bildung einer eigenen Meinung ist immer erfoderlich.
Antworten

Werbung

Entdecke die beliebtesten ETFs von Amundi

Lyxor Net Zero 2050 S&P World Climate PAB (DR) UCITS ETF Acc
Perf. 12M: +206,18%
Amundi Nasdaq-100 Daily (2x) Leveraged UCITS ETF - Acc
Perf. 12M: +67,79%
Amundi IBEX 35 Doble Apalancado Diario (2x) UCITS ETF Acc
Perf. 12M: +67,04%
Amundi MSCI New Energy UCITS ETF Dist
Perf. 12M: +66,95%
Amundi Global Hydrogen UCITS ETF - Acc
Perf. 12M: +54,83%

Alfgolf2:

sehr großes Potenzial

4
20.02.11 08:43
in den nächsten 3-4 Jahren werden ca. 25% der bestehenden Blei/Zink-minen schließen...und das sind große Minen !! Tamerlane wird dann schon gut produzieren und somit vom erwarteten Preisansteig überproportional profitieren !

Bei einer jetzigen Marktkapitalisierung von um die 20 Millionen KDollar ein echter witz !

Die Finanzierung steht ohne größere Aktienverwässerung...sehr schön für die Aktionäre !

Schaut Euch das Video und die letzten Präsentationen an-Hammer !!!

ich bin stark eingestiegen und freue mich auf die nächsten News zwecks weiterer Explorationen und natürlich dem Minenbau !

Gruss an alle
Nur wer an sich glaubt, kann anderen helfen, an sich zu glauben.
Antworten
njimko:

Tamerlane Kupfer auf Los Pinos Peru

6
21.02.11 20:57
Auszug aus der neuesten Präsentation von Tamerlane. Das peruanische Kupferprojekt ist schon in diesem frühen Stadium ein aussichtsreicher Kandidat für die Produktion!
Mit den historischen Resourcen von ca 300 - 400 MIbCu und dem aktuellen Preis, sowie der angedeuteten open pit Mine mit geringem strip ratio sollte sich für die Zukunft ein positiver NPV ergeben. Auch die Chancen sind offen in die Tiefe. Es ist später noch einiges zu erwarten.
Zuerst sollen aber die Zn,Pb Resourcen in Kanada 2/2013 in Produktion gehen, mit 5,2MrdIbZnEq und einer LOM von acht Jahren könnte das der Treibsatz für Los Pinos werden. Viel Glück allen Investierten!
Gruß
(Verkleinert auf 64%) vergrößern
Tamerlane Ventures - Finanzierung steht! 382801
Antworten
Mr. Dino:

Pine Point Mine

6
21.02.11 22:41
Habe mir gerade mal die Pine Point Mine auf Googlemaps angeschaut (Suchbegriff: "Pine Point Canada") und wollte Euch das Bild der Minenanlage nicht vorenthalten. Leider ist bei Googlemaps nicht ersichtlich, wie alt das Satellitenbild ist. Imposant ist die Minenanlage aber trotzdem: Besonders deutlich ist die Anbindung an die Verkehrswege zu erkennen.
Abbau und Exploration sollen nach Aussage von Tamerlane in westl. Richtung fortgeführt werden.

Quelle des Satbild: Goolgemaps
Tamerlane Ventures - Finanzierung steht! 382832
Antworten
Alfgolf2:

Lichtblick

5
23.02.11 04:45
gestern viele Werte tiefrot...TAM +6% !! zeigt Stärke....fein fein
Nur wer an sich glaubt, kann anderen helfen, an sich zu glauben.
Antworten
sonnenstern2.:

Verstärkung für das Team

5
28.02.11 15:50
Feb 24, 2011 13:32 ET
Tamerlane Appoints Gregg Sloate as Director of Investor Relations and Corporate Communications

BELLINGHAM, WASHINGTON--(Marketwire - Feb. 24, 2011) -

NOT FOR DISTRIBUTION TO U.S. NEWSWIRE SERVICES OR FOR DISSEMINATION IN THE UNITED STATES. ANY FAILURE TO COMPLY WITH THIS RESTRICTION MAY CONSTITUTE A VIOLATION OF U.S. SECURITIES LAW.

Tamerlane Ventures Inc. ("Tamerlane" or "the Company") (TSX VENTURE:TAM) is pleased to announce the appointment of Gregg B. Sloate as Director of Investor Relations and Corporate Communications. Based at Tamerlane's corporate offices in Bellingham, Washington, Mr. Sloate is responsible for all aspects of the company's investor relations and corporate communications programs.

Mr. Sloate brings a wealth of investor relations knowledge to the Company. His background includes investor relations/corporate communications experience at Merisel, a former Fortune 500 computer hardware and software distributor, at Tanox, a late-stage biopharmaceutical company, and at Univar, one of the world's leading chemical distributors. His experience also includes tenure as a senior account manager at a major investor relations and public relations agency where he provided consulting services to a broad range of companies. Previously, Mr. Sloate had been with the institutional investment firm of Seidler Amdec Securities as a securities analyst.

Mr. Sloate holds a Bachelor of Science degree in Business Administration from the University of Southern California, with an emphasis in corporate finance and investment management.

Michael Willett, CEO of Tamerlane Ventures, commented, "We are very pleased to have Gregg join our management team in this newly-created key role. We expect that Gregg's substantial experience will benefit the company in advancing our investor relations and public relations programs. The Company has allocated a substantial budget to an immediate program to introduce Tamerlane to the worldwide investment community as we continue to ramp up activities at our Pine Point Project, for which we recently signed a term sheet for US$60 million in bridge financing."

About Tamerlane Ventures Inc.

Tamerlane Ventures Inc. is an exploration and development mining company with advanced base metal development projects in Canada and Peru. The Company is working toward bringing the world-class lead-zinc Pine Point Property back into production in the Northwest Territories, Canada, and developing its Los Pinos heap leach copper project in Peru. The Company's primary focus is the Pine Point Project, which consists of the Pine Point Mine, which was the largest and most profitable base metal mine in Canadian history. Tamerlane owns 100% of the Pine Point Project, along with a large contiguous property to the west. The Company is developing and building the project and will sell the well-known Pine Point Concentrates to various smelting facilities around the world.

On behalf of Tamerlane Ventures Inc.

"Michael A. Willett"

Chief Executive Officer
Antworten
Alfgolf2:

TAM auf

4
01.03.11 17:46
DEM VORMARSCH !!
Nur wer an sich glaubt, kann anderen helfen, an sich zu glauben.
Antworten
Mr. Dino:

Verstärkung durch Gregg Sloate

4
01.03.11 21:44
Nachdem Gregg Sloate mit an Bord bei Tamerlane ist, gehe ich davon aus, daß wohl auch verstärkt Analysten auf Tamerlane aufmerksam werden...
Antworten
BioLogic:

Timeliner

6
01.03.11 22:27
wie immer, super Thread, alle Infos drin und super Aktie.

Weiter so super Arbeit, lasst sie laufen. Im Endeffeckt wird 2012 für Tamerlane so richtig interessant werden, kurz vor Zincknappheit und ihrer Produktion sind Preise bis 4 oder sogar 5 $ möglich.

lg
Bio
Posts sind keine Empfehlung zum Kauf oder Verkauf.
Alle Posts stellen nur meine eigene Meinung dar.
Antworten
Alfgolf2:

he ha wer da?? grins

 
02.03.11 15:36
ICH VERRATE AUCH NICHT; WER DIESE GOLDGRUBE ENTDECKT HAT !!!!!!!!! HEHE.....

hat derjenige nicht noch so ein Tipp:))

..........................................:::....................­.
Nur wer an sich glaubt, kann anderen helfen, an sich zu glauben.
Antworten
Reminder123:

fast schon

3
03.03.11 09:25
ein bisschen beängstigend dieser regelmäßige Anstieg um 1-2 Cent pro Tag :) Aber mir soll's Recht sein. Eigentlich war es klar, ist schließlich meine kleinste Position :)
Antworten
Alfgolf2:

Tam weiter extrem stark !!

 
03.03.11 18:01
TH wieder fast 10% plus....wenn man es nicht besser wüßte könnte man denken, da kommt demnächst noch ne NEWS ?!

war doch aber gerade:)?

Hohes Volumen,ach was sag ich"beängstigendes Volumen"!!

heute noch die 50cent??

wer nimmt Wetten entgegen??

Gruss

Reminder---------------noch die kleinste posi.......glaube mir das kann schnell drehen!!!!!
Nur wer an sich glaubt, kann anderen helfen, an sich zu glauben.
Antworten
Alfgolf2:

habs befürchtet

3
04.03.11 19:59
dicker ausverkauf heute.....das ging zu schnell...nerv !!!

wieder einmal zu früh gefreut:(
Nur wer an sich glaubt, kann anderen helfen, an sich zu glauben.
Antworten
Mr. Dino:

@Reminder 123: Langfristig...

2
07.03.11 20:53
...betrachtet, geht's doch aufwärts. Bei dem Potential, daß Tamerlane bietet, ist doch ein kleiner Kursrückgang durchaus als Chance zum Aufstocken zu sehen...
Antworten
Mr. Dino:

Fortschritte beim Aufbau der Pine Point Mine

3
09.03.11 18:34
Tamerlane Signs Contracts to Advance Its Pine Point Lead-Zinc Project into Production
Monday, March 07, 2011

NOT FOR DISTRIBUTION TO U.S. NEWSWIRE SERVICES OR FOR DISSEMINATION IN THE UNITED STATES.  ANY FAILURE TO COMPLY WITH THIS RESTRICTION MAY CONSTITUTE A VIOLATION OF U.S. SECURITIES LAW.

BELLINGHAM, Wash., USA – Tamerlane Ventures Inc. ("Tamerlane" or “the Company") (TSX-V: TAM) announced today that it has signed two significant contracts to advance its Pine Point lead-zinc project in the Northwest Territories into production.

The Company is pleased to have elected to partner with Axxent Engineering Ltd., with whom it has entered into a major contract.

Axxent Engineering Ltd. is undertaking the definitive engineering on the milling facility and surface infrastructure. This work includes the preparation of the tender packages and final selection of process equipment. Long lead-time items will be sourced and secured.

The Company is also pleased to have selected Rescan Environmental Services Ltd. as its environmental consultants. Rescan Environmental Services Ltd. will be assisting the Company with all of its environmental work for the project, which will include the baseline environmental studies for the additional N-204 deposit located at the northeast corner of the Company’s land package. Rescan has significant experience working in the Northwest Territories and has an office in Yellowknife.

Tamerlane continues to prepare the project for construction. Technical work completed to date has provided confirmation that there has been minimal impact to the capital and operating cost estimates over the last two years.  

Mike Willett, CEO of Tamerlane, commented, “Following the closing of the bridge and standby financings last December, we are pleased to announce that we have commenced the awarding of definitive engineering and construction contracts. We are also making significant progress in evaluating financing proposals for the US$50 million tranche of subordinated financing which may come in the form of an off-take or a prepaid metal sales agreement. We anticipate commissioning the metallurgical facilities in the summer of 2013 following delivery of ore from underground.”

About Tamerlane Ventures Inc.

Tamerlane Ventures Inc. is an exploration and development mining company with advanced base metal development projects in Canada and Peru. The Company is working toward bringing the world-class lead-zinc Pine Point Property back into production in the Northwest Territories, Canada, and developing its Los Pinos heap leach copper project in Peru. The Company’s primary focus is the Pine Point Project, which consists of the Pine Point Mine, which was the largest and most profitable base metal mine in Canadian history. Tamerlane owns 100% of the Pine Point Project, along with a large contiguous property to the west. The Company is developing and building the project and plans to sell the well-known Pine Point Concentrates to various smelting facilities around the world.

On behalf of Tamerlane Ventures Inc.

“Michael A. Willett”

Chief Executive Officer
Antworten
sonnenstern2.:

Bestätigung des Pine Point Projektes

3
17.03.11 20:42
Tamerlane Plans to Expand Resources at Pine Point Lead-Zinc Project

BELLINGHAM, WASHINGTON--(Marketwire - March 17, 2011) -

NOT FOR DISTRIBUTION TO U.S. NEWSWIRE SERVICES OR FOR DISSEMINATION IN THE UNITED STATES. ANY FAILURE TO COMPLY WITH THIS RESTRICTION MAY CONSTITUTE A VIOLATION OF U.S. SECURITIES LAW.

Tamerlane Ventures Inc. ("Tamerlane" or "the Company") (TSX VENTURE:TAM) announced today that it is commencing a confirmation diamond drilling program on the W-85 deposit at the Company's 100%-owned Pine Point lead-zinc project, located in the Northwest Territories, Canada. As a result of historical drilling and preliminary modeling, it has been determined that this deposit may be mined by surface mining methods. The results of the drilling are expected to expand the existing resources at Pine Point.

The existing historical resource* on W-85 is as follows:

Tonnes   Lead % Zinc %
3,760,000 2.3        4.0

The purpose of this program is to convert historical W-85 resources into National Instrument ("NI") 43-101-compliant reserves and provide enough samples to process the rock through the R-190 flowsheet, which includes dense media separation. The new drill program will consist of approximately 10 diamond drill holes totaling up to 1,307 meters. This drill program will enable the W-85 deposit to be added to the current mineral inventory, which is detailed below. Drilling is expected to continue through mid-July, 2011, and the results of this drilling program are expected to be published by year-end 2011. The Company has contracted with ProCore Drilling of Hay River, Northwest Territories to complete the drill program.

Pine Point Mineral Inventory**

  Category Tonnes                                           Lead % Zinc %

Underground Proven & Probable** 7,790,271
          §                                                                                3.01 6.16

  Measured & Indicated                8,030,000 1.13 2.26

Open Pit (N204)         Indicated 9,166,000 0.92 3.42

                                  Inferred       2,413,000 0.86 3.04

**The Pine Point Property was the subject of a completed National Instrument 43-101 report (NI 43-101). The reserve and resource technical report was prepared by Pincock, Allen and Holt (PAH) July 30, 2008. The report is named "NI 43-101 Technical Report Update Pine Point Project Northwest Territories Canada". The reserve is based on the mining of the following deposits: P-190, P-499, O-556, X-25, Z-155, and G-03. The open pit resources are based on a 43-101 report prepared by PAH on the N-204 deposit.

Remaining Historical Resources*
(including W-85)
(Non NI 43-101 Compliant) Tonnes Lead % Zinc %
Total Remaining Historical Resource 34,221,000 1.4 4.4

*The historical estimates presented above are not in accordance with the mineral resources or mineral reserves classifications contained in the CIM Definition Standards on Mineral Resources and Mineral Reserves, as required by National Instrument 43-101 ("NI 43-101"). Accordingly, the company is not treating these historical estimates as current mineral resources or mineral reserves as defined in NI 43-101 and such historical estimates should not be relied upon. A qualified person has not done sufficient work to date to classify the historical estimates as current mineral resources or mineral reserves.

The existing Pine Point project currently has approximately nine years of reserves. The upgrading of N-204 to reserve by mid-summer and the upgrading of W-85 to reserve by late this year would result in a reserve that will support a 15-year mine life. This would still leave a significant amount of historical resource that can be upgraded for additional mine life. The objective in expending current funds to upgrade the historical resource is to extend the mine life of the project to a level where the project will support conventional long-term bank debt. It is envisioned that the existing US$60 million bridge loan which the company is currently negotiating will be repaid with conventional, lower-interest bank lending once the project is up and running. Having a greater-than-15-year mine life is expected to allow the Company to negotiate more favorable terms for future financing packages.

Mike Willett, CEO of Tamerlane Ventures, commented, "We plan to build Tamerlane into a mid-tier company, and to do this we need long-life projects. The combination of a long-life reserve coupled with the modest amount of capital expenditure to get the project into production results in Tamerlane being an attractive base metal exploration/development company. As we advance toward building the mine and the processing facility, we expect to continue converting historical resources into reserves, further strengthening the project."

Mr. Willett continued, "In addition, we also have 35 geophysical anomalies that have been identified since we acquired the property, but which have not yet been tested. Our plan is to move forward with an exploration program to test several of these anomalies."

The information in this press release was prepared under the guidance of Mr. Ross F. Burns, P.Geo., LG, who is designated as a Qualified Person with the ability and authority to verify the authenticity and validity of the data.

