Ein riesen ROE
wurde in die explorer timeline aufgenommen.
http://www.questrareminerals.com/
A National Instrument 43-101 compliant resource estimate for its B-Zone rare earth deposit was completed by Wardrop Engineering in April 2010. The base-case resource was estimated using a Total Rare Earth Oxide (TREO) cut-off grade of 0.85% TREO. At this cut-off, the B-Zone hosts an Inferred Resource of 114.8 million tonnes grading 0.999% TREO, 1.973% zirconium oxide, 0.208% niobium pentoxide, 0.053% hafnium oxide and 0.082% beryllium oxide. In addition, Table 2 illustrates the grade averages for all of the Rare Earth oxides at the various cut-offs.
Inferred 114,8m tonnen @1.973 % Zirconium Oxide recoverable metal 2,265,458mt bei $/kg $7,60 ergibt das 17,217,479,204mrd ----ja richtig nur das zirconium
weiter
Inferred 114,8m tonnen @ niobium oxide 0,2080% recoverable metal 238,832t bei $/lb $7
ergibt das 3,685,738,541.mrd
und weiter =)
Inferred 114,8m tonnen @ hafnium oxide 0,053% recoverable metal 60000t bei $/kg $200 ergibt das 12,171,238,000 mrd
egal weiter =)
Inferred 114,8m tonnen @ Beryllium 0,0820% recoverable metal 94,155t bei $/lb $20 ergibt das 4,151,518,686mrd
41,424m shares outstanding !!!!!!
Fully Diluted: 48.5 million
ergibt bei nur dem Projekt ýMetalwert Inferred 37,225,974,431Mrd =)
http://www.questrareminerals.com/strangelakeproject.php
scoping studie q 2 /10 erwartet
wie immer beste Grüße
Bio
wurde in die explorer timeline aufgenommen.
http://www.questrareminerals.com/
A National Instrument 43-101 compliant resource estimate for its B-Zone rare earth deposit was completed by Wardrop Engineering in April 2010. The base-case resource was estimated using a Total Rare Earth Oxide (TREO) cut-off grade of 0.85% TREO. At this cut-off, the B-Zone hosts an Inferred Resource of 114.8 million tonnes grading 0.999% TREO, 1.973% zirconium oxide, 0.208% niobium pentoxide, 0.053% hafnium oxide and 0.082% beryllium oxide. In addition, Table 2 illustrates the grade averages for all of the Rare Earth oxides at the various cut-offs.
Inferred 114,8m tonnen @1.973 % Zirconium Oxide recoverable metal 2,265,458mt bei $/kg $7,60 ergibt das 17,217,479,204mrd ----ja richtig nur das zirconium
weiter
Inferred 114,8m tonnen @ niobium oxide 0,2080% recoverable metal 238,832t bei $/lb $7
ergibt das 3,685,738,541.mrd
und weiter =)
Inferred 114,8m tonnen @ hafnium oxide 0,053% recoverable metal 60000t bei $/kg $200 ergibt das 12,171,238,000 mrd
egal weiter =)
Inferred 114,8m tonnen @ Beryllium 0,0820% recoverable metal 94,155t bei $/lb $20 ergibt das 4,151,518,686mrd
41,424m shares outstanding !!!!!!
Fully Diluted: 48.5 million
ergibt bei nur dem Projekt ýMetalwert Inferred 37,225,974,431Mrd =)
http://www.questrareminerals.com/strangelakeproject.php
scoping studie q 2 /10 erwartet
wie immer beste Grüße
Bio