Vorsicht ist geboten, zu mal BR hier mitmischt.
|
Fresnillo meldet Produktionszahlen für Q3/17
otp.investis.com/clients/uk/fresnillo1/rns/...mp;newsid=943975
Fresnillo meldet Produktionszahlen für 2017
Overview
Record annual silver production of 58.7 moz (including Silverstream) up 16.6% vs. 2016, in line with guidance primarily as a result of the first complete year of San Julián (phase I) operating at full capacity and the start-up of operations at San Julián (phase II)
4Q17 silver production of 16.0 moz (including Silverstream) up 20.3% vs. 4Q16 due to the start-up of operations at San Julián (phase II)
Quarterly silver production increased 10.5% vs. 3Q17 due to the first complete quarter of San Julián (phase II) operating at full capacity, higher ore grade at Fresnillo and higher volume of ore processed at Saucito
Annual gold production of 911.1 koz exceeded guidance principally as a result of the full year operations at San Julián (phase I). Gold production slightly decreased -2.6% vs. 2016 due to the expected lower reduction of gold inventories and the anticipated lower ore grade deposited at the leaching pads at Herradura
Quarterly gold production of 232 koz decreased -13.4% vs. 4Q16 due to a lower reduction of gold inventories at Herradura
otp.investis.com/clients/uk/fresnillo1/rns/...mp;newsid=969816
Fresnillo meldet Produktionszahlen für Q1/18
www.fresnilloplc.com/media/367269/...n-report25-april-2018.pdf
Fresnillo meldet Produktionszahlen für Q2/18
otp.investis.com/clients/uk/fresnillo1/rns/...p;newsid=1124683
Fresnillo meldet Ergebnisse für H1/18
www.mining.com/...espite-profit-drop-silverstream-revaluation/
www.fresnilloplc.com/media/375612/1h18-interim-report-final.pdf
Fresnillo meldet Produktionszahlen für Q3/18
Overview
•Quarterly silver production of 15.5 moz (including Silverstream), up 6.3% vs. 3Q17 due to the contribution of the new Pyrites Plant, higher ore grades at Fresnillo, Herradura and Ciénega, and higher volumes of ore milled at San Julián phase II. 3Q18 production in line with 2Q18.
•Year to date silver production (including Silverstream) of 46.3 moz, up 8.5% vs. YTD17 mainly as a result of the start of operations at San Julián JM (PhaseII) in July 2017.
•Quarterly gold production of 225 koz, down 3.5% vs. 3Q17 as a result of higher than normal speed in the recovery rate at the leaching pads in 3Q17 and the lower grade and volume of ore deposited on the pads at Herradura in 3Q18.
•Quarterly gold production down 3.7% vs. 2Q18 mainly due to a lower speed in the recovery rate at the leaching pads at Herradura in 3Q18, and the lower ore grade and recovery rate at Noche Buena.
•Year to date gold production of 690 koz, up 1.7% vs. YTD17 mainly due tohigher ore grade at Saucito and a higher volume of ore processed at Noche Buena.
•Full year consolidated production guidance has been revised marginally: total gold production to 920 – 940 koz (previously 900 –930 koz) and total silver production to 62.0 – 64.5 moz (previously 64.5 – 67.5 moz) including Silverstream due to continued challenges at the Saucito and Fresnillo mines,which are currently being addressed.
www.fresnilloplc.com/media/383064/3q18-pr-24-oct-final.pdf
Unsicherheit über neues Minengesetz in Mexiko
uk.webfg.com/news/broker-recommendations/...nty--3609448.html
Fresnillo meldet Produktionszahlen für 2018
otp.investis.com/clients/uk/fresnillo1/rns/...p;newsid=1228157
|
Wertung | Antworten | Thema | Verfasser | letzter Verfasser | letzter Beitrag | |
9 | 154 | Größter primärer Silberproduzent Fresnillo | SilberFuchs2011 | Lalapo | 15.03.24 15:08 | |
5 | 57 | Fresnillo Plc (WKN: A0MVZE) | templer | templer | 25.04.21 00:21 |