About the Pine Point Project

The Pine Point project is an advanced and permitted Pb/Zn project that hosts extensive infrastructure and significant Pb/Zn resources. The project is situated adjacent to a paved road, close to existing hydro facilities, and the existing rail head at Hay River connects directly to the south. A bankable feasibility study was completed in 2008 that identified robust economics. Technical work completed to date has provided confirmation that there has been minimal impact to the capital and operating cost estimates over the last two years. The Company is currently building additional reserves through a program of confirmation diamond drilling.

The Pine Point Mine was the largest and most profitable lead-zinc mine in Canadian history and extracted over 64,259,570 tonnes of ore at a grade of 7.0% zinc and 3.1% lead between 1964 and 1987. The Pine Point Concentrates were sought after by smelters around the world due to their high purity.

About Tamerlane Ventures Inc.

Tamerlane Ventures Inc. is an exploration and development mining company with advanced base metal development projects in Canada and Peru. The Company's immediate focus is bringing the 100%-owned Pine Point project to production. Tamerlane plans to sell the well-known Pine Point Concentrates to various smelting facilities around the world. The Company is also developing its Los Pinos heap leach copper project in Peru.

On behalf of Tamerlane Ventures Inc.

Michael A. Willett, Chief Executive Officer
Antworten
BioLogic:

7

4
01.04.11 19:58
Title: Production start for Pine Point a perfect time, says Tamerlane Ventures
Text:
www.tamerlaneventures.com • 360.752.9462


Mike Willett
CEO

Optimism about continued robust demand for base metals from the world’s biggest consumers, US and China, and predictions of supply shortages are further strengthening Tamerlane Ventures’ (TSXV:TAM) position as a winning proposition. The company is working towards bringing the world-class zinc-lead Pine Point Property back into production in Northwest Territories, Canada, and developing its Los Pinos heap leach copper project in Peru. “Our NWT project is expected to come on line in 2013, just at the time when these base metal shortages begin. Very much like ‘the perfect storm,’ we will enter the market just when the demand for lead and zinc begins to peak,” said company CEO, Mike Willett. He discusses Tamerlane’s core projects and opportunities that will add to shareholder value.


Resource Intelligence: Pine Point is known as the most profitable base-metal mine in Canadian history. Do your findings so far indicate that this mine is going to live up to its impressive past? Give us some numbers.

Mike Willett: There is a an estimated 70 million tonnes of ore-grade material still in the ground, even after mining 64 million tonnes between 1964 to 1987. We have been working at bringing those resources up to NI 43-101 compliance. Currently we have 7.8 million tonnes in reserves and another 10 million tonnes in resources.

RI: What are the benefits of re-mining a past-producing mine?

MW: There are several benefits to the redevelopment of Pine Point. First, the infrastructure is still in place, specifically the surface access to the deposits and the availability of power, which reduces our overall capital costs. Second, our testing indicates that we will be able to produce the same high-grade concentrates that were produced in the past, which was very well-received by smelters.

RI: What else could you share with us to help investors evaluate the potential of this project?

MW: We are currently building a pipeline of projects at our site. Our initial project covers off six of the 42 deposits that we have. In addition, through an airborne survey completed in 2005, an additional 35 anomalies were identified, which have not been drilled yet.

RI: At what stage is the project now and what`s next to bring it to production stage?

MW: Currently we are working on updating our feasibility study from our 2008 numbers, and finalizing definitive engineering to prepare for the next stage – construction. We are currently raising the funding that will allow construction to commence, which could start as early as the end of this year.

RI: What opportunities do you see in the zinc and lead markets?

MW: Both the zinc and lead markets are heating up. Prices of zinc are in the $1.10 range and lead is in the $1.20 range. These are significant increases from just a year or two ago. We see several of the major zinc mines closing over the next several years, with expected shortages starting to occur in 2013, which is when we expect our project to come on line. Very much like “the perfect storm,” we will enter the market just when the demand for lead and zinc begins to peak.

RI: You’re currently trading around $0.25 a share. Is this a fair valuation of the company?

MW: Prior to the meltdown of 2008/2009, our company was preparing to put the Pine Point Project into construction, and into production. Our share price had hit the $2.93 range. The market cap of Tamerlane at that time was in the range of $180 million. I see no reason why we shouldn’t reach those levels again.

RI: What big news should shareholders and potential investors expect from you next and when would that be?

MW: We are working on one of our deposits, N-204, to bring it up to NI 43-101 compliance. This will add significant resources to our base. We should be able to announce results of our study sometime this month. In addition, we are working diligently at acquiring the financing to get our project rolling, and we are seeing a lot of serious interest.

RI: What value does your company immediately provide to investors?

MW: Our NWT project is one of the few that have permits and agreements in place to start production. Once financing is in place, construction will commence.

RI: How do you plan on showing continued shareholder value for shareholders?

MW: We will continue to work at bringing resources online at our site. In addition, we have our copper property, Los Pinos, which is located in Peru, and plan to focus on that once we get our Pine Point project up and running. As you know, the demand for copper is very strong, and is expected to stay that way in the foreseeable future.

RI: Where do you see Tamerlane over the next three to five years?

MW: We’ll see our Pine Point project commence production and our additional deposits will provide an inventory to continue that production far into the future. Our production levels of lead and zinc will place us as a mid-tier base metal producer, here in Canada.

RI: As an investor, give me three reasons I should take a close look at Tamerlane.

MW: We have a very experienced team that has put numerous properties into production and have operated them successfully; our share structure is tight, with only 66 million shares issued; and our property in NWT has tremendous upside potential with an additional 36 deposits in the ground.

Investor Highlights:

   * Resource defined, permitted
   * Significant Zn and Pb reserves and resources
   * Additional exploration upside potential
   * Proven management team
   * 100% owned project located in mining-friendly jurisdiction


peace
Posts sind keine Empfehlung zum Kauf oder Verkauf.
Alle Posts stellen nur meine eigene Meinung dar.
Antworten
Alfgolf2:

Konstruktion weiter vorangetrieben !!

 
13.04.11 17:52
app.quotemedia.com/quotetools/...cp=off&webmasterId=101020

wir stabilisieren uns bis zum nächsten Ausbruch !!
Nur wer an sich glaubt, kann anderen helfen, an sich zu glauben.
Antworten
madold:

Stop-Loss in Kanada ...

3
18.04.11 20:05
Heute hätte man sein Körbchen ganz weit unten aufstellen sollen: Stopp-Loss-Kette in Kanada führte zu kurzfristigem Einbruch um fast 25%. Schade, verpasst.
Tamerlane Ventures - Finanzierung steht! 396678
Antworten
BioLogic:

Sammeln?

4
20.04.11 00:10
sammeln ist angesagt, denn ab 2012 wird es hier kontinuirlich steigen. Absehbar

LG
Posts sind keine Empfehlung zum Kauf oder Verkauf.
Alle Posts stellen nur meine eigene Meinung dar.
Antworten
BioLogic:

Mine life

4
20.04.11 00:20
wurden 8 Jahre angegeben, mit den neusten Drilling updates werden es ungefähr 13 oder 14 Jahre sein, obacht die Proberty ist noch gerademal zu 15 % exploriert also auch hier Potential vorhanden. Und alles genehmigt ;)

TSX VENTURE: TAM
Tamerlane Ventures Inc.
Mar 17, 2011 15:16 ET
Tamerlane Plans to Expand Resources at Pine Point Lead-Zinc Project

BELLINGHAM, WASHINGTON--(Marketwire - March 17, 2011) -

NOT FOR DISTRIBUTION TO U.S. NEWSWIRE SERVICES OR FOR DISSEMINATION IN THE UNITED STATES. ANY FAILURE TO COMPLY WITH THIS RESTRICTION MAY CONSTITUTE A VIOLATION OF U.S. SECURITIES LAW.

Tamerlane Ventures Inc. ("Tamerlane" or "the Company") (TSX VENTURE:TAM) announced today that it is commencing a confirmation diamond drilling program on the W-85 deposit at the Company's 100%-owned Pine Point lead-zinc project, located in the Northwest Territories, Canada. As a result of historical drilling and preliminary modeling, it has been determined that this deposit may be mined by surface mining methods. The results of the drilling are expected to expand the existing resources at Pine Point.

The existing historical resource* on W-85 is as follows:
Tonnes Lead % Zinc %
3,760,000 2.3 4.0

The purpose of this program is to convert historical W-85 resources into National Instrument ("NI") 43-101-compliant reserves and provide enough samples to process the rock through the R-190 flowsheet, which includes dense media separation. The new drill program will consist of approximately 10 diamond drill holes totaling up to 1,307 meters. This drill program will enable the W-85 deposit to be added to the current mineral inventory, which is detailed below. Drilling is expected to continue through mid-July, 2011, and the results of this drilling program are expected to be published by year-end 2011. The Company has contracted with ProCore Drilling of Hay River, Northwest Territories to complete the drill program.

Pine Point Mineral Inventory**
Category Tonnes Lead % Zinc %
Underground Proven & Probable** 7,790,271 3.01 6.16
Measured & Indicated 8,030,000 1.13 2.26
Open Pit (N204) Indicated 9,166,000 0.92 3.42
Inferred 2,413,000 0.86 3.04

**The Pine Point Property was the subject of a completed National Instrument 43-101 report (NI 43-101). The reserve and resource technical report was prepared by Pincock, Allen and Holt (PAH) July 30, 2008. The report is named "NI 43-101 Technical Report Update Pine Point Project Northwest Territories Canada". The reserve is based on the mining of the following deposits: P-190, P-499, O-556, X-25, Z-155, and G-03. The open pit resources are based on a 43-101 report prepared by PAH on the N-204 deposit.

Remaining Historical Resources*
(including W-85)
(Non NI 43-101 Compliant) Tonnes Lead % Zinc %
Total Remaining Historical Resource 34,221,000 1.4 4.4

*The historical estimates presented above are not in accordance with the mineral resources or mineral reserves classifications contained in the CIM Definition Standards on Mineral Resources and Mineral Reserves, as required by National Instrument 43-101 ("NI 43-101"). Accordingly, the company is not treating these historical estimates as current mineral resources or mineral reserves as defined in NI 43-101 and such historical estimates should not be relied upon. A qualified person has not done sufficient work to date to classify the historical estimates as current mineral resources or mineral reserves.

The existing Pine Point project currently has approximately nine years of reserves. The upgrading of N-204 to reserve by mid-summer and the upgrading of W-85 to reserve by late this year would result in a reserve that will support a 15-year mine life. This would still leave a significant amount of historical resource that can be upgraded for additional mine life. The objective in expending current funds to upgrade the historical resource is to extend the mine life of the project to a level where the project will support conventional long-term bank debt. It is envisioned that the existing US$60 million bridge loan which the company is currently negotiating will be repaid with conventional, lower-interest bank lending once the project is up and running. Having a greater-than-15-year mine life is expected to allow the Company to negotiate more favorable terms for future financing packages.

Mike Willett, CEO of Tamerlane Ventures, commented, "We plan to build Tamerlane into a mid-tier company, and to do this we need long-life projects. The combination of a long-life reserve coupled with the modest amount of capital expenditure to get the project into production results in Tamerlane being an attractive base metal exploration/development company. As we advance toward building the mine and the processing facility, we expect to continue converting historical resources into reserves, further strengthening the project."

Mr. Willett continued, "In addition, we also have 35 geophysical anomalies that have been identified since we acquired the property, but which have not yet been tested. Our plan is to move forward with an exploration program to test several of these anomalies."

The information in this press release was prepared under the guidance of Mr. Ross F. Burns, P.Geo., LG, who is designated as a Qualified Person with the ability and authority to verify the authenticity and validity of the data.

About the Pine Point Project

The Pine Point project is an advanced and permitted Pb/Zn project that hosts extensive infrastructure and significant Pb/Zn resources. The project is situated adjacent to a paved road, close to existing hydro facilities, and the existing rail head at Hay River connects directly to the south. A bankable feasibility study was completed in 2008 that identified robust economics. Technical work completed to date has provided confirmation that there has been minimal impact to the capital and operating cost estimates over the last two years. The Company is currently building additional reserves through a program of confirmation diamond drilling.

The Pine Point Mine was the largest and most profitable lead-zinc mine in Canadian history and extracted over 64,259,570 tonnes of ore at a grade of 7.0% zinc and 3.1% lead between 1964 and 1987. The Pine Point Concentrates were sought after by smelters around the world due to their high purity.

About Tamerlane Ventures Inc.

Tamerlane Ventures Inc. is an exploration and development mining company with advanced base metal development projects in Canada and Peru. The Company's immediate focus is bringing the 100%-owned Pine Point project to production. Tamerlane plans to sell the well-known Pine Point Concentrates to various smelting facilities around the world. The Company is also developing its Los Pinos heap leach copper project in Peru.

On behalf of Tamerlane Ventures Inc.

Michael A. Willett, Chief Executive Officer

Caution Concerning Forward-Looking Information

This press release contains forward-looking information within the meaning of applicable securities laws. We use words such as "may", "will", "should", "anticipate", "plan", "expect", "believe", "estimate" and similar terminology to identify forward-looking information. It is based on assumptions, estimates, opinions and analysis made by management in light of its experience, current conditions and its expectations of future developments, as well as other factors which it believes to be reasonable and relevant. Forward-looking information involves known and unknown risks, uncertainties and other factors that may cause our actual results to differ materially from those expressed or implied in the forward-looking statements and, accordingly, readers should not place undue reliance on those statements. Risks and uncertainties that may cause actual results to vary include, but are not limited to, the speculative nature of mineral exploration and development, including the uncertainty of reserve and resource estimates; operational and technical difficulties; the availability to the Company of suitable financing alternatives; fluctuations in zinc, lead and other resource prices; changes to and compliance with applicable laws and regulations, including environmental laws and obtaining requisite permits; political, economic and other risks arising from our activities; fluctuations in foreign exchange rates; as well as other risks and uncertainties which are more fully described in our annual and quarterly Management's Discussion and Analysis and in other filings made by us with Canadian securities regulatory authorities and available at www.sedar.com.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

For more information, please contact
Tamerlane Ventures Inc.
Gregg Sloate
Director of Investor Relations and Corporate Communications
(360) 752-9462
(360) 752-9463 (FAX)
gsloate@tamerlaneventures.com
www.tamerlaneventures.com
Click here to see all recent news from this company

Privacy Statement | Sitemap |© 2011 Marketwire, Incorporated. All rights reserved.
Your newswire of choice for expert news release distribution.
1-800-774-9473 (US) | 1-888-299-0338 (Canada) | +44-20-7562-6550 (UK)

Posts sind keine Empfehlung zum Kauf oder Verkauf.
Alle Posts stellen nur meine eigene Meinung dar.
Antworten
madold:

Leitzins bleibt, BIP geringer, Inflation höher

4
27.04.11 21:48
Der Tamerlane-Chart scheint Bernanke zuzuwinken. Steiler Anstieg, alles wird gut ...

www.finanzen.net/nachricht/aktien/...ationserwartungen-1108202
Tamerlane Ventures - Finanzierung steht! 398419
Antworten
Mr. Dino:

Financial Results 2010

2
04.05.11 21:45
Am 29.4.2011 hat Tamerlane seinen Finanzreport veröffentlicht. Aus meiner Sicht sehen die Zahlen recht positiv aus. PINE POINT und LOS PINOS sind auf die Beine gestellt worden, Bohrprogramm in Kanada wird in geologisch vielversprechende Schichten abgetäuft und wie geplant durchgeführt. Prioritäten im Aufbau der Pine Point Mine sind gesetzt. Aus meiner Sicht ein völlig unterbewertetes Unternehmen mit sehr (!) viel Potential und einen strukturiert arbeitendem Management. Die derzeit (wieder) niedrigen Kurse sollte man nutzen!!!




Tamerlane Reports Financial Results for Year 2010
Friday, April 29, 2011

NOT FOR DISTRIBUTION TO U.S. NEWSWIRE SERVICES OR FOR DISSEMINATION IN THE UNITED STATES.  ANY FAILURE TO COMPLY WITH THIS RESTRICTION MAY CONSTITUTE A VIOLATION OF U.S. SECURITIES LAW.

BELLINGHAM, Wash., USA – Tamerlane Ventures Inc. ("Tamerlane" or “the Company") (TSX-V: TAM) announces a net loss of $1,446,692 or $0.02 per share for the year ended December 31, 2010, compared to a net loss of $1,156,808 or $0.02 per share for the prior year.

At December 31, 2010 the Company had working capital of $4,158,219 compared to $1,306,399 at December 31, 2009, an increase of $2,851,820.

On April 18, 2011, the Company received $2,151,749 in cash proceeds from the exercise of substantially all warrants from a December 2009 private placement of units. Exercised warrants in April 2011 totaled 7,705,553 at an average price of $0.28, out of 7,765,553 warrants outstanding from this financing; 320,000 warrants from the same private placement had been exercised previously, in October 2010.

In addition, there were 195,000 shares issued in March and April of this year pursuant to the exercise of employee stock options for cash proceeds of $35,000. As of April 29, 2011 the Company had 74,243,426 common shares issued and outstanding. In addition, there are 1,812,571 shares remaining reserved for issuance for the exercise of warrants, and 5,270,000 shares reserved for issuance for exercise of stock options. Exercise of all outstanding stock options and warrants would result in approximately $2.63 million being added to the Company’s treasury. If all warrants and options were exercised and there is an exercise of conversion rights for the 3,142,500 shares pursuant to the convertible debenture, there would be 84,468,497 shares outstanding on a fully diluted basis.

About Tamerlane Ventures Inc.

Tamerlane Ventures Inc. is an exploration and development mining company with advanced base metal development projects in Canada and Peru. The Company’s immediate focus is bringing the 100%-owned Pine Point project to production. The Company is currently in the financing phase and expects to commence construction this fall. Tamerlane plans to sell the well-known Pine Point Concentrates to various smelting facilities around the world. The Company is also developing its Los Pinos heap leach copper project in Peru.

On behalf of Tamerlane Ventures Inc.

“Michael A. Willett”

Chief Executive Officer
Antworten
BioLogic:

# 23

2
04.05.11 21:58
Dem ist nichts hinzuzufügen ^^ :D

Immer dran denken Mitte 2012 Anlagehorizont, dann eventuelle Teilentnahme ;)

lg
Posts sind keine Empfehlung zum Kauf oder Verkauf.
Alle Posts stellen nur meine eigene Meinung dar.
Antworten
BrickoInvest:

Guter Thread...

2
09.05.11 18:50
Hallo Zusammen.
Bin vor kurzem über den Thread gestolpert und habe mich daraufhin auch ein bisschen weiter mit Tamerlane beschäftigt.

Hätte noch ein paar offene Fragen:
Die Finanzierung steht doch, anders wie im Thread-Titel angekündigt, noch lange nicht!
Es wurde nur in einem 1. Schritt eine "Absichtserklärung" über eine Brückenfinanzierung über 60 Mio. Dollar abgeschlossen.
Dazu wird noch eine EK-Finanzierung über 25Mio. erwartet und weitere Verträge über 50Mio. Dollar (siehe Grafik) müssen abgeschlossen werden.
Vor allem die ungewisse EK-Finanzierung hält mich derzeit noch von einem Invest ab.
Bei einer aktuellen Market-Cap von 23 Mio. Dollar und einer geplanten KE um 25 Mio. Dollar wird die Aktie vermutlich stark verwässert werden.
Gibts hier schon News, ob ein strategischer Investor mit ins Boot geholt werden soll oder ob die Altaktionäre über Bezugsrechte beteiligt werden sollen?

Und zum Thema Zeitplan/Produktionsbeginn:
Mit der Bestellung der long-lead items und der Konstruktion kann ja erst begonnen werden, wenn die komplette Finanzierung abgeschlossen ist.
Dies kann meiner kurzen Einschätzung nach auch noch durchaus bis in den Herbst dauern. Dann rechen wir mal mit 24 Monaten Konstruktionszeit und anschließender Produktionsaufnahme.
Dann würde man ab Mitte-Ende 2013 mit der Produktion starten.

Bis dahin ist es noch eine ganze Weile und es müssen noch sehr wichtige offene Fragen geklärt werden.
Vor allem die Finanzierung muss erstmal stehen, dann wird schonmal erhebliches Risiko aus der Aktie genommen.

@#23, Biologic: Was meist du mit "Anlagehorizont Mitte 2012"?
Was erwartest du in dieser Zeit bzw. gibts einen speziellen Grund dafür, bis dahin mit starken Kurssteigerungen zu rechnen?

PS: Bin schon auf ein paar Threads von euch "Explorer Timelinern" aufmerksam geworden, ihr macht wirklich gute Arbeit!
(Verkleinert auf 72%) vergrößern
Tamerlane Ventures - Finanzierung steht! 401586
~   Success is a journey...not a destination!   ~
Antworten
Alfgolf2:

ich versuchs mal kurz

4
09.05.11 19:38
die Gesamtkosten betragen richtig 135M $.....die Hälfte ca. ist in der Kasse...

den restlichen Großteil ist man in Verhandlung mit Abnehmern über das sogenannte Hedging....ist zur Zeit vom Vorteil, da der Kurs für Blei und Zink gerade hoch ist !!

man wird also Vorwärtsverkäufe in Kauf nehmen, was aber nicht das Problem sein müsste !!

dann bleiben noch ca. 30-40M welche man als Kredit oder aber , wie Du sagst als KE einnehmen muss, was aber auch nicht das Problem sein kann, BEI DEM METALLWERT IM BODEN !!

und, man muss sagen das ja noch nicht soviele Aktien vorhanden sind.....falls KE dann immer noch im gesunden Rahmen.....PS: wenn ich da an Lynas oder so denke mit ihren Millarden Aktien.....

FALSS, das Hedging erreicht wird, sollte der zweite Punkt kein Ding sein !!!

FALLS2, das Hedging eintrifft, wird der Kurs in die Höhe schnellen-----dann müssen auch weniger Aktien ausgegeben werden:)

Du siehst es, du kannst es drehen wie Du willst, es wird seinen Gang gehen....

PS2: Ich kann nicht für BIO reden, aber er meint mit Mitte 2012, das alles soweit durch ist und die Mine gebaut wird und die Aktie schon ganz gut gestiegen sein wird.......dann kann man verkaufen, falls man Geld braucht....

Ich warte bis 2013 und nehme lieber noch 100% mehr mit....aber Bio hat ja dann auch schon wieder genug Rendite gemacht:))

Gruss...ich hoffe ich konnte ein wenig helfen:)
Nur wer an sich glaubt, kann anderen helfen, an sich zu glauben.
Antworten
BrickoInvest:

@Alfgolf2

5
09.05.11 21:46
Danke für deine Antwort.

Ich habe auch keinesfalls vor, das Invest schlecht zu reden.

Mir geht es vielmehr darum, die zukünftigen Entwicklungen (z.B. KE) so präzise wie möglich vorher erahnen zu können, um meinen Einstieg möglichst perfekt zu timen. ;-)

Bei Explorern und vor allem auch bei Werten in der Entwicklungsphase gibt es nun mal Phasen die sich im Nachhinein immer als besonders günstige Einstiegszeitpunkte herausstellen. Und so verhält es sich meiner Meinung nach mit dem Zeitpunkt während und kurz nach Ankündigung der letzten Kapitalerhöhung und somit dem Abschluss der endgültigen Finanzierung vor Aufnahme der Konstruktion der Mine.

Wohl oder übel wird Tamerlane wohl noch etwa 25 Mio. Dollar über Ausgabe neuer Aktien einnehmen. Das gibt man ja so in der jüngsten Präsentation an und normalerweise veröffentlicht man dort nicht gerade höhere Zahlen als nötig, denn so könnte man Investoren nur abschrecken.
Hierzu stimmt natürlich was du sagst Alfgolf2, dass Tamerlane bisher eine sehr tighte Share Structure vorweisen kann.

Das sich für das Aktienpaket Investoren finden werden, ist für mich keine Frage.
Die Frage ist viel mehr, zu welchem Preis diese Investoren ihre Aktien erhalten.
Institutionelle Investoren wollen natürlich möglichst günstig rein und ich hoffe, dass das Management von Tameral sich da nicht über den Tisch ziehen lässt.
Viel besser noch wäre es meiner Meinung nach, wenn die neuen Aktien schon an langfristig orientierte Abnehmer und Partner ausgegeben werden könnten.

Oder man ermöglicht eben den Altaktionären über Bezugsrechte die Teilnahme an der KE...und dann geht der Kurs eben oft auf KE-Kurs zurück!

Man sieht, es ergeben sich noch viele Möglichkeiten.

Und meiner Meinung nach ist das Wichtigste bei langfristigen Invests ein günstiger Einstiegskurs!

Habe der IR Heute auch nochmal ne Mail geschrieben, ob es schon weitere Pläne hierzu gibt oder Verhandlungen mit strategischen Investoren.
Wenn ich ne Antwort auf meine Fragen bekomme, stelle ich sie natürlich gerne ein.

Werd´s wohl so handhaben, dass ich mir die nächsten Tage schonmal ne 1. Position hole und nach und nach bei günstiger Gelegenheit auftstocke.

Viel Glück Allen!

~   Success is a journey...not a destination!   ~
Antworten
Alfgolf2:

also das es so weit runter geht hätte ich nicht

2
18.05.11 15:11
gedacht.....

Mmmhhh....vielleicht Nachkauf??
Nur wer an sich glaubt, kann anderen helfen, an sich zu glauben.
Antworten
madold:

Zumindest verkauft keiner mehr ...

3
18.05.11 17:24
... der Handel ist zum Erliegen gekommen. Selbst in Kanada geht zur Zeit nichts, alle warten auf bessere Zeiten. Natürlich könnte man auch aktiv ins Geschehen eingreifen, doch leider, lieber Alfgolf, trifft einen die Idee mit dem Nachkauf meist unvorbereitet. Der Sommer ist noch lang ;-))
Antworten
Alfgolf2:

richtig Madold

2
18.05.11 18:02
der Witz ist ja auch...RT will einer nur 1k abgeben?!

dafür setz ich mich noch nicht mal an den PC.....

Tam muss mal wieder eine kleine News( vielleicht die Big News ) raushauen zur weiteren Finanzierung und dann gehts auch wider in die richtige Richtung....wird schon.....

habe ich 0 Bedenken, wie Marc so schön sagte......

Gruss

@Brickoinvest................und schon drin??
Nur wer an sich glaubt, kann anderen helfen, an sich zu glauben.
Antworten
BioLogic:

Ich bekomme

2
18.05.11 18:19
schwitzige BUY Knopf Hände :D

mensch, das ich das noch erleben darf .... dieseer PReis ist ein Traum

Posts sind keine Empfehlung zum Kauf oder Verkauf.
Alle Posts stellen nur meine eigene Meinung dar.
Antworten
Mr. Dino:

Kurze Info: Aktuelle Firmenpräsentation als PDF

3
18.05.11 23:18
Kurze Info: Die aktuelle Präsentation von Tamerlane (Stand Mai '11) steht seit einigen Tagen auf der Homepage von Tamerlane zum download (PDF) bereit.
Antworten
Mr. Dino:

Neue NEWS zum Bohrprogramm :)

4
18.05.11 23:31
Tamerlane hat ein neues Update zur Pine Point Mine eingestellt. 10 Bohrungen sollen abgetäuft werden. Abbau der Erze im Tagebau möglich.


Tamerlane Plans to Expand Resources at Pine Point Lead-Zinc Project
Thursday, March 17, 2011

NOT FOR DISTRIBUTION TO U.S. NEWSWIRE SERVICES OR FOR DISSEMINATION IN THE UNITED STATES.  ANY FAILURE TO COMPLY WITH THIS RESTRICTION MAY CONSTITUTE A VIOLATION OF U.S. SECURITIES LAW.

BELLINGHAM, Wash., USA – Tamerlane Ventures Inc. ("Tamerlane" or “the Company") (TSX-V: TAM) announced today that it is commencing a confirmation diamond drilling program on the W-85 deposit at the Company’s 100%-owned Pine Point lead-zinc project, located in the Northwest Territories, Canada. As a result of historical drilling and preliminary modeling, it has been determined that this deposit may be mined by surface mining methods. The results of the drilling are expected to expand the existing resources at Pine Point.

The existing historical resource* on W-85 is as follows:
Tonnes Lead % Zinc %
3,760,000   2.3 4.0

The purpose of this program is to convert historical W-85 resources into National Instrument (“NI”) 43-101-compliant reserves and provide enough samples to process the rock through the R-190 flowsheet, which includes dense media separation. The new drill program will consist of approximately 10 diamond drill holes totaling up to 1,307 meters. This drill program will enable the W-85 deposit to be added to the current mineral inventory, which is detailed below. Drilling is expected to continue through mid-July, 2011, and the results of this drilling program are expected to be published by year-end 2011. The Company has contracted with ProCore Drilling of Hay River, Northwest Territories to complete the drill program.


Pine Point Mineral Inventory**


          §Category Tonnes Lead % Zinc %
Underground Proven & Probable** 7,790,271 3.01 6.16

          §Measured & Indicated 8,030,000 1.13 2.26
Open Pit (N204) Indicated 9,166,000 0.92 3.42
          §Inferred 2,413,000 0.86 3.04

**The Pine Point Property was the subject of a completed National Instrument 43-101 report (NI 43-101). The reserve and resource technical report was prepared by Pincock, Allen and Holt (PAH) July 30, 2008. The report is named “NI 43-101 Technical Report Update Pine Point Project Northwest Territories Canada”. The reserve is based on the mining of the following deposits: P-190, P-499, O-556, X-25, Z-155, and G-03. The open pit resources are based on a 43-101 report prepared by PAH on the N-204 deposit.

Remaining Historical Resources*

(including W-85)

(Non NI 43-101 Compliant) Tonnes Lead % Zinc %
Total Remaining Historical Resource 34,221,000 1.4 4.4

*The historical estimates presented above are not in accordance with the mineral resources or mineral reserves classifications contained in the CIM Definition Standards on Mineral Resources and Mineral Reserves, as required by National Instrument 43-101 ("NI 43-101"). Accordingly, the company is not treating these historical estimates as current mineral resources or mineral reserves as defined in NI 43-101 and such historical estimates should not be relied upon. A qualified person has not done sufficient work to date to classify the historical estimates as current mineral resources or mineral reserves.

The existing Pine Point project currently has approximately nine years of reserves. The upgrading of N-204 to reserve by mid-summer and the upgrading of W-85 to reserve by late this year would result in a reserve that will support a 15-year mine life. This would still leave a significant amount of historical resource that can be upgraded for additional mine life. The objective in expending current funds to upgrade the historical resource is to extend the mine life of the project to a level where the project will support conventional long-term bank debt. It is envisioned that the existing US$60 million bridge loan which the company is currently negotiating will be repaid with conventional, lower-interest bank lending once the project is up and running. Having a greater-than-15-year mine life is expected to allow the Company to negotiate more favorable terms for future financing packages.

Mike Willett, CEO of Tamerlane Ventures, commented, “We plan to build Tamerlane into a mid-tier company, and to do this we need long-life projects. The combination of a long-life reserve coupled with the modest amount of capital expenditure to get the project into production results in Tamerlane being an attractive base metal exploration/development company. As we advance toward building the mine and the processing facility, we expect to continue converting historical resources into reserves, further strengthening the project.”

Mr. Willett continued, “In addition, we also have 35 geophysical anomalies that have been identified since we acquired the property, but which have not yet been tested. Our plan is to move forward with an exploration program to test several of these anomalies.”

The information in this press release was prepared under the guidance of Mr. Ross F. Burns, P.Geo., LG, who is designated as a Qualified Person with the ability and authority to verify the authenticity and validity of the data.

About the Pine Point Project
The Pine Point project is an advanced and permitted Pb/Zn project that hosts extensive infrastructure and significant Pb/Zn resources. The project is situated adjacent to a paved road, close to existing hydro facilities, and the existing rail head at Hay River connects directly to the south. A bankable feasibility study was completed in 2008 that identified robust economics. Technical work completed to date has provided confirmation that there has been minimal impact to the capital and operating cost estimates over the last two years. The Company is currently building additional reserves through a program of confirmation diamond drilling.

The Pine Point Mine was the largest and most profitable lead-zinc mine in Canadian history and extracted over 64,259,570 tonnes of ore at a grade of 7.0% zinc and 3.1% lead between 1964 and 1987. The Pine Point Concentrates were sought after by smelters around the world due to their high purity.


On behalf of Tamerlane Ventures Inc.

“Michael A. Willett”

Chief Executive Officer
Antworten
madold:

Service: Hier die passenden Links

3
18.05.11 23:33
Firmenpräsentation
www.tamerlaneventures.com/images/pdf/...sentation_May_2011.pdf

März 2011: Facts Sheet
www.tamerlaneventures.com/images/pdf/TAM-factsheet-Mar3-web.pdf

Die Homepage selbst, da könnt Ihr mal die "Chefin" Peggy Kent sehn. Gibt es nicht allzu oft, dass ein Explorer einen weiblichen CEO hat.
www.tamerlaneventures.com/
Antworten
BioLogic:

Hey Timeliner

5
19.05.11 05:31
Es wird immer mehr Metall und daher auch kein Problem die restliche Finanzierung durchzuekommen. Ziel des MM ist ganz klar die Produktion. Um den. Rest zu finanzieren machen sie mit den Resourcenerweiterungen das Projekt attraktiver.

Es ist wie es ist,

Permitted
Geringe kosten für Infrastruktur, da vorhanden
Teils Open Pit Möglichkeit
Minelife wird langer
Für Explorer in diesem Status geringe aktienanzahl


LG
Marc
Posts sind keine Empfehlung zum Kauf oder Verkauf.
Alle Posts stellen nur meine eigene Meinung dar.
Antworten
BrickoInvest:

so jetzt bin ich auch dabei...

3
20.05.11 00:36
hab mir ne 1. Position an der TSX-V geholt.
Da wird man ja zur Zeit noch schön ins Bid bedient...

Schade find ich, dass man Tamerlane in Deutschland nur sehr begrenzt handeln kann...die Spreads sind so extrem, dass man den Anschein hat, dass die MarketMaker an den Börsen in FFM und Berlin nicht handeln wollen.
Und in Stuttgart ist man wohl offensichtlich nicht gelistet...das sind dort oft die Einzigen, die aktiv in Canada covern, d.h. Kauforders in etwa zu Pari ausführen und sich die Shares dazu in Kanada holen und dementsprechend bessere Kurse bieten.

Aber was solls, ich handel auch zur Not in Kanada.

@BioLogic:
Na lass doch deine Hände noch ein bisschen schwitzen und drück den Buy-Knopf nicht zu früh, ich will noch ein paar weitere billige Shares abstauben ;-)
Spaß beiseite, ich wünsche euch natürlich allen attraktive Einstiegs- und Austrockungskurse!
~   Success is a journey...not a destination!   ~
Antworten
BrickoInvest:

Aufstockungskurse natürlich!

3
20.05.11 00:37
da ging wohl schon die Müdigkeit mit mir durch ;-)
~   Success is a journey...not a destination!   ~
Antworten
BioLogic:

;)

3
20.05.11 08:58
Bricko ;)

Ich hoffe mal nicht auf Austrocknung ... Das wäre ein schlechtes Invest ^^

Es soll wachsen und gedeien!

Ich denke wir bekommen nochmal die Chance aufzustocken, aber mehr als 0,25 $ bezahl ich nicht, bin geizig

LG
Und viel Glück
Posts sind keine Empfehlung zum Kauf oder Verkauf.
Alle Posts stellen nur meine eigene Meinung dar.
Antworten
BioLogic:

hey Gemeinde

5
22.05.11 16:17
Aus dem stockhouseboard von elitespooner,

LG
Marc

the Supply and offtake agreeements will be key. ...

March 2010 ..."Tamerlane has a bankable feasibility study on the current reserves, which indicates a robust internal rate of return in excess of 50% at current metal prices."

If anyone is concerned with the US Dollar,

.."forecasts total operating costs per pound of zinc to be US
.49, down from the previously announced estimate of
.67 per pound."

Also,

... "We expect to complete metallurgical testing on the mineralization to determine its upgradability utilizing the dense media separation (DMS) process. At Tamerlane’s R190 deposit, for example, the low grade mineralization showed an approximate tenfold increase in grade when using the DMS process.....”

I dont speculate on short term prices and think that the correction we've seen is/was expected.

2008

"The zinc and lead prices used were based on 60% historical prices plus 40% future LME prices. However, the price of zinc was downgraded from this estimate from $1.28 per pound to $1.14 per pound and lead was calculated at $1.16 per pound. Tamerlane chose to use a lower zinc price than was calculated due primarily to the zinc market futures outlook stabilizing while lead price expectations show an increase."


As for the previous poster looking at the presentation with regard to financing,

... "The objective in expending current funds to upgrade the historical resource is to extend the mine life of the project to a level where the project will support conventional long-term bank debt. It is envisioned that the existing US$60 million bridge loan which the company is currently negotiating will be repaid with conventional, lower-interest bank lending once the project is up and running. Having a greater-than-15-year mine life is expected to allow the Company to negotiate more favorable terms for future financing packages."

What I found interesting on the presentation was pg.22 the valuation comparison of properties. We have twice the amount of ore, roughly accounting for what 5-7 billion, anyone tell me what our market cap is right now ??

Not including the copper asset and this isnt a strong buy ??

Posts sind keine Empfehlung zum Kauf oder Verkauf.
Alle Posts stellen nur meine eigene Meinung dar.
Antworten
BioLogic:

Hallo liebe Tamler;)

4
14.06.11 23:50
Ich habe der Timeline vor geraumer Zeit was über Tamerlane geschrieben.

Den Investoren oder Lesern von diesem Thread möchte ich das natürlich nicht vorenthalten.

Vorab sei gesagt es sind meine Gedanken gePaart mit Fakten aus den Unternehmensberichten aber ebenso Einschätzungen der Banken zum Zincmarkt.

Ich finde Tamerlane steht wirklich da wie Stans letztes Jahr und dort waren es mal eben knapp 400- 500 Prozent für die, die in der Timeline sind.

Das Projekt gefällt mir immer besser. Tamerlane steht da, wie Stans letztes Jahr...das freut mich und vor allem das Kupfer Projekt, was dann von ganz alleine finanziert werden kann ohne Verwässerung, wenn das mit der Zinc Mine alles geklappt hat ;D . Auf Sicht von 5 Jahren, ohne dass die Welt untergeht sind halt einfach mal locker $5 drin. Ohne Chrash ohne neue Währung ... etc :D :D  Der IRR (internal rate of return) liegt bei 50% ! Bei derzeitigen steigenden Preisen kann diese nur noch verbessert werden. Die Produktionskosten sind gefallen:

"forecasts total operating costs per pound of zinc to be US
.49, down from the previously announced estimate of
.67 per pound."

Die Aktie ist kaum bekannt.....

Ich erwarte nun bald supply und offtake agreements. Grund wird die Zinc / Blei Knappheit 2013 sein wo einige Minen die längste LOM erreicht haben.

Ich für meinen Teil kann es nicht fassen, dass es Tamerlane gerade zu den Preisen gibt es ist alles permitted und sehr gutes Explorationspotential vorhanden. Finanziert ist die Hälfte und es sind wenige Aktien für einen Explorer im Minedevelopment ausstehend.

Die Grade können mit DMS (produktionsmethode) erhöht werden:

Also,

... "We expect to complete metallurgical testing on the mineralization to determine its upgradability utilizing the dense media separation (DMS) process. At Tamerlane’s R190 deposit, for example, the low grade mineralization showed an approximate tenfold increase in grade when using the DMS process.....”

Goldman Sachs rät, kauf Öl, Kupfer und Zinc:

The S&P GSCI Index of commodities gained 1.2 percent, recouping about three-quarters of yesterday’s 1.7 percent slump, as Goldman Sachs suggested buying oil, copper and zinc in a reversal of last month’s call to sell commodities, while Morgan Stanley raised its forecast for Brent crude by 20 percent. Before today, the S&P GSCI gauge had lost 11 percent since April 8, when it reached its highest level since August 2008.
www.bloomberg.com/news/2011-05-24/...l-amid-debt-concerns.html

Zinc wird in einen heftigen Defizit Markt kommen, heißt Nachfrage übersteigt Angebot... auch die BRIC Staaten kommen:

Zinc consumption numbers provided by the international zinc and lead study group over the last couple of months are simply phenomenal and as the presentation below indicates large growth rates could prevail for the next few years sending the zinc market into a hefty deficit beginning 2013 as some mines run out of ore.


If you compare the presentation numbers (mainly brook hunt) and the real data from the ILZSG you see that the main reason why zinc prices are actually sticking closely to the upper part of the cash cost curve is a structural underestimation of growth on the demand side.


When China's galvanizing boom started the growth rates were even more impressive than today, but their overall share of the market was little and Europe+US had negative growth rates, therefore zinc consumption didn't shoot up the way it did in 2010, so far zinc consumption grew by 15% (Jan-Nov).


In 2011 China could become the largest producer of galvanized sheet with a growth rate above 30% in 2010!


nyrstar.com/nyrstar/en/investors/reports/...ics-conference.pdf

www.ilzsg.org/static/statistics.aspx?from=2

Conclution: with only financing remaining we are here dealing with a real investment opportunity. My target this year is C$1.5 and closer to production we're looking at C$3 as the next level.But again that's then only the beginning.

Macht euer eigenes DD, aber für das das Tam noc kaum bekannt ist, finde ich eine sehr sehr gute Chance jetzt nochmal zu diesen Kursen einzusteigen.

Das is kein Gepushe es basiert auf Fakten der Homepage und des Unternehmens.

Wer Zeit hat, viel Spaß mit Tam, ebenso Stans, Western copper, Mindoro, indo mines, Prophecy, Bauxite und den anderen Timeline Werten.

Marc
Posts sind keine Empfehlung zum Kauf oder Verkauf.
Alle Posts stellen nur meine eigene Meinung dar.
Antworten
Alfgolf2:

Super Zusammenfassung BIO

2
15.06.11 19:14
wird jetzt nur noch Zeit das nicht nur Wir das Potenzial erkennen !!??

Die Holzhacker sind langsam auf der richtigen Spur, jedoch brauch es wohl noch die letzte Hürde (die anderen Hälfte) der Finanzierung um zu explodieren !!??

also Augen zu und durch......

wird Zeit das wir uns dann unsere Insel kaufen können !!??

gruss Steffen
Nur wer an sich glaubt, kann anderen helfen, an sich zu glauben.
Antworten
Avalanche:

Peru

5
22.06.11 12:05
Die company presentation ist wirklich spannend, nur mache ich mir Gedanken um Los Pinos, bekanntlicherweise in Peru. Und in Peru gibt es ja durch politische Umschwünge starke Enteignungstendenzen a la Chavez. Das sind natürlich gewisse Risiken für TAM, die mE seit einiger Zeit nach und nach in den Kurs eingepreist werden.

Alle Augen sind natürlich auf Pin Point gerichtet, zum Glück in Kanada, aber irgendwann heißt es dann auch "Butter bei die Fische" in Peru.

Best Grüße
~Ava~
Antworten
Mr. Dino:

Neuer Director of Investor Relations & Corp. Com.

3
30.06.11 14:05
Hier die Meldung vom 27.06.2011... könnte der Grund sein, warum es langsam wieder aufwärts geht ;)

BELLINGHAM, Wash., USA – Tamerlane Ventures Inc. ("Tamerlane" or “the Company") (TSX-V: TAM) announced today that Tom Corcoran has been appointed as Director of Investor Relations and Corporate Communications for the company. Mr. Corcoran will be responsible for all aspects of corporate communications with shareholders, media and all potential investors. With over 20 years of corporate marketing, advertising, and media experience, Mr. Corcoran has exceptional writing, design and branding skills in addition to public speaking and presentation talent.

"Mr. Corcoran is an excellent addition to Tamerlane's team," commented Mike Willett, CEO of Tamerlane Ventures. Mr. Willett continued, "His extensive experience in financial and public markets will be of great value in increasing our Company's exposure to both retail and institutional investors."

Mr. Corcoran graduated in 1989 from Simon Fraser University with an Applied Science degree in Communications. He spent over a decade as a broadcast journalist in both radio and TV, before launching a career in Corporate Communications for public companies involved in mining, specialty materials and nano-technology.

"Tamerlane's Pine Point lead/zinc Project in the N.W.T. is an advanced project and the team assembled for the financing, construction and ultimate production start-up is advancing the project rapidly. My mandate is to augment this management team in unlocking the value of the Project and assist them in broadcasting the robust NAV (Net Asset Valuation) globally. Most notably, the recent acquisition by Belgian zinc smelter/producer Nyrstar of Breakwater Resources for $663 million, clearly illustrates, that base metals such as Zinc (Zn) and Lead (Pb) are deemed ‘core commodities’ and investors need to act accordingly” stated Mr. Corcoran.

As part of Mr. Corcoran’s compensation package and subject to TSX approval, Tamerlane has granted 300,000 incentive stock options to Mr. Corcoran at an exercise price of CAD $0.24 per share. These options are granted for a five-year period, and the grant is subject to vesting provisions in accordance with the rules of the TSX Venture Exchange.
Antworten
Mr. Dino:

... und Kontinuität im Management :)

4
30.06.11 14:09
Und hier die Meldung vom 25.06.2011...
Kontinuität im Management ist immer ein gutes Zeichen!

NOT FOR DISTRIBUTION TO U.S. NEWSWIRE SERVICES OR FOR DISSEMINATION IN THE UNITED STATES. ANY FAILURE TO COMPLY WITH THIS RESTRICTION MAY CONSTITUTE A VIOLATION OF U.S. SECURITIES LAW.

Tamerlane Ventures Inc. ("Tamerlane" or the "Company") (TSX-V: TAM) is pleased to announce the re-election of the following seven Director’s at the company’s AGM, held in Vancouver on June 15, 2011: Dr. Edmond H.P. van Hees, Fredric J. Bracken, J. Cowan McKinney, Eugene Larabie, William J.V. Sheridan, Ross F. Burns and Margaret M. Kent.

Also re-appointed as auditors was the accounting firm of KPMG LLP, Chartered Accountants. The “rolling” Incentive Stock Option Plan was also re-approved.

Tamerlane has 74,243,426 common shares issued and outstanding.  Under the terms of the Company’s "rolling" Incentive Stock Option Plan a maximum of 7,424,343 shares are available to be issued pursuant to the exercise of options at this time.  Subject to the approval of the TSX Venture Exchange, the Company approved the granting of 1,100,000 million stock options to directors and officers of Tamerlane on June 23, 2011.  The stock options are exercisable into common shares of Tamerlane at an exercise price of C$0.24 per share for a period of five years.  Tamerlane’s common shares closed at C$0.24 on the TSX Venture Exchange on June 23, 2011.  Including this grant of 1,100,000 options, a total of 5,920,000 shares have been reserved for issuance pursuant to outstanding option grants.  A further 1,504,343 shares are available for issuance pursuant to future option grants at this time.

About Tamerlane Ventures Inc.
Tamerlane Ventures Inc. is an exploration and development mining company with advanced base metal development projects in Canada and Peru. The Company’s immediate focus is bringing the 100%-owned Pine Point project to production. The Company is currently in the financing phase and expects to commence construction this fall. Tamerlane plans to sell the well-known Pine Point Concentrates to various smelting facilities around the world. The Company also plans to develop its Los Pinos heap leach copper project in Peru.



On behalf of Tamerlane Ventures Inc.

“Michael A. Willett”

Chief Executive Officer
Antworten
Alfgolf2:

News

2
06.07.11 19:05
tmx.quotemedia.com/...le.php?newsid=42734526&qm_symbol=TAM

bissl weiter gedrillt.....

ende des groß angelegten drillings im August....Ergebnisse Mitte September....

Construction DIESES JAHR !!!!!!

ist das ein Wink mit dem Zaunpfahl??

ICH DENKE SCHON !!! STRONG BUY !!!!!!!!!!!!!!!!!!!

GRuss

Nur wer an sich glaubt, kann anderen helfen, an sich zu glauben.
Antworten
Alfgolf2:

oh mann

 
06.07.11 21:38
da muss man echt starke nerven haben....ein tag 10% rauf dann wieder 10% runter.....nerv

es wird echt zeit das sie die Finanzierung durchgeboxt kreigen und das dann die Unsicherheit ein für alle mal raus ist !!!!!!!!!

junge junge

jeden Tag eine meiner Aktien im Sinkflug...ist egal welche

gestern Stans....heute Tam....wer ist es morgen??

trotzdem und genau deswegen...Strong buy !!

Gruss
Nur wer an sich glaubt, kann anderen helfen, an sich zu glauben.
Antworten
PaiMei:

Bekomme im Moment keine ....

3
12.07.11 19:32
Bin daher gespannt, ob meine Order an der TSX-V heute noch ausgeführt wird. Bid wurde nicht bedient, jetzt kaufe ich aus dem ASK.
(Verkleinert auf 44%) vergrößern
Tamerlane Ventures - Finanzierung steht! 419945
Wir leben alle unter dem gleichen Himmel, aber wir haben nicht alle den gleichen Horizont.
Antworten
BioLogic:

Viel Glück

3
12.07.11 19:37
:)

und willkommen :D

LG

Marc
Posts sind keine Empfehlung zum Kauf oder Verkauf.
Alle Posts stellen nur meine eigene Meinung dar.
Antworten
PaiMei:

Bin schon seit ein paar Wochen dabei ...

 
12.07.11 19:51
... da ich hier viel Gutes gelesen habe und den Wert mittlerweile äußerst interessant finde. Ich frage mich, was mit TAM vor etwa 5 Jahren passiert ist? Da sah der Kurs doch etwas anders aus. Wenn die "Story" stimmt, sollte es auch mit dem quasi "etwas" verspäteten rebound funktionieren.
Viele Grüße,
PaiMei
(Verkleinert auf 46%) vergrößern
Tamerlane Ventures - Finanzierung steht! 419949
Wir leben alle unter dem gleichen Himmel, aber wir haben nicht alle den gleichen Horizont.
Antworten
PaiMei:

Order steht immer noch unausgeführt ...

 
12.07.11 21:32
im Orderbuch an der TSX-V. Hat jemand eventuell eine Erklärung dafür? Die Mittagspause ist doch schon längst zu Ende ;-))
Wir leben alle unter dem gleichen Himmel, aber wir haben nicht alle den gleichen Horizont.
Antworten
BioLogic:

Kann mal jemand

4
12.07.11 21:58
diese Verschuldungskrise aufhalten ?

Vll liegt es ja an der ... Nein, ich habe keine Ahnung...

solangsam verläßt mich mein Optimismus... immer ein gutes Zeichen eigentlich, dass man kaufen sollte :D

LG
Marc
Posts sind keine Empfehlung zum Kauf oder Verkauf.
Alle Posts stellen nur meine eigene Meinung dar.
Antworten
PaiMei:

Info zu einem Trading Halt habe ich nicht finden!

 
12.07.11 22:08
können. Versuche es einfach immer 'mal wieder. Viel fehlt mir ohnehin nicht mehr zu meiner gewünschten Investgröße.
Wir leben alle unter dem gleichen Himmel, aber wir haben nicht alle den gleichen Horizont.
Antworten
PaiMei:

So, gerade hat es geklappt!

3
13.07.11 18:23
2'000 Stücke zu 0.28 CAD geordert und für 0.27 CAD bekommen. Dieser Kauf war allerdings in CAN nicht kursrelevant. Derzeit nach wie vor 0.26 CAD. Im Orderbuch tauchte die Transaktion nicht einmal auf, in meinem Depot schon. Sachen gibt's. Darf denn der Kurs nicht steigen? (Bin kein Verschwörungsfanatiker, nur so am Rande). Ich hätte allerdings erwartet, dass der Kurs auf 0.27 CAD (da ich ja aus dem ASK gekauft habe) gesetzt worden wäre ...
Wir leben alle unter dem gleichen Himmel, aber wir haben nicht alle den gleichen Horizont.
Antworten
Alfgolf2:

hättest mal 30 cent gemacht---Geizhals ! :)

3
13.07.11 19:03
dann wäre heute mal was gegangen....schade an so einem tag nicht kräftig mitzusteigen ist wieder mal bitter!
Nur wer an sich glaubt, kann anderen helfen, an sich zu glauben.
Antworten
BioLogic:

Bald gehts los,

2
14.07.11 17:14

freut euch auf das kommende Halbjahr. Meine Meinung und mein Bauchgefühl :D

www.tamerlaneventures.com/index.php/whats-new

 

www.tamerlaneventures.com/images/pdf/PPP-Summer2011-doc.pdf

Quelle: Homepage !

Peace

Posts sind keine Empfehlung zum Kauf oder Verkauf.
Alle Posts stellen nur meine eigene Meinung dar.
Antworten
Alfgolf2:

ICH habe mir auch nochmal die Maipräsi angeschaut

2
14.07.11 18:48
echt prima....

Finanznews müsste bald kommen.....

danach der offtake......

und dann Beginn der Konstruktion......

in der Zwischenzeit drehen wir Däumchen und der Preis für Blei und Zink steigt dann hoffentlich wieder kräftig.....

DD
Nur wer an sich glaubt, kann anderen helfen, an sich zu glauben.
Antworten
BioLogic:

:D

2
14.07.11 18:55
oha mann,

mich deucht ich hab zu wenig Shares :D hihi

....mal sehen, lassen wir erstmal Stans, Indo, Western Copper, MIO und den Rest laufen :D

alles wird gut !!

ja genau
Posts sind keine Empfehlung zum Kauf oder Verkauf.
Alle Posts stellen nur meine eigene Meinung dar.
Antworten
PaiMei:

@Alfgolf2 ... #54

3
14.07.11 19:02
.... ob die 2'000 Stücke, die mir noch zu meiner Wunschposition gefehlt haben, bei einem Kauf von 0.30 CAD etwas gerissen hätten, wage ich zu bezweifeln ;-))

Auf meinen derzeitigen Durchschnittskurs hatte dieser Kauf keinen nennenswerten Einfluß.
Beste Grüße,
PaiMei
Wir leben alle unter dem gleichen Himmel, aber wir haben nicht alle den gleichen Horizont.
Antworten
Alfgolf2:

auf der Präsi

2
14.07.11 19:09
erkennt man die Unterschiede der einzelnen Firmen....

Tam müsste um einiges steigen um gleich zu ziehen....

ich persönlich sehe das Kupferprojekt nur als Sahnehäubchen, aber gerade sowas kann ja auch richtig abgehen...

aber am wichtigsten finde ich das Drillen und Explorieren in den den nächsten 2 Jahren, um das Minenleben deutlich auszuweiten....

Naja, sie planen ja selber ca 30 Jahre---das wäre der Hammer.....

Gruss und Viel Glück uns allen::))
Nur wer an sich glaubt, kann anderen helfen, an sich zu glauben.
Antworten
BioLogic:

Heute

 
15.07.11 18:57
augestockt.

LG
Posts sind keine Empfehlung zum Kauf oder Verkauf.
Alle Posts stellen nur meine eigene Meinung dar.
Antworten
Mr. Dino:

Ganz neue News zu Tamerlane: Finanzierung :)

4
21.07.11 17:28
Finanzierung des Pine Point Projekts geht weiter... die Nachricht, auf die wir alle schon gewartet haben :) Kam gerade per e-mail von Tamerlane...

Viel Glück uns Investierten!!!

Tamerlane Secures Additional Funding to Advance Pine Point: Key Project Equipment Purchased

Tamerlane Ventures Inc. ("Tamerlane" or the "Company") (TSX-V: TAM) is pleased to report, that Renvest Mercantile Bancorp Inc. (“Renvest”), through its Global Resource Fund, the Company’s current lender, has agreed to subscribe for 3,846,154 common shares of equity at C$0.26 per share for a total equity investment of C$1.0 million. This transaction is expected to close on or before July 29, 2011 and is subject to approval by the TSX-Venture Exchange. The private placement of common shares will carry a four month hold period. No finder’s fees will be paid.

Renvest has agreed to subscribe for an additional C$1.0 million and be the lead order in a future equity placement the Company will undertake as part of the larger scale financing the Company is planning to complete later this fall. This tranche of equity is expected to be priced in the context of the market at the time and is expected to be issued at the same price and terms as subscriptions by other investors.

In order to proceed with advancing the Pine Point Project and incurring capital expenditures, Renvest has agreed to advance the second USD$5.0 million tranche of the previously announced US $10.0 million debt deal, which was closed and news released on December 16, 2010. A USD$50,000 extension fee will be paid to the Global Resource Fund to reinstate the facility. The full USD$5.0 million will be available for general corporate working capital, including continuation of development engineering, and for the purchase of long-lead items and equipment available on the secondary market, that can be purchased at deep discount to the prices used in the feasibility study. All other conditions on the Company’s ability to draw on the second USD$5.0 million tranche remain the same. The Company anticipates drawing USD$2.5 million of these funds by month end.

Tamerlane has entered into a binding agreement with a court ordered interim receiver for the purchase of a new, never-used, complete C$900,000 flotation equipment package at a considerable discount to current market prices. This flotation equipment will form a key piece of the processing and production facility at the Tamerlane R-190 Deposit at the Pine Point property. In advancing the project, the Company anticipates that the purchase of this processing equipment will close within 30 days and funds from the second tranche of the Renvest debt facility will be used for the purchase.

Tamerlane CEO Michael Willett commented: “We are extremely pleased that Renvest has chosen to participate in this project, not only as our lender, but now as an equity investor. This arrangement has allowed us to continue to advance the Pine Point Project with an opportunistic purchase of the flotation equipment.

This deal paves the way to implement the construction of the project leading to production on schedule, while we continuously look at ways to minimize the capital cost of the project. Tamerlane continues to advance all facets of the project financing, including the existing USD$60 million debt financing, the equipment leasing package, equity funding and off-take / metal streaming agreements. We are in advanced stage discussions with multiple financing providers on various term sheets. Renvest has a good understanding of the project and it’s their continued support that will benefit all shareholders.”
Antworten
Alfgolf2:

naja ein Anfang:)

2
21.07.11 17:40
reicht aber noch nicht ganz:)

aber wird schon...Blei und Zink steigen weiter....

gut so-...gruss
Nur wer an sich glaubt, kann anderen helfen, an sich zu glauben.
Antworten
Schabo04:

Hallo Zusammen

3
21.07.11 17:44
bin dann auch mal dabei, ihr macht es mir ja nicht leicht :-)

LG Marcel
Antworten
Alfgolf2:

dann kann es ja nun langsam mal losgehen....

2
21.07.11 18:11
der Zug ist auch voll und wir können dann mal gen Norden !

Gruss Steffen
Nur wer an sich glaubt, kann anderen helfen, an sich zu glauben.
Antworten
Alfgolf2:

dieser Satz ist der interessanteste

2
21.07.11 19:30
We are in advanced stage discussions with multiple financing providers on various term sheets !!!!

vielleicht kaum eine Verwässerung der Aktienzahl:)

Gruss
Nur wer an sich glaubt, kann anderen helfen, an sich zu glauben.
Antworten
BioLogic:

Mensch

3
21.07.11 20:46
Da hab ich gerade richtig gesammelt ;)

Hihi

LG

Aber könnten wie immer mehr sein....

Naja man kann nicht alles haben,
Posts sind keine Empfehlung zum Kauf oder Verkauf.
Alle Posts stellen nur meine eigene Meinung dar.
Antworten
Mr. Dino:

Peru hält Bergbauverträge ein

3
29.07.11 00:31
Gerade auf Goldinvest.de gelesen...
Bezieht sich auf die Bedenken von Avalanche... ich persönlich glaube, diese Aussage sorgt für wesentlich mehr Klarheit und Sicherheit.

Hier die Meldung vom 28.07.2011

Agência Latina Press
Peru wird bestehende Bergbau-Verträge einhalten

Wie Agência Latina Press schreibt wolle die Regierung von Peru bestehende Bergbau-Verträge respektieren und bestehende Vereinbarungen nicht brechen. Carlos Herrera Descalzi, bald Minister für Energie und Bergbau machte diese Aussage in einem Interview.

Quelle: www.goldinvest.de/index.php/...VEST.de+%C2%BB+Die+Redaktion%29
Antworten
Mr. Dino:

Tamerlane jetzt auch bei TWITTER

3
31.07.11 18:07
Für alle Interessierten und Investierten nicht nur mit Twitter Account:

Tamerlane geht in die mediale Offensive und bietet allen interessierten auf ihrer Homepage an, Follower zu werden. Scheinbar machen sich die neuzugänge im Management bzw. in entscheidender Stelle langsam bezahlt. Das Unternehmen wird weiteren Bekanntheitsgrad erlangen. Dies sorgt -hoffentlich- für gesteigerte Aufmersamkeit bei entsprechenden Investoren, besonders jetzt, da weitere Möglichkeiten (vgl. #65) zur Finanzierung diskutiert werden.

Daumen hoch: Gefällt mir!
Antworten
Mr. Dino:

News vom 02.08.2011 zum Privat Placement u. Kredit

2
13.08.11 13:46
Mit etwas Verspätung auch in diesem Thread die News vom 02. August 2011.
Aus meiner Sicht will Tamerlane so früh wie möglich die Pine Point Mine reaktivieren und baut fleissig an der Infrastruktur. Uns kann es nur recht sein: Je eher Tamerlane dort in Produktion geht, desto eher hat das Unternehmen Cashflow aus dem Verkauf der Rohstoffe.

Hoffen wir, das sich der derzeitige Kurs möglichst rasch erholt.


Hier die News:

Tamerlane Closes C$1.0 Million Private Placement and Draws Down US$2.5 Million from Credit Facility

Tamerlane Ventures Inc. ("Tamerlane" or the "Company") (TSX-V: TAM) is pleased to announce that the Company has closed the previously announced private placement with Renvest Mercantile Bancorp Inc., through its Global Resource Fund (“Global”), the Company’s current lender.  The Company issued 3,846,154 common shares of Tamerlane at C$0.26 per share for a total equity investment of C$1.0 million.  The transaction has been approved by the TSX Venture Exchange.  The private placement of common shares carries a four month hold period.  No finder’s fee was paid.

As previously announced on July 21, 2011, Global has agreed to subscribe for an additional C$1.0 million and be the lead order in a future equity placement the Company will undertake as part of the larger scale financing the Company is planning to complete later this fall.  This tranche of equity is expected to be priced in the context of the market at the time and is expected to be issued at the same price and terms as subscriptions by other investors.

In order to proceed with advancing the Pine Point Project and incurring capital expenditures, Global has agreed to advance the second US$5.0 million tranche of the previously announced US$10.0 million debt facility, which was closed and announced on December 16, 2010.  A US$50,000 extension fee was paid to Global to reinstate the facility.  The full US$5.0 million will be available for general corporate purposes, including continuation of development engineering, and for the purchase of long-lead items and equipment available on the secondary market, which can be purchased at deep discount to the prices used in the feasibility study.  All other conditions on the Company’s ability to draw on the second US$5.0 million tranche remain the same.  The Company has drawn down US$2.5 million of these funds and issued 250,000 common shares of Tamerlane to Global as a loan draw down fee.
Antworten
BioLogic:

PPP

4
13.08.11 15:00

July 29.2011  

http://www.tamerlaneventures.com/images/pdf/TAM_IP_July_26_29_2011_v8_FF.pdf

www.tamerlaneventures.com/images/pdf/TAM_IP_July_26_29_2011_v8_FF.pdf

 

LG

Marc

Posts sind keine Empfehlung zum Kauf oder Verkauf.
Alle Posts stellen nur meine eigene Meinung dar.
Antworten
BioLogic:

Und wieder aufgestockt !

3
16.08.11 23:49
heute in Kanada
Posts sind keine Empfehlung zum Kauf oder Verkauf.
Alle Posts stellen nur meine eigene Meinung dar.
Antworten
Avalanche:

Kommende Bergbausteuer in Peru

2
29.08.11 16:28
www.goldinvest.de/index.php/...bausteuer-ist-auf-dem-weg-21962
Antworten
Mr. Dino:

Tamerlane Reports Second Quarter 2011 Financials

4
29.08.11 21:17
Der am 26.08.2011 herausgegebene Report gibt eigentlich nur das wieder, was im Vorfeld bzw. während des Pine Point Minen-Aufbaus zu erwarten ist. Die Explorationsbohrungen werden gerade abgeteuft - nach Aussage von Tamerlane ist mit der Veröffentlichung der Bohrergebnisse ab etwa Ende September zu rechnen. Voraussetzung dafür sind natürlich durchgeführte mineralogische Tests im Hinblick auf einen abbauwürdigen Erzgehalt.


Hier der Bericht:

Tamerlane Reports Second Quarter 2011 Financials

Tamerlane Ventures Inc. ("Tamerlane" or the "Company") (TSX-V: TAM) announces a net loss of $1,798,373 or $0.03 per share for the six months ended June 30, 2011, compared to a net loss of $684,661 or $0.01 per share for six months ended June 30, 2010 in the same period of the prior year. At June 30, 2011 the Company had working capital of $2,922,488 compared to $2,726,220 at March 31, 2011, an increase of $196,268. The net increase was the result of the exercise of warrants issued in connection with private placements completed on December 17 and 21, 2009. At August 26, 2011, the Company had approximately $5.0 million of cash. With a full draw down of the last US$2.5 million bridge facility, the Company will have access to $7.5 million of cash resources which can be used for working capital.

For more details regarding the Company’s unaudited condensed consolidated interim financial statements and management’s discussion and analysis for the six months ended June 30, 2011, which have been filed on www.sedar.com, and are also available on the Company’s website at www.tamerlaneventures.com

www.tamerlaneventures.com/index.php/...quarter-2011-financials
Antworten
Mr. Dino:

Minensteuer in Peru

2
02.09.11 23:51
Hier die News vom 2.Sept. 2011 über die geplante Minensteuer von Goldinvest.


Der Link:
www.goldinvest.de/index.php/...lament-eingebracht-werden-22052

Neue Minensteuer soll schon in zwei Wochen ins Parlament eingebracht werden

Die neue, linksgerichtete Regierung Perus plant, einen Gesetzentwurf zur Erhöhung der Gebühren für Bergbauunternehmen in den kommenden zwei Wochen in den Kongress einzubringen. Das erklärte der Finanzminister des südamerikanischen Landes am gestrigen Donnerstag.

Sollte es verabschiedet werden, würde das Gesetz das aktuelle Gebührensystem ersetzen. Die Zahlungen würden dann auf den operativen Gewinnen basieren, statt auf dem Umsatz, so Minister Luis Miguel Castilla, der damit bisherige Aussagen von Regierung und Branchenmitgliedern bestätigte.

Gegenüber ausländischen Journalisten erklärte Castiall, dass man hoffe, dass das Gesetz schnell beschlossen und dann sofort implementiert werde. Premierminister Salomon Lerner sagte in der vergangenen Woche, dass die Minenfirmen und die Regierung übereingekommen sein, dass die neuen Gebühren rund 1 Mrd. Dollar pro Jahr einbringen solle. Die Gebührenraten, die diesen betrag zusammen bringen sollen, werden aber noch diskutiert.

Die Erzielung neuer Einnahmen von Bergbaufirmen, die Gewinne schreiben, um Armutsbekämpfungsmaßnahmen zu finanzieren, war eines der wichtigsten Wahlversprechen des neuen, linksgerichteten Präsidenten Perus, Ollanta Humala, der im Juli sein Amt angetreten hatte.

Peru ist einer der größten Metallexporteure weltweit.
Antworten
madold:

Was gibts für Neuigkeiten am Pine Point Projekt?

3
20.09.11 23:49
... Hintergrundwissen zum Zeitvertreib. Nur nicht auf den Kurs schauen (wer investiert ist), wer neu rein möchte, der hat geniale Einstiegskurse. Zn-Preise sind gut. Hoffe, wie alle, auf baldige Produktionsaufnahme und positiven Cash-Flow.
www.tamerlaneventures.com/images/pdf/PPP-Summer2011-doc.pdf
Antworten
Alfgolf2:

news

3
21.09.11 19:12
tmx.quotemedia.com/...le.php?newsid=44677507&qm_symbol=TAM

beschriebenes Problem, der Aktienkurs............

ACH NEEEEEEEEEEEEEEEEEEEEE !!
Nur wer an sich glaubt, kann anderen helfen, an sich zu glauben.
Antworten
BioLogic:

alles schmiert ab...

 
21.09.11 19:14
krass
Posts sind keine Empfehlung zum Kauf oder Verkauf.
Alle Posts stellen nur meine eigene Meinung dar.
Antworten
BioLogic:

20%

 
21.09.11 19:14
nicht schlecht :D
Posts sind keine Empfehlung zum Kauf oder Verkauf.
Alle Posts stellen nur meine eigene Meinung dar.
Antworten
BioLogic:

massaker

4
05.10.11 17:46
....

Posts sind keine Empfehlung zum Kauf oder Verkauf.
Alle Posts stellen nur meine eigene Meinung dar.
Antworten
Alfgolf2:

hab so meine Zweifel

3
06.10.11 18:58
ob sie wirklich bei dem Kurs die Finanzierung durchkriegen.....deswegen bin ich raus !!

nebenbei geht mir der Handel in D mit einem Spread immer von 30-40 % auf den Allerwertesten !!

und in Kanada ist es viel zu teuer.....

ich wünsche aber meiner Gruppe und Investierten das  TAM noch abgeht wie nix.....

die Vorraussetzungen sind nach wie vor da !!

Gruss
Nur wer an sich glaubt, kann anderen helfen, an sich zu glauben.
Antworten
BioLogic:

ja,

4
06.10.11 19:00
die Finanzierung ist das größte, aber ich denke das MM wartet, bis die politischen Börsen endlich Geschichte sind und das Geld für alle Länder wieder fließt,

denn die Inflation wird dadurch hoch gehalten und rohstoffe sind nunmal ein gutes Pendant um sein Geld in sicherheit zu bringen.

LG
marc
Posts sind keine Empfehlung zum Kauf oder Verkauf.
Alle Posts stellen nur meine eigene Meinung dar.
Antworten
BioLogic:

Neues fact sheet ist da!

3
10.10.11 17:56

Man beachte das rot geschriebene:  

Financing underway!!

www.tamerlaneventures.com/images/pdf/TAM-factsheet-Sept9-11-print.pdf

 

Also das wichtigste ist Finanzierung durchboxen, auch zu diesen Preisen, egal. Verwässerung ist da, aber wie viele Projekte gehen an der Finanzierung kaputt, oder nicht in Produktion ;)

LG

Marc

Posts sind keine Empfehlung zum Kauf oder Verkauf.
Alle Posts stellen nur meine eigene Meinung dar.
Antworten
Arriba1:

@bio

 
20.10.11 02:11
danke nochmals *)  

wir  (Du / oder ich oder wer)   sollten  evtl. endlich mal einen thread mit dem aktuellen und aktualisierten STATUS der Explorer einbringen , nach dem internat. Schema,  
1. Reclamation
2.Care + maintainance
3.prospecting
4.Drilling
5.Resource Estimates
6.Scoping + PFS
7.Feasibility
8.Developement
9. EXTRACTION

da diese Angaben entscheidend mit dem Zeitfactor eines Invests verbunden sind.
man sollte also auf diese Art eben auch darauf hinweisen, das von Punkt 5 bis Punkt 8 und 9 schon mal einige Jahre mit den entsprechenden Kursschwankungen ins Land gehen können.
Da gibt es viele Personen , die das nicht kennen oder nur auf eine Empfehlung hin investieren und sich dann wundern.
Beispiele hierfür brauche ich nicht anführen, da hinreichend bekannt.
Möglich wärs oder ?

Schlaf mal drüber
Gruß
Arriba1
Antworten
BioLogic:

Hey arriba

3
21.10.11 22:36
Klar. , drüber geschlafen und super Idee

Jetzt nochmal drüber schlafen inwieweit wir das umsetzen, aber machen wir ja eh schon ;) in der Timeline ;) so in der Art?

GLG
Marc
Posts sind keine Empfehlung zum Kauf oder Verkauf.
Alle Posts stellen nur meine eigene Meinung dar.
Antworten
Schabo04:

News

2
24.10.11 17:34
Tamerlane Provides Update on Its Pine Point Project
BLAINE, WASHINGTON--(Marketwire - Sept. 21, 2011) -

Tamerlane Ventures Inc. ("Tamerlane" or the "Company") (TSX VENTURE:TAM) is pleased to provide an update on recent activities with respect to its Pine Point project in Canada's Northwest Territories. The Company continues to progress with resource delineation, geotechnical studies, environmental permitting, procurement and engineering activities.

Additional Resource and Reserve Delineation

In addition to the six underground deposits that are currently reported as reserves, the next deposits which will give the Company upwards of 15 years of reserves and resources have recently been drilled. Drilling has been completed on the W-85 deposit, where the historic resource (which is not NI 43-101 compliant and should not be relied upon) is 3.7 million tonnes containing an estimated 2.3% lead and 4% zinc. Core samples are currently being processed and assays should be available within 2 weeks. In addition, Tamerlane will be converting the N-204 resource to a reserve and has contracted with an outside firm to complete this work by year-end. Work will follow immediately with preparation of a NI 43-101 resource estimate for W-85.

A boundary survey of twenty-four claims that previously were not taken to lease has been contracted and is 50% complete. This will allow Tamerlane to convert all its remaining holdings at Pine Point to mining leases.

Geotechnical Studies

Fourteen soil test holes have been completed to provide data for the foundation design of the mill and the mine buildings. The next phase is to finalize the engineering design for these structures. Two consulting groups are currently working on the geotechnical design for the underground workings. A further drill program consisting of six holes to establish parameters for the freeze wall design is currently underway at the Pine Point site. The drilling will be instrumental in establishing the drilling parameters, equipment and bit specifications for completing the 300 freeze wall holes around the R-190 deposit. A consulting group is currently working on final engineering designs for the freeze wall.

Environmental Permitting

In 2008, the Mackenzie Valley Land and Water Board issued Tamerlane a Type "A" land use permit pertaining to the completion and construction of the main mine site at the R-190 deposit location at the Pine Point project. In 2009, Tamerlane received notice that the federal Minister of Indian and Northern Affairs had also approved and signed the project's water license. These permits remain in effect.

The Company has submitted an application to amend the Water License for the change of the access from a shaft to a ramp. This will also allow for reissuance of the Land Use Permit, with the result that both the Water License and the Land Use Permit will be available for the full maximum term of 5 years. The Company expects that the final approvals for this change can be obtained by the end of the year and anticipates that construction can begin immediately after approvals are received if financing is in place. The Company will post the environmental bond for construction at that time.

The Company is completing baseline studies for the additional five deposits that are currently carried in reserves and for the N-204 deposit. All permits for this work have been granted. It is expected that this work will be completed by year-end. This work does not affect the construction and mining of the R-190 deposit.

Procurement

The Company has recently hired a procurement professional and has begun actively sourcing quality used equipment for the Pine Point project. The flotation equipment that was purchased for the project is in transit to Seattle, Washington from Juneau, Alaska. The sourcing of other quality used equipment similar to these flotation units should provide Tamerlane with additional capital cost savings for the project.

Engineering

The definitive engineering for the project is ongoing and the Company is funded to complete this phase of the pre-construction work. Definitive engineering is proceeding both for the surface infrastructure and the underground workings. The Company currently has engaged numerous consultants to work on various aspects of the project. The project continues to be managed by Tamerlane's engineering staff.

Project Financing

The project financing work is proceeding and the Company continues to solicit more proposals for funding the project. The major hurdle to closing any funding is the current share price. To this end, the Company will be putting a significant amount of effort towards introducing the project to potential new shareholders.Recently the Company displayed and presented at the Cambridge Resource Investment Conference in Toronto, Ontario.The Company will be displaying at the Global Chinese Financial Forum conference in Toronto this weekend, September 23 – 25, 2011. The Company is currently fully funded to complete the current pre-construction work.

Project Economics

A recent economic review of the 2008 feasibility study has confirmed that the reported reserves and resources of the Pine Point project continue to be economic.The updated cash flow model continues to demonstrate robust economics, with a pre-tax internal rate of return on the project of 27% and pre-tax, pre-financing cash flow generated from the project of $207 million at US$1.10 lead and zinc prices.At US$1.10 lead and US$1.50 zinc prices, the pre-tax internal rate of return is 60% and pre-tax, pre-financing cash flow is $435 million. This cash flow does not include any inclusion or upside from the development of the N-204 or W-85 deposits.

Mike Willett, Chief Executive Officer, commented, "The various engineering projects underway will allow us to be ready to move into the construction phase quickly, once financing is in place. At this time the Company's primary focus is to introduce the project to institutions and analysts so that they can follow the progress of the Company as it moves towards construction of its Pine Point project. Tamerlane's current stock price and market capitalization do not reflect the fact that the Company has over $7.8 billion of metal in the ground, in reserves, resources and historic resources."

Conference Call

Tamerlane management will host a conference call on Thursday, September 22, 2011 at 11:00 am Pacific time (2:00 pm Eastern time) to discuss the Pine Point project and related developments. Mining analysts, investors and the media are invited to dial toll-free 1-800-619-4068 in Canada and the United States, or 1-517-308-9192 from international locations (normal toll rates do apply) and state the verbal passcode "Tamerlane". Please dial in approximately 5 minutes before the start of management's presentation. The presentation will be followed by a question and answer period.

The conference call will be available on the Tamerlane Ventures website at www.tamerlaneventures.com via a downloadable audio file.

tmx.quotemedia.com/...le.php?newsid=44677507&qm_symbol=TAM

LG Marcel
Antworten
BioLogic:

Und geht auch gleichmal

 
24.10.11 17:44
in canada 10% hoch

lg
Bio
Posts sind keine Empfehlung zum Kauf oder Verkauf.
Alle Posts stellen nur meine eigene Meinung dar.
Antworten
BioLogic:

hä aber die news ist schon vom

 
24.10.11 17:46
september :=)

lg
Posts sind keine Empfehlung zum Kauf oder Verkauf.
Alle Posts stellen nur meine eigene Meinung dar.
Antworten
Schabo04:

@all

2
24.10.11 17:53
mmmmmhhhhhhhhhhhh :-) Shit bin gerade aufgewacht, sorry Leute!!!
Aber die alte News und neu von mir eingestellt bewirkt vielleicht Wunder :-)
schaut mal auf den Kurs.

Sorryyyyyyyyyyy

LG Schabo04
Antworten
BioLogic:

;)

2
24.10.11 17:58
heheh

das war der zündstoff
Posts sind keine Empfehlung zum Kauf oder Verkauf.
Alle Posts stellen nur meine eigene Meinung dar.
Antworten
Mr. Dino:

;)

2
25.10.11 21:28
@Schabo04: Kommt vor... aber trotzdem eine gute und interessante Nachricht aus dem September. Besonders vor dem Hintergrund, dass TAM weiter exploriert und mit dem Beginn der technischen Bewertung und Umsetzung steht. In dem geposteten Bericht von Dir stehen ziemlich eindeutige Zahlen und Planungen für den nächsten Zeitraum.

Die zentrale Frage bleibt jedoch: Warum ist der Kurs in €/ct so gering? Bei den unter wirtschaftlichen Bedingungen förderbaren Reserven -die $-Preise stehen im oben geposteten Bericht von Dir - müsste der Kurs doch wesentlich höher liegen, oder? Hast Du da vielleicht eine Antwort parat?
Antworten
Arriba1:

@bio Beispiel

2
25.10.11 22:55
""Klar. , drüber geschlafen und super Idee""

sorry , hat etwas gedauert, habe hier mal ein Beispiel  (nicht TAM, noch nicht)

http://www.ariva.de/forum/Formation-Metals-FCO-452104

mfg
Arriba1
Antworten
Arriba1:

@bio

2
29.10.11 19:36
danke, *)

les bitte nochmal den 2. Beitrag

mfg
Antworten
Mr. Dino:

Brent Jones ist wieder bei Tamerlane an Bord

3
08.11.11 20:14
In dieser Phase ist Brent Jones ein wichtiger Mann... aber hier die Nachricht.

Tamerlane Announces New Director of
Investor Relations and Corporate Communications

Tamerlane Ventures Inc. ("Tamerlane" or “the Company") (TSX-V: TAM) announced today that Mr. Brent Jones, will be returning to the Company, and has been appointed as Director of Investor Relations and Corporate Communications for the Company.  Mr. Jones will be responsible for all aspects of corporate communications with shareholders, media and all potential investors.  Mr. Jones brings over 20 years of experience in international business, having resided overseas for over twelve years.  As a spokesman for Panasonic Investor Relations, he traveled regularly to global economic centers, including the Far East, North America, Europe and the Middle East.  Further to this, Mr. Jones was responsible for Tamerlane investor relations from 2006 to 2009, a very important period for the company, during which extensive drilling and feasibility work was completed.
Mr. Jones graduated with a B.A. in Economics from Oakland University.  In addition to investor relations, Mr. Jones has extensive experience in corporate planning, communications and marketing.   He is also well-versed in IFRS reporting and disclosure practices.  Mr. Jones has represented various public companies to the investment community, including fund/portfolio managers, buy- and sell-side industry analysts, credit rating agencies, financial press and media, and the general public.

"Mr. Jones is an excellent addition to Tamerlane's team," commented Mike Willett, CEO of Tamerlane Ventures.  Mr. Willett continued, "We expect him to make an immediate contribution, since he has been to the Pine Point site and knows the project very well."
As part of a compensation package and subject to TSX approval, Tamerlane has granted 300,000 incentive stock options to Mr. Jones at an exercise price of CAD $0.14 per share. These options are granted for a five-year period, and the grant is subject to vesting provisions in accordance with the rules of the TSX Venture Exchange.
Antworten
madold:

Ein gutes Zeichen

5
08.11.11 21:22
Gute News, Dino! TAM rüstet auf, man hat Kommunikationsbedarf, da scheinen mögliche News bereits in der Pipeline zu stecken. Wird auch höchste Zeit, denn der SP ist unter aller Kanone, das Interesse an TAM's Story muss unbedingt geweckt werden. Zudem gehe ich davon aus, dass man potenzielle News (Finanzierung, Produktionsvorbereitungen etc.) vor allem professionell an den Markt bringen möchte. Mit einer erfahrenen "Speerspitze" à la Brent Jones sollte dies gelingen. Gruß, M.
Antworten
madold:

Updated Feasibility Study

5
22.11.11 22:20
Significant Mineralization at the Pine Point W-85
Updated feasibility study and National Instrument 43-101 mineral resource report completed. Tamerlane recently announced its updated reserve report for the Pine Point project. The current mineral inventory for the project is as follows:

Proven & Probable Reserves: 7.8 million tonnes (6.16% Zn, 3.01% Pb)
Measured & Indicated Resources: 8.0 million tonnes (2.26% Zn, 1.13% Pb)
Inferred Resources: 4.1 million tonnes (2.36% Zn, 0.82% Pb)

www.tamerlaneventures.com/index.php/...pine-point-w-85-deposit
Antworten
Mr. Dino:

Kern der Nachricht: Konstruktionsbeginn 2012

2
06.12.11 21:11
Die Nachricht, auf die wir alle gewartet haben :) Kern der Nachricht: Konstruktionsbeginn 2012! Ebenfalls kommt TAM seinen finanziellen Verpflichtungen -wie geplant- nach.

Hier die News:
Tamerlane Ventures Inc. (“Tamerlane” or the “Company”) (TSX-V: TAM) is pleased to announce that the Company has drawn down US$2.5 million of the previously announced US$10.0 million debt facility with Renvest Mercantile Bancorp Inc., through its Global Resource Fund (“Global”).  This draw down represents the final tranche of the current debt facility.  The debt facility was closed and announced on December 16, 2010.  Cash in the amount of US$62,500 and 250,000 common shares of Tamerlane were paid to the lender under the original terms of the $10 million dollar facility.

As of the date of the draw down, the Company had cash of over $4 million, including the proceeds from the last tranche of the debt facility.

Tamerlane will use the funds for advancing the Pine Point Project including definitive engineering and other work necessary to allow for the construction to commence in 2012.

Current activities ongoing include definitive engineering in several key areas; including final geotechnical design for the mine, final sediment settling pond design, and freeze wall final design. The company is currently negotiating key contracts that will expedite the construction on the project. In addition further expansion of reserves and resources are ongoing to extend mine life.

Tamerlane CEO Michael Willett commented: “Renvest has continued to support the company and the bridge facility has allowed management to move this project closer to construction. Ongoing definitive engineering has allowed us to de-risk the project in substantially all areas.  We have one of the few zinc plays out there that is permitted for construction and very advanced from an engineering standpoint. Our team has worked very hard to ready the project for construction.”
Antworten
BioLogic:

wie machen die das ??

 
06.12.11 21:16
=) keine ahnung , aber das ist sehr gut, da werd ich nochmal kaufen, sobald es möglich ist

LG
bio
Posts sind keine Empfehlung zum Kauf oder Verkauf.
Alle Posts stellen nur meine eigene Meinung dar.
Antworten
madold:

Freeze wall (zur Info)

4
06.12.11 22:27
Abgesehen von den guten News hat mich ein Begriff besonders interessiert: Freeze wall.

News, posting #96... Current activities ongoing include definitive engineering in several key areas; including final geotechnical design for the mine, final sediment settling pond design, and "freeze wall final design" ...

Offenbar hat man Grundwasserprobleme, denn sonst würde man keine "freeze wall" benötigen. Hierbei geht es um eine Vereisungstechnik an den Schachtwänden, die verhindert, dass Grundwasser seitlich in einen offenen Raum eindringt. Faszinierend, hatte ich zum ersten Mal in einer Doku zur Errrichtung der gigantischen Zugangsschächte des Teilchenbeschleunigers CERN gesehen, wo man über mehrere dieser Zugangsschächte die Rohrsegmente, Magnete und Kontroll- und Steuertechnik des 27 km langen Beschleunigers in den unterirdischen Ringtunnel eingeführt und an Ort und Stelle zusammengesetzt hat.

en.wikipedia.org/wiki/File:Shell_Freeze_Wall_Oil_Shale.png
Antworten
BioLogic:

Hab dennoch nochmal gekauft

3
06.12.11 22:36
der kurs sieht für mich gerade günstig aus =)

Gruss
Posts sind keine Empfehlung zum Kauf oder Verkauf.
Alle Posts stellen nur meine eigene Meinung dar.
Antworten
Schabo04:

@BIO

3
06.12.11 22:45
dann hättest du mal lieber 6 K gekauft und nicht nur 5 K
Sieht doch jetzt doof aus 39 K im Depot 40 K ist doch geiler :-)

LG Marcel
Antworten
BioLogic:

hahaha

2
06.12.11 23:10
ist doch Wurscht :)

war sowieso nur Bauchgefühl.... ist reiner Bauchtrade ;)

LG
Posts sind keine Empfehlung zum Kauf oder Verkauf.
Alle Posts stellen nur meine eigene Meinung dar.
Antworten
Mr. Dino:

Freeze Wall

3
07.12.11 22:35
@madold: Diese Freeze Walls sind wesentlich besser und flexibler zu handhaben als herkömmliche Spundwände - so, wie sonst üblich in der Baubranche. Natürlich muss man zuerst durch die oberen Bodenschichten die Miene in den Untergrund treiben, bis man auf das Festgestein trifft. Spundwände sind da relativ teuer, da man sehr viele lfd. Meter benötigt. Alternativ könnte man ja Bohrpfähle dicht an dicht einbringen... Nachteil: man muss sie danach wieder herauslösen. Freeze Walls sind aus bautechnischer Sicht dort das Mittel der Wahl. Und, ja klar gibt es dort Grundwasser - alles andere hätte mich auch gewundert :) Grundwasser, zu mindest eine "gesunde Bodenfeuchte" sind Voraussetzung für Freeze Walls. In der Pine Point Mine gibt es zahlreiche offene Gewässer - dies ist zum einen in den Firmenpräsentationen und zum anderen in den Satbildern, wie z.B. in Google Earth/-Maps zu sehen. Das angebliche Problem mit dem Grundwasser, daß Du ansprichst, sehe ich unkritisch: Jeder der ein Haus mit Keller baut wird dieses gegen das Eindringen von Wässern jeglicher Art sichern, z.B. durch den Bau einer sogenannten schwarzen Wanne. In entfernter Analogie zum Bau der Minenschächte bedeutet dies: Anlegen von Freeze Walls; danach Bau der Schächte, die selbst durch bautechn. Verfahren gegen das Eindringen von Wässern gesichert sind. Aus geotechnischer Sicht handelt TAM hier zielführend und folgerichtig.
Antworten
madold:

Freeze Wall

3
07.12.11 23:15
Hallo Mr. Dino.

Das kam wohl etwas ungeschickt rüber, in #98 von "Grundwasserproblemen" zu sprechen, denn dieses natürliche Vorkommnis lässt sich elegant durch Freeze Walls lösen. Es ging mir eigentlich viel mehr um die eingesetzte Technologie. Nachdem ich gesehen hatte (Doku CERN) welche Leistungsfähigkeit diese relativ einfache Verfahren besitzt, war dieses "Problem" für mich vom Tisch. Grundwasser gefriert im Kontakt mit der Freeze Wall bis zu einer gewissen Wandtiefe. Somit verankert sich diese Hülle selbst. Denn mit dem Eis hat man einen "nachwachsenden" Wandstoff, der nahtlos in den Schacht einzubringen ist und die Unebenheiten des Randbruchs auskleidet und abdichtet.

Sehr gut nachvollziehbar ist der von Dir beschriebene Vorteil gegenüber Spundwänden. Auch das leuchtet ein. Damit reduziert sich womöglich, zumindest stelle ich mir das so vor, auch die Gefahr nachrutschenden bzw. nicht kalkulierbarer Gesteinsbewegung. Allerdings kostet ein solcher Gefrierschrank etwas mehr als der Heimische, vor allem im Unterhalt.

Danke für den Hinweis. Gruß, mad
Antworten
Arriba1:

TAM news

4
08.12.11 17:44
Tamerlane will use the funds for advancing the Pine Point Project including definitive engineering and other work necessary to allow for the construction to commence in 2012.

tmx.quotemedia.com/...le.php?newsid=46663129&qm_symbol=TAM

Gruß
Arriba1
Antworten
madold:

TAM news: Hatten wir schon, Arriba1 ...

3
09.12.11 22:18
Schabo04:

News

3
12.12.11 16:12
tmx.quotemedia.com/...le.php?newsid=46797296&qm_symbol=TAM

LG Schabo04
Antworten
BioLogic:

WOOOOOW

3
12.12.11 22:08
Tamerlane Reports High Grade Intersection of 72.3%

sorry aber das ist der kracher... ich hoffe ich habe zum richtigen zeitpunkt nachgelegt !!

Posts sind keine Empfehlung zum Kauf oder Verkauf.
Alle Posts stellen nur meine eigene Meinung dar.
Antworten
Gelöschter Beitrag. Einblenden »
#108

madold:

Zink wird knapp, Tamerlane wird davon profitieren

2
06.01.12 22:15
Stammt zwar vom September 2011, doch zeichnet das kommende Bild zu Zink und TAM ...

www.mining.com/wp-content/uploads/2011/09/...ay_in_the_sun.pdf
Antworten
Mr. Dino:

2012 fängt ja gut an...

2
08.01.12 11:54
Hallo Investierte und Interessierte,

ein etwas verpätetes "Frohes Neues Jahr" an Euch Alle in diesem Forum. Der Kurs von Tamerlane scheint sich ja nun (endlich) wieder zu erholen! Hoffen wir, daß es sich so positiv weiterentwickelt. Konstruktionsbeginn der Miene ist ja nun dieses Jahr, so daß ich bei TAM -schon allein durch die Zinkknappheit, die Madold in #109 anspricht - von einem Kurssprung ausgehe...

Wie auch immer, ich freue mich auf ein erfolgreiches Jahr 2012 und zahlreiche interessante und gewinnbringende Diskussionen in diesem Forum!

Gruss
Mr. Dino
Antworten
madold:

Tamerlane in BNN-Interview ...

2
09.01.12 16:56
... als Zink-Profiteur vorgestellt. Könnte mit ein Auslöser für den Anstieg sein (ab Minute 7 ...) Interviewee > Christopher Eccelstone von Hallgarten & Company (sieeh #109)
www.bnn.ca/News/2012/1/6/...production-cuts-at-Allan-mine.aspx
Antworten
Arriba1:

TAM optiert

2
09.01.12 23:53
Tamerlane Options Indian Mountain Lake Volcanogenic Massive Sulphide Belt

tmx.quotemedia.com/...le.php?newsid=47374202&qm_symbol=TAM

da kommt wohl der Anstieg her.
"""
The BB Lake deposit was optioned to EGO Resources in 1979 and extensive exploration work was conducted on the property including 10,600 meters of diamond drilling. As a result of this drilling, a new global non-compliant NI 43-101 historic resource* was calculated on the BB Lake Property of approximately 3 million tons at 10% combined zinc and lead, 4 opt silver and 0.02 opt gold. """"

mfg
Arriba1
Antworten
madold:

Henne oder Ei? Dem Anstieg ist es egal ...

2
10.01.12 02:15
Das Interview ist vom 06.01. ... die News vom 09.01., der Anstieg läuft seit 2 Tagen. Was war also zuerst? Ist schon deshalb egal, weil auch im Finanzbereich gestaffeltes Marketing für die passenden Kursbewegungen sorgt. Deshalb schrieb ich ja: ... könnte mit ein Auslöser für den Anstieg sein.

Endlich Bewegung, uns Investierte freut es, darauf kommt es an. Gruß, mad.
Antworten
BioLogic:

Tamerlane

 
10.01.12 19:40
ist noch gar nicht auf dem Radar.

das freut mich auch sehr.

LG
Marc
Posts sind keine Empfehlung zum Kauf oder Verkauf.
Alle Posts stellen nur meine eigene Meinung dar.
Antworten
andech:

hi all

 
11.01.12 15:31

zuerst mal dankle für das bio timeline rennen.

ich profitiere ja mit , weil es mir unternehmen zeigt die ich nicht kannte, nicht verfolgte oder was auch immer.

eurer tamerlane hat schön performt in den letzten tagen .ich  finde auch das unternehmen interessant. einziges manko: das volumen. wenn an einem tag 3 typen und sei es zufällig aber gleichzeitig eben je 5000 € in diese firma investieren , knallt der kurs durch die decke. 

 

das handelsvolumen ist ehedem schon mickrig bei den timeline race firmen , aber bei TAM ist es am allermickrigsten.

noch beitrag von mir (to whom it may concern) : FMS finde ich super spannend und lege mir seit NOv immer mal wieder ein bisschen ins depot rein. würde mich interessieren was die Geologen-experten unter euch zu dem wert sagen.

 

grüsse

andech

Antworten
madold:

TAM heute: Wechselbad der Gefühle

 
20.01.12 17:24
Zuerst ein "Verkauf" (weggeworfen trifft das besser) von ca. 400K und - 14%, nun über 800K gehandelt in Kanada und + 14%. Staffellauf in entgegengesetzter Richtung? Schütteln? Was nun, ist das wenigstens jetzt die Richtung? Gruß, mad.
Antworten
BioLogic:

Da passt was nicht!

 
20.01.12 18:57
Posts sind keine Empfehlung zum Kauf oder Verkauf.
Alle Posts stellen nur meine eigene Meinung dar.
Antworten
BioLogic:

117

 
20.01.12 23:30
Nicht im negativen Sinne , eher positiv ;)

Hin und her taschen leer, wenn versteht was gemeint ist ^^

Lg
Bio
Posts sind keine Empfehlung zum Kauf oder Verkauf.
Alle Posts stellen nur meine eigene Meinung dar.
Antworten
Mr. Dino:

Tamerlane aquiriert weiteres Gebiet

2
29.01.12 21:42
Die Nachricht ist zwar schon etwas älter - stammt vom 16.1.2012- wurde aber an dieser Stelle noch nicht veröffentlicht. Das Gelände bietet aus meiner Sicht ein sehr hohes Explorationspotential. Bei den historischen Werten aus den 1960ern und der Sondierungsbohrung aus dem Jahr 2006 wird TAM mit den Planungen der Orientierungsbohrungen beginnen, um danach Infill-Bohrungen abteufen zu können. Somit steht einer aktuellen Quantifizierung der Kupfer, Gold und Silber-Gehalte zum einen und der Resourcenbewertung (in to) zum anderen nichts entgegen.

Hier die Nachricht:

Tamerlane Acquires Additional Properties in the Indian Mountain Lake Area

Tamerlane Ventures Inc. (“Tamerlane” or the “Company”) (TSX-V: TAM) is pleased to announce it has acquired the Susu Lake and North Zinc zones in Canada’s Northwest Territories as part of the acquisition of the Indian Mountain Lake property from Panarc Resources Ltd. (“Panarc”), announced on January 9 of this year.  The land areas comprised of these two zones were components of the Indian Mountain Lake option agreement between the two companies, but were not described in the January 9 press release pending the final procurement of necessary mineral claims.

The Susu Lake and North Zinc zone properties are part of the Panarc deal announced on January 9, and Tamerlane’s right to earn up to a 100% interest in these properties is identical to the terms described the Indian Mountain Lake acquisition announcement.

Signing of the definitive agreement is subject to fulfillment of a number of conditions, including TSX Venture Exchange approval, board approvals of both parties and secured creditor approvals, where required.

The Susu Lake volcanic belt is located 7 kilometers southeast of the Indian Mountain Lake Property in the Northwest Territories and contains 3 claims and a total of 2,582 acres.  The location of the Susu Lake copper showing and other copper showings within this large area of felsic volcanics indicates good potential for base metals deposits in this area.

In 1967, historical resources* were calculated at 142,500 tons grading 0.95% Cu from 9 diamond drill holes that were drilled by Indian Mountain Metal Mines.

The North Zinc zone is located on the south side of Tindale Lake, about 12 kilometers north of the BB Lake deposit, and the claims are contiguous with the Indian Mountain Lake claims, covering the northern extension of the volcanic belt.  The area contains the Taco Island and North Zinc zone showings.  Low grade gold-copper mineralization on Taco Island was recognized as early as 1949 and many of the trenches date back to that time.  During work in the 1990’s, samples were taken from historic trenches and returned values as high as 5.69% Cu and 740 ppb Au over 1 meter and grab samples contained up to 11%Cu, over 1600 ppb gold and 5 opt silver.  A 2006 exploration program provided samples which contained up to 4.2 g/t Au, 60 g/t Ag and 0.29% Cu and 1.33 g/t Au and 160 g/t Ag plus 7.6% Cu.
Antworten
Arriba1:

Tamerlane Completes Transaction to Acquire Indian

 
09.02.12 17:05
app.quotemedia.com/quotetools/...p=null&webmasterId=101020

Tamerlane will issue 500,000 common shares of the Company to Global Resource Fund.....

also hiermit bestätigt.
dann auf zu neuen Taten.

mfg
Arriba
Antworten
madold:

Zink Preise: Hoffentlich ist TAM bald so weit

 
19.04.12 10:01
www.finanzen.net/nachricht/rohstoffe/...sie-dank-China-1798907
Antworten
Gelöschter Beitrag. Einblenden »
#122

BioLogic:

Sie machen ernst

2
19.04.12 22:58
Präsentation in Asia.

We're not gonna sell this project, we're not gonna look for joint venture Partner. We will bring this project under name of tamerlane into production, !

LG

Posts sind keine Empfehlung zum Kauf oder Verkauf.
Alle Posts stellen nur meine eigene Meinung dar.
Antworten
BioLogic:

Interview

2
19.04.12 23:04
Tamerlane Ventures - Finanzierung steht! 13308003
Tamerlane Ventures Inc. is an exploration and development mining company with advanced base metal development projects in Canada and Peru.
Antworten
Arriba1:

TAM heute

3
19.04.12 23:27
lediglich 68,5k shares runter auf 0,14cad.  Und das bei der Meldung.

Die Zeit für reelle Kursbewertungen bei Explorern  ist noch nicht wieder reif .

Wenn sich die makroökonomischen daten nicht gravierend ändern, könnte sich dieser zustand allgemein gesehen noch etwas hinziehen. Tam macht da leider keine Ausnahme.

in 07.2011 hab ich mal eine Liste aller Pinetree invests gemacht, danach sind von 120 titeln nur noch max 1/4 im plus oder pari.

mfg
Arriba
Antworten
madold:

Sorry, hab Euch eine alte News aufgetischt

 
20.04.12 00:16
Natürlich stimmt das mit der Brückenfinanzierung, nur wurde dies bereits im Dezember 2010 verkündet. Seit dem hat sich hier nicht viel abgezeichnet. Bis auf das PDAC-Interview und die Asien-Präsentation. Schade. Hab übrigens um Löschung gebeten.
Antworten
madold:

Ab 2014 ist mit einem Zinkdefizit zu rechnen.

 
22.04.12 22:51
Zinc
The third horse in this race is zinc and it is one that could well see some of the smaller diversifieds surprising at the finish line.
...
Scotiabank'sPatricia Mohr is also a fan of zinc writing recently, "Zinc may represent the next big base metal play. Zinc will shift into ‘deficit' (at latest by 2014) due to ongoing demand growth in the face of significant global mine depletion in mid-decade."
...
The most interesting bit of all this is that none of the majors are investing significantly in zinc. Reinvestment in zinc is being left to some of the smaller zinc miners like Nyrstar."

Anmerkung: ... und Tamerlane, die in puncto Timing (Produktionsbeginn 2014 !!! ... siehe neue Präsentation, Posting #123) hervorragend in die Spitze der Zinknachfrage passen werden.

us4.campaign-archive1.com/...mp;id=4f002734f2&e=f2af11229b
Antworten
madold:

TAM erhält Land- und Wasserrechte

 
26.04.12 00:14
Tamerlane Receives Updated Land Use Permit and Water License for Its Pine Point Project

VANCOUVER, BRITISH COLUMBIA--(Marketwire - April 25, 2012) - Tamerlane Ventures Inc. ("Tamerlane" or the "Company") (TAM.V - News) announced today that the Federal Minister of Aboriginal Affairs and Northern Development Canada has approved and signed a 5-year extension to Tamerlane's Type A Water License for the Pine Point Project.

Tamerlane also received its updated Type A Land Use Permit in March of this year. The Company's Land and Water permits are valid for the maximum term allowable, which is 5 years, encompassing the construction and mining operations at the R-190 zinc-lead deposit.

finance.yahoo.com/news/...s-updated-land-permit-133000770.html
Antworten
Schabo04:

News

2
19.06.12 14:55
Tamerlane Provides Update on Summer Work Program at Indian Mountain Lake
BLAINE, WASHINGTON--(Marketwire - June 19, 2012) -

NOT FOR DISTRIBUTION TO U.S. NEWSWIRE SERVICES OR FOR DISSEMINATION IN THE UNITED STATES. ANY FAILURE TO COMPLY WITH THIS RESTRICTION MAY CONSTITUTE A VIOLATION OF U.S. SECURITIES LAW.

Tamerlane Ventures Inc. ("Tamerlane" or the "Company") (TSX VENTURE:TAM) is pleased to announce that the Company has completed an assessment program at its Indian Mountain Lake property. Tamerlane conducted a geological assessment of the BB Lake deposit at Indian Mountain Lake to confirm historic grades and tonnages with the objective of converting the historic resource on the deposit to a NI 43-101 compliant resource.

The Indian Mountain Lake property is in a relatively unexplored massive sulphide mining camp that contains several volcanogenic base metal deposits. The four known deposits are the BB Lake, Kennedy Lake, Kennedy Lake West, and Susu Lake. The BB Lake deposit has non-43-101 compliant historic resources* estimated at 3.0 million tonnes at 10% combined Zn-Pb-Cu, 4.0 opt Ag, and 0.02 opt Au. In addition to these, there are eleven other base metal showings located on the Indian Mountain Lake property.

The assessment program included an on-site geological investigation/assessment of the BB Lake property to locate historical drill holes and re-log previously drilled core samples. The assessment team consisted of two Tamerlane geologists and two geologists from Aurora Geosciences Ltd., of Yellowknife, NWT.

As a result of the assessment program, all high grade drill holes were logged in the field and will be transported to Yellowknife for sampling and assaying. Historic drill hole collars were also located.

The next steps in the assessment of the Indian Mountain Lake property will be to re-assay core to confirm historic grades and tonnages, which are necessary to bring the BB Lake deposit resources into NI 43-101 compliance. Tamerlane also plans to conduct confirmation and exploration drilling to test the BB Lake ore body at depth.

Mike Willett, CEO of Tamerlane, commented, "The recent program was very successful as the site was easily accessible, with all of the previously drilled core intact and undisturbed. Based on Tamerlane's work to date, we believe there is significant potential at Indian Mountain Lake given the nature of the known VMS deposits. We believe this greenstone belt could host sizable deposits similar to those found in the Flin Flon camp."

*Historical resources referred to above are not in accordance with current NI 43-101 standards and the company is not treating them as current mineral resources. Historical mineral estimates should not be relied upon and a qualified person has not done sufficient work to date to classify the historic estimates as current mineral resources.  

About Tamerlane Ventures Inc.

Tamerlane Ventures Inc. is an exploration and development mining company with advanced base metal development projects in Canada and Peru. The Company's immediate focus is bringing the 100%-owned Pine Point Project to production. The Company is currently in the financing phase and expects to commence construction following financing. Tamerlane plans to sell the well-known, Pine Point Concentrates to various smelting facilities around the world. The Company also plans to develop its Los Pinos heap leach copper project in Peru.

tmx.quotemedia.com/...le.php?newsid=52125522&qm_symbol=TAM
Antworten
Arriba1:

TAM Strategy LONG

 
14.08.12 01:53
hier ein Research Bericht vom Juni 2012 mit den Vorbehalten wegen Finanzierung sowie den Aussichten zum Zink-Preis. Lesenswert.

www.tamerlaneventures.com/images/pdf/2012/Tamerlane_jun12.pdf

mfg
Arriba
Antworten
BioLogic:

interessanter kursverlauf

 
12.09.12 00:10
letzte 2 tage, nicht
Posts sind keine Empfehlung zum Kauf oder Verkauf.
Alle Posts stellen nur meine eigene Meinung dar.
Antworten
madold:

Eher eigenartige Aktivitäten, Bio

 
12.09.12 00:17
Der Hinweis auf eine in Aussicht gestellte Finanzierung war wohl ausschlaggebend dafür, dass gestern in Kanada 19K Shares aus dem Ask gekauft wurden, um heute mit nur 15K Shares fast wieder zurück zum Ausgangsniveau zu gelangen. Noch reicht das nicht, um zu jubeln. Leider.
Antworten
madold:

Interessante Anwendung: Zink-Dünger

 
12.09.12 22:43
Großer Bedarf wird in der Landwirtschaft erwartet.

Zinc to Play Role in Agriculture Boom
...
Zinc is necessary for energy production, protein synthesis and growth regulation within plants, and can limit plant growth if it is not available in sufficient quantities during key stages of plant development. Stretching beyond plant characteristics, zinc deficiency in humans — which arises from consuming zinc-deficient foods — can retard growth, decrease immunity and delay puberty.

With food demand expected to increase by 50 percent over the next two decades, zinc producers are quickly realizing that demand for the metal will extend beyond the industrial core and out into the agricultural heartlands.
...

zincinvestingnews.com/...-fertilizer-prominex-teck-turkey.html
Antworten
BioLogic:

Hi mad

 
13.09.12 00:08
ich habe ein gutes Gefühl, warte ab.

Ich trade gerade viel Bauchgefühl. Mal sehen.

LG

Danke für interessante Beiträge
Posts sind keine Empfehlung zum Kauf oder Verkauf.
Alle Posts stellen nur meine eigene Meinung dar.
Antworten
madold:

Große Zinkminen schließen

 
21.09.12 20:54
Xstrata Zinc: Brunswick Mine schließt im März 2013 nach 48 Jahren Betrieb.

www.4-traders.com/XSTRATA-PLC-4003779/news/...ations-14246866/

Das ist nur der Anfang, schon wenig später werden weitere schließen. Zinkverknappung voraus.
Antworten
Arriba1:

@bio

 
22.09.12 01:58
na da wollen wir doch mal auf deinen Bauch vertrauen !

Und das uns Dein Bauch  weiterhilft.

Gruizii
Arriba
Antworten
BioLogic:

wie gesagt

2
22.09.12 20:01
long invest :D

also dauert noch 3 jahre
Posts sind keine Empfehlung zum Kauf oder Verkauf.
Alle Posts stellen nur meine eigene Meinung dar.
Antworten
Schabo04:

???

 
02.11.12 12:31
Wie ist jetzt das Bauchgefühl bei TAM ? Ist noch jemand investiert ?

Gruß Schabo04
Antworten
BioLogic:

jo bin noch drin

 
02.11.12 15:31
ek . 0.12 $

bei 0,025 $ gibts paar neue.

amount : 10.000 €

LG
Bio
Posts sind keine Empfehlung zum Kauf oder Verkauf.
Alle Posts stellen nur meine eigene Meinung dar.
Antworten
madold:

Ebenfalls.

 
02.11.12 17:24
3/4 von Bio ;-(
Antworten
Arriba1:

Tam news zur Finazierung

 
24.04.13 04:28
www.tamerlaneventures.com/index.php/...or-pine-point-financing

das wäre ein Anfang, bleibt fraglich ob Jennings das alles schafft.
Jennings gehört nach landläufiger Meinung zur B.Klasse der Financial Investors Agency Group.
allerdings mit langjähriger Erfahrung auf dem Gebiet der Rohstoffe und Minen.

Sollte es hier bald positive Ergebnisse geben, dann kann der Kurs neue Hochs erreichen.

mfg
Arriba
Antworten
BioLogic:

Interessant !

 
24.04.13 07:35
Danke !

Posts sind keine Empfehlung zum Kauf oder Verkauf.
Alle Posts stellen nur meine eigene Meinung dar.
Antworten
Arriba1:

TAM loan

 
13.06.13 21:29
jetzt  ca12mio$, kann evtl.  bis  2014  verlängert werden.

normale Frist wäre 10-2013.  

www.tamerlaneventures.com/index.php/...r-secured-bridge-loans-

mfg
Antworten
Arriba1:

jetzt aber richtig die Pleite vermeiden

 
23.08.13 00:29
Bitte lesen....

www.tamerlaneventures.com/index.php/...les-for-ccaa-protection

zur Erklärung CCAA hier bitte

www.pwc.com/ca/en/car/what-is-ccaa.jhtml

also letzte Möglichkeit die totale  Pleite zu verhindern.

Was geht danach denn los ?

Rebound ?  KE ?  Share Conso ?  was kommt noch alles hier ?

Mag bitte jemand mir eine positive Aussicht vermitteln.

danke u mfg
Arriba

 
Antworten
Arriba1:

TAM mit NI 43-101

 
04.09.13 23:03
eigentlich gar nicht schlecht. jetzt muß da nur noch jemand drauf einsteigen.

www.stockhouse.com/news/press-releases/...cal-report-for-a-new

wait and see

mfg
Antworten
Schabo04:

mhhhhh

 
23.10.13 18:10
still ruht der See ........ hat man schon das Licht ausgemacht ?

LG Schabo04
Antworten
Schabo04:

Neue Präsi

 
13.11.13 18:01
www.tamerlaneventures.com/images/...entation_November_2013.pdf

Schlauer werde ich jetzt auch nicht ..............
Antworten
Arriba1:

TAM Ni 43-101 fehlerhaft

 
15.11.13 21:04
web.tmxmoney.com/article.php?newsid=63921775&qm_symbol=TAM

Damit ist  TAM  wieder am Zug.

a never ending story
mfg
Arriba
Antworten
Arriba1:

TAM early warning notice

 
03.12.13 15:54
Global Resource Fund  erhält einige Mio  Aktien zusätzlich , dafür werden die
Zahlungsbedingungen und -termine verändert.

www.sedar.com./FindCompanyDocuments.do

ausserdem das Q3 -Filing.

cash kaum der Rede wert. ca  30k dürften jetzt noch da sein.

mfg
Antworten
Schabo04:

ist echt traurig

 
03.12.13 18:00
hätte nicht gedacht, dass TAM so abschmiert .... und kaum Interesse von Außen. Niemand will anscheinend investieren und das obwohl ZINK. Wenn man mal Canada Zinc betrachtet ...
Denke TAM ist einfach zu klein und uninteressant....

Was denkt ihr ?

LG Schabo04
Antworten
Auf neue Beiträge prüfen
Es gibt keine neuen Beiträge.

Seite: Übersicht 1 2 3 4 5 6 7

Börsen-Forum - Gesamtforum - Antwort einfügen - zum ersten Beitrag springen

Neueste Beiträge aus dem Tamerlane Ventures Inc. Forum

Wertung Antworten Thema Verfasser letzter Verfasser letzter Beitrag
8 158 Tamerlane Ventures - Finanzierung steht! Mr. Dino Bergi04 24.04.21 23:23
4 52 2012 Timeline Rohstoffrennen Teil1 BioLogic Teras 27.02.14 05:51